mRrj e/; jsyos North Central Railway

fuekZ.k laxBu bykgkckn Construction Organization, Allahabad

ifj;kstukvks dh xfr Project in Pogress

flfoy bathfu;fjax foHkkx Civil Engineering Department

o"kZ Year 2010-2011

ubZ ykbus ¼fuekZ.k½
Plan Head - 11 (New Lines)
CONSTRUCTION - STATUS OF NEW LINE WORKSAs on 30/06/2010
jkf'k djksM :Ik;sa esa
Amount in Crore of rupees
SNName of WorkCostOutlay 2010-11Exp. Till June '10Progress %
1xquk bVkok cjkLrk f'koiqjh & Xokfy;j & fHkUM ¼344-82 fd-eh-½540.9660.00499.1475%
Guna-Etawah via Shivpuri-Gwalior-Bhind (344.82 km)
2bVkok eSuiqjh ¼57-5 fd-eh-½142.4815.00111.9666%
Etawah-Mainpuri (57.5 km)
3yfyriqj&lruk] jhok & flUxjkSyh] ,oa egksck&[ktqjkgks ¼541 fd-eh-½925.00100.00467.4070%
Lalitpur-Satna, Rewa-Singrauli & Mahoba-Khajuraho (541 km.)
4vxjk&bVkok] cjkLrk Qrsgkckn o okg ¼110 fd-eh-½214.9060.00134.5774%
Agra-Etawah via Fatehabad & Bah (110 km.)
Total -683.4475.00611.1 
vkeku ifjorZu
Plan Head - 14 (Gauge Conversion)
CONSTRUCTION - STATUS OF GAUGE CONVERSION WORK
6eFkqjk & vpusjk ¼35 fdeh-½109.5020.0098.62100%
Mathura-Achnera (35 km)
7Xokfy;j & ';ksiqjdyka] dksVk rd foLrkj lfgr ¼284 fdeh-½1176.09000%
Gwalior – Sheopurkalan with extn. to kota (284 Km)
8/kkSyiqj & fljeq=k xaxkiqj flVh rd foLrkj lfgr] ¼144-6 fdeh-½622.4198.6200%
Dholpur – Sirmuttra with extn. to Gangapur City (144.6 Km)
Total -109.5020.0098.62 
nksgjh ykbu fcNkuk
Plan Head - 15 (Doubling)
CONSTRUCTION - STATUS OF DOUBLING WORK
9dkuiqj & iudh & 3ljh o 4Fkh ykbu ¼pj.k&A½] ¼9 fdeh-½100.164.0091.97100%
Kanpur-Panki- 3rd & 4th line. (Ph-I)
10VaqMyk & ;equk iqy ¼21 fdeh-½88.6214.5166.93Ph-I (80%)
Tundla – Yamuna Bridge (21 Km)Ph-II (70%)
11ekf.kdiqj & dVS;kMakMh ¼32-68 fdeh-½72.683.0062.59100%
Manikpur-Kataiyadandi (Phase-I) (32.68 km)
12Nsvksdh & yksgxjk ¼26-88 fdeh-½80.640.5078.89100%
Chheoki –Lohgara (Phase-II) (26.88 km)
13yksgxjk & dVS;kMakMh ¼32-30 fdeh-½77.882.0083100%
Lohgara - Kataiyadandi (Phase-III) (32.30 km)
14bykgkckn & lqcsnkjxat & 3ljh ykbu5.110.016.84100%
Allahabad-Subedarganj - 3rd line.
15iudh & Hkkmiqj3ljh ykbu54.676.0042.3296%
Panki-Bhaupur- 3rd line
17Hkhelsu & twgh ¼11-37 fdeh-½22.31.0028.89100%
Bhimsen-Juhi (11.37 Km).
Total -425.0924.02390.22 
;krk;kr lqfo/kk, & ;kMZ ds <kapsa esa ifjorZu rFkk vU; dk;Z
Plan Head - 16 (Traffic)
CONSTRUCTION - STATUS OF TRAFFIC WORK
18eqxyljka; & xkft;kckn & 7 vfrfjDr ywi ¼4 LVs'ku½17.090.1320.55100%
MGS-GZB: 7 Additional loops (4 stations) at Dagmagpur, Athsarai, Ramva & Kanspur Gugauli.
19vyhx< ta- & nwljh Cykd jsd lkbZfMax lfgr lh-Mh- lkbZfMax esa eky 'ksM dh f'k¶fVax vkSj flVh lkbM ij ;k=h o iklZy ifjlj dk fodkl3.270.013.24100%
Aligarh – Shifting of goods shed to coal dump siding along with 2nd block rake siding & development of parcel complex.
