Carriage & Wagon
- Introduction: -
C&W department of Agra division is comprised of following units.
a.Coaching Depot at Agra-cantt alongwith ART, ARMV
b.Coaching depot at Agra Fort.
c.Tank Wagon depot at Baad.
d.Coaching depot at Mathura.
- Cadre - Position :-
Sr. No. | Cadre - Position | Post / Class | SS | MOR | Vacancy |
1. | Gazetted (Mech.) | | 01 | 01 | 0 |
DME (C&W) | 01 | 01 | 0 |
ADME (C&W) | 02 | 01 | 01 |
Total | 04 | 03 | 01 |
2. | Non Gazetted | C&W | III | 469 | 237 | 223 |
IV | 296 | 251 | 45 |
Total | 765 | 488 | 268 |
3.Depot wise train examining facilities.
A. Coaching Depot, Agra Cantt.
Coaching depot AGC is engaged with Primary Maintenance of Mail/Express, Passenger trains. At AGC originating, terminating, rolling-in, rolling-out examination and watering of enroute Mail/Express trains are being done.
a. Work load
Primary maintained trains at AGC.
Train No. | Ex - To | Train name | Load | Frequency |
361/362 (05rakes) | AGC-DLI-SRE | Passenger | 16 = 32 | Daily |
2177/2178 | AGC-HWH | Chambal Express | 16 = 32 | Weekly |
Trains Turn Round Attention at AGC.
Train No. | Ex - To | Train name | Load | Frequency |
1339/1340 | AGC-JHS | Passenger | 10 = 20 | Daily |
1343/1344 | AGC-GWL | Passenger | 9=18 | Daily |
4211/4212 | AGC DLI/LKO | Mail/Exp | 23 = 46 | Daily |
2161/2162 | AGC LTT | Lashkar Express | 18 = 36 | Weekly |
Trains Watered on PF at AGC.
Train No. | Ex - To | Train name | Load | Frequency |
1339/1340 | AGC-JHS | Passenger | 10 = 20 | Daily |
1347/1348 | AGC-JHS | Passenger | 10 = 20 | Daily |
3007/3008 | SGNR-HWH | Toofan Express | 12 = 24 | Daily |
4211/4212 | AGC DLI/LKO | Mail/Exp | 23 = 46 | Daily |
Others | POW, Yatra Spl, All Inspection Carriages, Spare & Party coaches. |
Through Trains | On complaint basis. |
Trains issued fresh BPC Ex-AGC.
Train No. | Ex - To | Train name | Load | Frequency |
1361/1362 | AGC-DLI-SRE | Passenger | 18 = 36 | Daily |
2177/2178 | AGC-HWH | Chambal Express | 16 = 32 | Weekly |
Trains issued Vac/Air Pressure Continuity Certificate at AGC.
Train No. | Ex - To | Train name | Load | Frequency |
4201/4202 | MTJ-LKO | Mail/Exp | 17 = 34 | Daily |
1339/1340 | AGC-JHS | Passenger | 10 = 20 | Daily |
1347/1348 | AGC-JHS | Passenger | 10 = 20 | Daily |
3007/3008 | SGNR-HWH | Toofan Express | 12 = 24 | Daily |
2403/2404 | MTJ-ALD | Mail/Exp | 14 = 28 | Daily |
Average No. of Pass through trains for Rolling In/Out examination
In Number. | Up Trains | Down Trains | Total Trains |
34 | 34 | 68 |
Additional Miscellaneous Work Load:
a)Maintenance of Inspection Carriages.
b)Complaints of Goods trains.
c)On train spring change in Goods stock.
d)Maintenance of Weighing Machines over Agra Division (62 nos).
e)Maintenance of Fire Extinguishers over Agra Division (Approx700 nos)
f)Flying Squad works in section.
g)Maintenance of ART & ARME and rescue work.
h)Divisional Store (C&W) Management
i)Attention of the Sick Wagons Detached by Traffic.
8.Major Infrastructure Facilities
i.Coaching Sick line capacity:09 coaches
ii.Examination Pit line 01capacity:20 coaches
iii.Stabling line 01capacity:17 coaches
.
B.CARRIAGE DEPOT AGRA FORT (AF)
Coaching depot AF was a MG Terminal station, which is now engaged with BG Rake Maintenance of Mail/Express, Passenger trains to cater to services on newly BG converted section. At AF originating, terminating, rolling-in and rolling-out examination of enroute Mail/Express trains is being done.
a. Work load
1.Turn Round Attention of trains ( At JAB )
Train No. | Ex - To | Train name | Load | Frequency |
283/282 | KTT - JAB | Passenger | 11=22 | Daily |
281/284 | KTT - JAB | Passenger | 10=20 | Daily |
1347/303 | JHS -BKI | Passenger | 10=20 | Daily |
293/1348 | BXN- AF | Passenger | 10=20 | Daily |
304/294 | AF - BKI | Passenger | 10=20 | Daily |
2.Trains issued Vac/Air Pressure Continuity Certificate at AF.
