Indian Railway main logo Welcome to Indian Railways
खोज :  
Increase Font size Normal Font Decrease Font size
View Content in English
National Emblem of India

हमारे बारे में

भारतीय रेलवे कार्मिक

समाचार एवं भर्ती

निविदाओं और अधिसूचनाएं

प्रदायक सूचना

यात्री सेवा

हमसे संपर्क करें



 
Bookmark Mail this page Print this page
QUICK LINKS
कैरेज व वैगन

Carriage & Wagon

  1. Introduction: -

 

C&W department of Agra division is comprised of following units.

 

a.Coaching Depot at Agra-cantt alongwith ART, ARMV

b.Coaching depot at Agra Fort.

c.Tank Wagon depot at Baad.

d.Coaching depot at Mathura.

 

  1. Cadre - Position :-

 

Sr. No.

Cadre - Position

Post / Class

SS

MOR

Vacancy

1.

Gazetted

(Mech.)

Sr. DME (C&W)

01

01

0

DME (C&W)

01

01

0

ADME (C&W)

02

01

01

Total

04

03

01

2.

Non Gazetted

C&W

III

469

237

223

IV

296

251

45

Total

765

488

268

 

3.Depot wise train examining facilities.

 

A. Coaching Depot, Agra Cantt.

 

Coaching depot AGC is engaged with Primary Maintenance of Mail/Express, Passenger trains. At AGC originating, terminating, rolling-in, rolling-out examination and watering of enroute Mail/Express trains are being done.

 

a. Work load

 

Primary maintained trains at AGC.

 

Train No.

Ex - To

Train name

Load

Frequency

361/362 (05rakes)

AGC-DLI-SRE

Passenger

16 = 32

Daily

2177/2178

AGC-HWH

Chambal Express

16 = 32

Weekly

 

Trains Turn Round Attention at AGC.

 

Train No.

Ex - To

Train name

Load

Frequency

1339/1340

AGC-JHS

Passenger

10 = 20

Daily

1343/1344

AGC-GWL

Passenger

9=18

Daily

4211/4212

AGC DLI/LKO

Mail/Exp

23 = 46

Daily

2161/2162

AGC LTT

Lashkar Express

18 = 36

Weekly

 

Trains Watered on PF at AGC.

 

Train No.

Ex - To

Train name

Load

Frequency

1339/1340

AGC-JHS

Passenger

10 = 20

Daily

1347/1348

AGC-JHS

Passenger

10 = 20

Daily

3007/3008

SGNR-HWH

Toofan Express

12 = 24

Daily

4211/4212

AGC DLI/LKO

Mail/Exp

23 = 46

Daily

Others

POW, Yatra Spl, All Inspection Carriages, Spare & Party coaches.

Through Trains

On complaint basis.

 

 

Trains issued fresh BPC Ex-AGC.

 

Train No.

Ex - To

Train name

Load

Frequency

1361/1362

AGC-DLI-SRE

Passenger

18 = 36

Daily

2177/2178

AGC-HWH

Chambal Express

16 = 32

Weekly

 

Trains issued Vac/Air Pressure Continuity Certificate at AGC.

 

Train No.

Ex - To

Train name

Load

Frequency

4201/4202

MTJ-LKO

Mail/Exp

17 = 34

Daily

1339/1340

AGC-JHS

Passenger

10 = 20

Daily

1347/1348

AGC-JHS

Passenger

10 = 20

Daily

3007/3008

SGNR-HWH

Toofan Express

12 = 24

Daily

2403/2404

MTJ-ALD

Mail/Exp

14 = 28

Daily

 

Average No. of Pass through trains for Rolling In/Out examination

 

In Number.

Up Trains

Down Trains

Total Trains

34

34

68

 

Additional Miscellaneous Work Load:

a)Maintenance of Inspection Carriages.

b)Complaints of Goods trains.

c)On train spring change in Goods stock.

d)Maintenance of Weighing Machines over Agra Division (62 nos).

e)Maintenance of Fire Extinguishers over Agra Division (Approx700 nos)

f)Flying Squad works in section.

g)Maintenance of ART & ARME and rescue work.

h)Divisional Store (C&W) Management

i)Attention of the Sick Wagons Detached by Traffic.

 

8.Major Infrastructure Facilities

 

i.Coaching Sick line capacity:09 coaches

ii.Examination Pit line 01capacity:20 coaches

iii.Stabling line 01capacity:17 coaches

.

B.CARRIAGE DEPOT AGRA FORT (AF)

 

Coaching depot AF was a MG Terminal station, which is now engaged with BG Rake Maintenance of Mail/Express, Passenger trains to cater to services on newly BG converted section. At AF originating, terminating, rolling-in and rolling-out examination of enroute Mail/Express trains is being done.

 

a. Work load

 

1.Turn Round Attention of trains ( At JAB )

 

Train No.

Ex - To

Train name

Load

Frequency

283/282

KTT - JAB

Passenger

11=22

Daily

281/284

KTT - JAB

Passenger

10=20

Daily

1347/303

JHS -BKI

Passenger

10=20

Daily

293/1348

BXN- AF

Passenger

10=20

Daily

304/294

AF - BKI

Passenger

10=20

Daily

 

 

2.Trains issued Vac/Air Pressure Continuity Certificate at AF.

 

Train No.