20vkxlksM & eky[ksjh & ckbZ ikl ykbu ¼9 fdeh-½13.800.0512.9100%
Agasod-Malkhedi Bye Pass line (9 km)
21bykgkckn eaMy & vfrfjDr ywi ¼5 LVs'ku½21.610.00122.3495%
ALD Divn - Additional loops (5 stations)
22,Srekniqj & ferkoyh & VqaMyk dks ckbZ ikl djrs gq, fyad ykbu16.950.7412.623100%
Etmadpur-Mitawali: Link line bypassing Tundla. (5.7Km)
23xksfoUniqjh & vfrfjDr ywi13.240.3214.2786%
Govindpuri- Provision of additional loops
24fctkSyh] HkkaMbZ o ekrkVhyk & vfrfjDr ywi ykbu10.240.337.1788%
Bijauli, Bhandai & Matatila – Additional loop lines
25>kalh & x<eÅ] mjbZ&vVk] vVk&dkYih o iks[kj;ku&ykyiqj&yEcs Cykd [k.M dks foHkkftr djuk23.831.8412.7774%
Jhansi-Garhmau (Mustara - 14 Km), Orai-Ata (Sarsoki - 15.5 Km), Ata-Kalpi (Usargaon - 18 Km), Pokhrayan-Lalpur (Malasa - 15 Km)-Splitting of longer block section.
26erkS/k o dcjbZ & mUu;u] 'kkVZ ywi dk foLrkj] 2ljk ywi o vUrjikZ'ku dks ekud & AAA rd Åapk djuk11.931.066.4784%
Mataundh & Kabrai – Up-gradation,extension of short loop, 2nd loop and raising of interlockingstandard to standard III
27>kalh & chuk&lh&Js.kh LVs'kuks dk vi o Mkmu ywi lfgr ch Js.kh esa ifjorZu vkSj vkikrdkyhu dzkl vksoj16.030.0315.0189%
Jhansi-Bina –Conversion of ‘C’ class stations to ‘B’ class stations with UP & DN loops and emergency cross-over at Burhpura and Mohasa.
28vkxjk Nkouh & ;kMZ ds <kaps esa ifjorZu7.20.482.8140%
Agra Cantt.- Remodeling of Yard & RRI
29vkxjk Nkouh & f'kjksijh lajs[k.k lfgr c;kuk o ckUnhdqbZ dks tksMuk6.460.333.660%
Agra Cantt. – Connectivity with Bayana & Bandikui with OHE.
30fMaxobZ o f'kojkeiqj & ,d&lkr vkxeu lqfo/kkvksa lfgr 2ljh ywi ykbu3.670.463.7276%
Dingwai & Shivrampur -2nd loop with simultaneous reception facilities.
31jk;: & u;k eky ifjlj8.410.641.7275%
Rairu – New goods complex
32cnkSlk] fp=dwV /kke [kksg & 2ljh ywi ykbusa9.130.920.325%
Badausa, Chitrakut Dham & Khoh – 2nd loop lines
33;equk iqy & ykbu la[;k 1 o 2 ls lh/ksa vkxeu o izLFkku lqfo/kkvksa ds fy, ;kMZ ds <kps esa ifjorZu12.760.462.9726%
Yamuna Bridge – Yard remodeling for direct reception & dispatch facilities from line No. 1 & 2
34nfr;k&djkjh >kalh o t[kykSu&/kkSjk &e/;orhZ Cykd gV dk ifjorZu dj ch& Js.kh LVs'ku ¼3 vnn½26.191.843.0315%
Datia-Karari (Ambabai), Karari-Jhansi (Samardha) & Jakhlaun – Dhaura (Chandpur) – B-class stations by conversion of intermediate block huts (3 nos.)
35gsreiqj & eksjsuk & e/;orhZ CykdgV dk ifjorZu dj ch & Js.kh LVs'ku ¼1½ vnn13.141.683.8992%
Hetampur-Morena – B-class station by conversion of intermediate block hut (1No.) (Sikroda)
36ikek & Hkhelsu & u;k ch & Js.kh LVs'ku6.650.920.055-
Paman – Bhimsen (Binaur) – New B-class station
37eFkqjk ta- & vyoj & [k.M dk mUu;u99.51715.5527%
Mathura Jn. – Alwar – Up-gradation of section
38fcjyk uxj & vi ywi ykbu8.11.521.4148%
Birlanagar – Up loop line
39gkFkjl & ykbuksa o IysV QkeksZ dh yEckbZ ds foLrkj gsrq ;kMZ ds <kaps esa ifjorZu11.151.062.155%
Hathras – Remodeling of yard for extension of lines & platform length
40>kalh & lqj{kk ;kMZ dh laogu {kerk esa o`f}8.7120.25--
Jhansi-Enhancement handling capacity of defense yard.