Train No. | Ex - To | Train name | Load | Frequency |
283/282 | KTT - AF | Passenger | 11=22 | Daily |
281/284 | KTT - AF | Passenger | 10=20 | Daily |
1347/303 | JHS -BKI | Passenger | 10=20 | Daily |
293/1348 | BXN- AF | Passenger | 10=20 | Daily |
304/294 | AF - BKI | Passenger | 10=20 | Daily |
2987/2988 | JP-GWL | Intercity Express | 17=34 | Daily |
3.Average No. of Pass through trains for Rolling In/Out examination
In Number. | Up Trains | Down Trains | Total Trains |
17 | 17 | 34 |
4.Additional Miscellaneous Work Load:
a.Complaints of Goods trains. ( At JAB )
b.On train spring change in Goods stock. At JAB )
c.Flying Squad works in section.
d.Attention of the Sick Wagons Detached by Traffic At JAB )
b, Major Infrastructure Facilities
j)Coaching Sick line NIL
k)Examination Pit lineNIL
l)Stabling lineNIL
C.Coaching Depot , MTJ
Coaching depot MTJ is engaged with Primary maintenance of Passenger train, Rake Maintenance of Mail/Express, Passenger trains. At MTJ originating, terminating, rolling-in and rolling-out examination of enroute Mail/Express trains is being done.
a. Work load
1.Primary maintenance of trains at MTJ.
Train No. | Ex - To | Train name | Load | Frequency |
| MTJ-BKI | Passenger | 8=16 | Daily |
2.Trains Turn Round Attention at MTJ.
Train No. | Ex - To | Train name | Load | Frequency |
127/28 | MTJ-BXN | Passenger | 7 = 14 | Daily |
151/52 | MTJ-BXN | Passenger | 7 = 14 | Daily |
185/86 | MTJ-AWR | Passenger | 12 = 24 | Daily |
255/56 | MTJ-RTM | Passenger | 7 = 14 | Daily |
4201/02 | MTJ-LKO | Express | 17 = 34 | Daily |
2403/2404 | MTJ-ALD | Express | 14 = 28 | Daily |
321/322 | MTJ-AWR | Passenger | 16=32 | Daily |
3.Trains Watered on PF at MTJ.
Train No. | Ex - To | Train name | Load | Frequency |
127/28 | MTJ-BXN | Passenger | 7 = 14 | Daily |
151/52 | MTJ-BXN | Passenger | 7 = 14 | Daily |
185/86 | MTJ-AWR | Passenger | 12 = 24 | Daily |
255/56 | MTJ-RTM | Passenger | 7 = 14 | Daily |
4201/02 | MTJ-LKO | Express | 17 = 34 | Daily |
2403/04 | MTJ-ALD | Express | 14 = 28 | Daily |
321/322 | MTJ-BKI | Passenger | 7 = 14 | Daily |
4.Trains issued fresh BPC Ex-MTJ. 323/324
5.Trains issued Vac/Air Pressure Continuity Certificate at MTJ.
Train No. | Ex - To | Train name | Load | Frequency |
127/28 | MTJ-BXN | Passenger | 7 = 14 | Daily |
151/52 | MTJ-BXN | Passenger | 7 = 14 | Daily |
185/86 | MTJ-AWR | Passenger | 12 = 24 | Daily |
255/56 | MTJ-RTM | Passenger | 7 = 14 | Daily |
323/324 | MTJ-BKI | Passenger | 7 = 14 | Daily |
4201/02 | MTJ-LKO | Express | 17 = 34 | Daily |
2403/04 | MTJ-ALD | Express | 14 = 28 | Daily |
6.Average No. of Pass through trains for Rolling In/Out examination
In Number. | Up Trains | Down Trains | Total Trains |
18 | 18 | 36 |
7.Additional Miscellaneous Work Load:
a.Maintenance of Party coaches etc.
b.Complaints of Goods trains.
c.Flying Squad works in section.
d.Maintenance of BG Tool Van and rescue work.
e.Attention of the Sick Wagons Detached by Traffic.
f.ODC measurement of Military loads originating at MTJ.
8.Major Infrastructure Facilities
I.Coaching Sick line capacity:03 coaches
II.Examination Pit line 01capacity:10 coaches
III.Stabling line 01capacity:10 coaches
D. BAAD Tank Wagon Depot
C&W depot BAAD is carrying out Premium examination Intensive examination and repairs of tank wagon load required for Mathura Refinery. The depots activities can be summarized as follows
- Premium examination of BTPN rakes in yard.
- Intensive Examination of Tank loads in yard.
- Examination of Engineering Material train.
- ROH of 4 wheeler tank wagons and BTPN wagons.
- Sick line repair.
- Refinery attention.
- Upgradation of Black oil tank wagon for white oil and potable water.
- Complaints of through trains.
Refinery attention.
Activities :
Closing of master valve, testing of master valve, closing of Audco/Bottom discharge valve, fitting of flange of bottom discharge valve, sealing of top cover etc.