Ex - To

Train name

Load

Frequency

283/282

KTT - AF

Passenger

11=22

Daily

281/284

KTT - AF

Passenger

10=20

Daily

1347/303

JHS -BKI

Passenger

10=20

Daily

293/1348

BXN- AF

Passenger

10=20

Daily

304/294

AF - BKI

Passenger

10=20

Daily

2987/2988

JP-GWL

Intercity Express

17=34

Daily

 

3.Average No. of Pass through trains for Rolling In/Out examination

 

In Number.

Up Trains

Down Trains

Total Trains

17

17

34

 

 

4.Additional Miscellaneous Work Load:

a.Complaints of Goods trains. ( At JAB )

b.On train spring change in Goods stock. At JAB )

c.Flying Squad works in section.

d.Attention of the Sick Wagons Detached by Traffic At JAB )

 

b, Major Infrastructure Facilities

 

j)Coaching Sick line NIL

k)Examination Pit lineNIL

l)Stabling lineNIL

 

C.Coaching Depot , MTJ

 

Coaching depot MTJ is engaged with Primary maintenance of Passenger train, Rake Maintenance of Mail/Express, Passenger trains. At MTJ originating, terminating, rolling-in and rolling-out examination of enroute Mail/Express trains is being done.

 

a. Work load

 

1.Primary maintenance of trains at MTJ.

 

Train No.

Ex - To

Train name

Load

Frequency

323/324

MTJ-BKI

Passenger

8=16

Daily

 

2.Trains Turn Round Attention at MTJ.

 

Train No.

Ex - To

Train name

Load

Frequency

127/28

MTJ-BXN

Passenger

7 = 14

Daily

151/52

MTJ-BXN

Passenger

7 = 14

Daily

185/86

MTJ-AWR

Passenger

12 = 24

Daily

255/56

MTJ-RTM

Passenger

7 = 14

Daily

4201/02

MTJ-LKO

Express

17 = 34

Daily

2403/2404

MTJ-ALD

Express

14 = 28

Daily

321/322

MTJ-AWR

Passenger

16=32

Daily

 

 

 

3.Trains Watered on PF at MTJ.

 

Train No.

Ex - To

Train name

Load

Frequency

127/28

MTJ-BXN

Passenger

7 = 14

Daily

151/52

MTJ-BXN

Passenger

7 = 14

Daily

185/86

MTJ-AWR

Passenger

12 = 24

Daily

255/56

MTJ-RTM

Passenger

7 = 14

Daily

4201/02

MTJ-LKO

Express

17 = 34

Daily

2403/04

MTJ-ALD

Express

14 = 28

Daily

321/322

MTJ-BKI

Passenger

7 = 14

Daily

 

4.Trains issued fresh BPC Ex-MTJ. 323/324

 

5.Trains issued Vac/Air Pressure Continuity Certificate at MTJ.

 

Train No.

Ex - To

Train name

Load

Frequency

127/28

MTJ-BXN

Passenger

7 = 14

Daily

151/52

MTJ-BXN

Passenger

7 = 14

Daily

185/86

MTJ-AWR

Passenger

12 = 24

Daily

255/56

MTJ-RTM

Passenger

7 = 14

Daily

323/324

MTJ-BKI

Passenger

7 = 14

Daily

4201/02

MTJ-LKO

Express

17 = 34

Daily

2403/04

MTJ-ALD

Express

14 = 28

Daily

 

6.Average No. of Pass through trains for Rolling In/Out examination

 

In Number.

Up Trains

Down Trains

Total Trains

18

18

36

 

7.Additional Miscellaneous Work Load:

 

a.Maintenance of Party coaches etc.

b.Complaints of Goods trains.

c.Flying Squad works in section.

d.Maintenance of BG Tool Van and rescue work.

e.Attention of the Sick Wagons Detached by Traffic.

f.ODC measurement of Military loads originating at MTJ.

 

8.Major Infrastructure Facilities

 

I.Coaching Sick line capacity:03 coaches

II.Examination Pit line 01capacity:10 coaches

III.Stabling line 01capacity:10 coaches

 

 

D. BAAD Tank Wagon Depot

 

C&W depot BAAD is carrying out Premium examination Intensive examination and repairs of tank wagon load required for Mathura Refinery. The depots activities can be summarized as follows

 

  1. Premium examination of BTPN rakes in yard.
  2. Intensive Examination of Tank loads in yard.
  3. Examination of Engineering Material train.
  4. ROH of 4 wheeler tank wagons and BTPN wagons.
  5. Sick line repair.
  6. Refinery attention.
  7. Upgradation of Black oil tank wagon for white oil and potable water.
  8. Complaints of through trains.

Refinery attention.

 

Activities :

Closing of master valve, testing of master valve, closing of Audco/Bottom discharge valve, fitting of flange of bottom discharge valve, sealing of top cover etc.

 

 




Source : CMS Team Last Reviewed on: 31-01-2011  


  प्रशासनिक लॉगिन | साईट मैप | हमसे संपर्क करें | आरटीआई | अस्वीकरण | नियम एवं शर्तें | गोपनीयता नीति Valid CSS! Valid XHTML 1.0 Strict

© 2010  सभी अधिकार सुरक्षित

यह भारतीय रेल के पोर्टल, एक के लिए एक एकल खिड़की सूचना और सेवाओं के लिए उपयोग की जा रही विभिन्न भारतीय रेल संस्थाओं द्वारा प्रदान के उद्देश्य से विकसित की है. इस पोर्टल में सामग्री विभिन्न भारतीय रेल संस्थाओं और विभागों क्रिस, रेल मंत्रालय, भारत सरकार द्वारा बनाए रखा का एक सहयोगात्मक प्रयास का परिणाम है.