41vyhx< ta- & ,d Mkmu ywi vkSj ,d IysV QkeZ ds izko/kku lfgr LVs'ku dk lq/kkj22.640.07--
Aligarh Jn – Improvement of station with provision of one down loop & one platform
42ÅpMhg & ubZ LVs'ku bekjr lfgr dkeu ywi ds cnysa fn'kkRed ywi9.760.09--
Unchdih – Directional loop in place of common loop with new station building
43vkxjk QksVZ & ;k=h xkfM;ksa ds vkjEHk o lekiu gsrq eh- ykbu ;kMZ esa nks vfrfjDr IysV QkeZ ykbusa7.410.07--
Agra Fort – Two addl. platform lines in metre gauge yard for originating & terminating passengers trains
44ywi ykbu dk foLrkj ¼4 LVs'ku½ igjk] djfcXkoka] fQjkstkckn vkSj ekjhir1.440.271.1197%
Extension of loops (4 stations) at Pahara, Karbigwan, Firozabad and Maripat.
45dkuiqj & lh-ih-lh- eky lkbZfMax dk fo?kqrhdj.k1.900.032.29100%
Kanpur- Electrification of Goods CPC siding
46Qrsgiqj vkSj foU?;kpy% ,d fn'kkRed ywi ykbuksa dk dkeu ywi esa ifjorZu1.310.100.91-
Fatehpur & Vindhayachal: Conversion of unidirectional loops into common loops
Total -410.32222.571169.628 
lMd laj{kk dk;Z & Åijh@fupys lMd iqy
Plan Head - 30 (ROB/RUB)
CONSTRUCTION - STATUS OF ROAD SAFETY WORKS – ROAD OVER/ROAD UNDER BRIDGES WORK
47gkFkjl & leikj la- 95 &, ds cnysa Åijh lMd iqy3.19 (Bridge)0.13.19100%
Hathras- Road Over Bridge in lieu of level crossing No. 95-A on S.H. 33 (Pilibheet-Bharatpur Road).4.86 (App.)
48estk jksM & leikj la- 25 &ch ds cnysa Åijh lMd iqy3.63 (Bridge)0.013.70100%
Meja Road - Road over bridge in lieu of Level Crossing No.25-B at Km 788/11-13 on S.H. 44.4.17 (App.)
49dkuiqj & th-Vh- jksM ij leikj la- 79 Mh &ch ds cnysa Åijh lMd iqy7.91 (Rly.)0.203.56345% (Rly.)
Kanpur - Road over bridge in lieu of level crossing No.79-D at Km 1016/5-11 (NH-91).22.59 (State)Nil (App.)
50bjknrxat & jksM ij leikj la- 430 & , ds cnysa Åijh lMd iqy7.34 (Bridge)0.208.02100% (Rly.)
Iradatganj- Road over bridge in lieu of level crossing No. 430-A at Km 1341/4-5 on NH-276.76 (App.)70% (App.)
51xkft;kckn & VqUMykvyhx< ds lehi leikj la- 112@lh- & 3 ds cnysa Åijh lMd iqy4.28 (Rly.)0.013.95100%
Ghaziabad – Tundla - Road over bridge in lieu of level crossing No.112/C-3 near Aligarh at Km. 1329/19-213.98 (State)
52dkuiqj & VkVehy pkSjkgs ij Åijh lMd iqy dks pkSMk djuk3.96 (Bridge)0.292.36100%
KANPUR – Widening of Road Over Bridge No. 253 at Km 1017/31-35 near Tat Mill Chauraha.8.93 (App.)
53bVkok & leikj la- 27 ds cnysa Åijh lMd iqy5.3 (Rly.)0.743.96100%
Etawah-ROB in lieu of L-xing No.27 ‘Spl.’at Km 1155/27-296.96 (State)
54bykgkckn & dkuiqj & Qrsgiqj ds fudV leikj la- 48 ds cnysa Åijh lMd iqy6.84 (Rly.)3.111.8852% (Rly.)
Allahabad-Kanpur, Road Over Bridge in lieu of level crossing No. 48 near Fatehpur at Km. 941/25-2710.63 (State)38% (State)
55bykgkckn & dkuiqj & dkuiqj ds fudV leikj la- 81&Mh ds cnysa Åijh lMd iqy4.49 (Rly.)2.001.6537% (Rly.)
Allahabad-Kanpur, Road Over Bridge in lieu of level crossing No. 81-D near Kanpur.7.26 (State)28% (State)
56eFkqjk & iyoy leikj la- 532 ds cnysa Åijh lMd iqy6.07 (Rly.)4.002.9045% (Rly.)
ROB on Mathura-Palwal section at Km 1407/8-10 in lieu ofL-Xing No.532 near Vrindawan Station.8.00 (Sate)78% (App.)
57pqukj & eqxyljka; & leikj la- 119&ch ds cnysa Åijh lMd iqy15.29 (Rly.)5.104.3958% (Rly.)
Chunar – Mughalsarai – Road over bridge in lieu of level crossing gate No 119-B17.91 (State)Nil (State)
58bykgkckn & dkuiqj & leikj la- 62&, ds cnysa Åijh lMd iqy9.79 (Rly.)2.809.2486% (Rly.)
Allahabad – Kanpur – Road over bridge in lieu of level crossing No 62-A (near Bindki Road)12.75 (State)25% (State)
59VqUMyk ;kMZ & leikj la- 72 ds cnysa Åijh lMd iqy14.41 (Rly.)4.000.9210%
Tundla Yard – Road over bridge in lieu of level crossing No. 72
60vkxjk & >kalh & leikj la- 463 ds cnysa Åijh lMd iqy4.84 (Rly.)2.301.0964% (Rly.)
Agra – Jhansi – Road over bridge in lieu of level crossing No. 4638.32 (State)90% (State)
61;keuxj & leikj la- 77 ds cnysa Åijh lMd iqy5.87 (Rly.)2.000.99520% (Rly.)
Shyamnagar – Road over bridge in lieu of level crossing No. 777.33 (State)59% (State)
62eatwjx<h & gjnqvkxat leikj la- 77 ds cnysa Åijh lMd iqy7.05 (Rly.)3.70--
Manzurgarhi-Harduaganj - Road over bridge in lieu of level crossing No. 86-B9.13 (State)
63fetkZiqj & foU/;kpy leikj la- 7 ds cnysa Åijh lMd iqy8.22 (Rly.)3.00--
Mirzapur-Vindhyachal - Road over bridge in lieu of level crossing No. 715.70 (State)
64f'kdksgkckn & cVds'oj jksM leikj la- 51fo'ks"k ds cnysa Åijh lMd iqy10.80 (Rly.)2.000.35-
Shikohabad-Batkeshwar - Road over bridge in lieu of level crossing No. 5118.50 (State)
65Qrsgiqj & fcUndh jksM leikj la- 55&, ds cnysa Åijh lMd iqy7.17 (Rly.)3.20--
Fatehpur-Bindki Road - Road over bridge in lieu of level crossing No. 55-A10.00 (State)
66eFkqjk flVh & leikj la- 528 ds cnysa Åijh lMd iqy5.54 (Rly.)5.00--
Mathura City - Road over bridge in lieu of level crossing No. 5288.56 (State)
67fldUnjk & leikj la- 503 ds cnysa Åijh lMd iqy7.54 (Rly.)5.00--
Sikandra - Road over bridge in lieu of level crossing No. 5038.58 (State)
68gkFkjl flVh & tylj flVh leikj la- 503 ds cnysa Åijh lMd iqy7.57 (Rly.)2.00--
Hathras City-Jaleser City - Road over bridge in lieu of level crossing No. 90-C10.30 (State)
69lkLkuh & fot;x< leikj la- 99 & Ckh ds cnysa Åijh lMd iqy7.47 (Rly.)1.00--
Sasni-Vijaygarh Road over bridge in lieu of level crossing No. 99-B10.20 (State)
70vyhx< ta- & cjsyh ta- & leikj la- 83&lh ds cnysa Åijh lMd iqy7.47 (Rly.)2.00--
Aligarh Jn.-Bareli Jn. - Road over bridge in lieu of level crossing No. 83-C10.20 (State)
71Xokfy;j & vkxjk Nkouh & leikj la- 477&, ds cnysa Åijh lMd iqy6.13 (Rly.)1.00--
Gwalior-Agra Cantt. Road over bridge in lieu of level crossing No. 477-A8.39 (State)
72guqeku pkSdh & unkSuh & leikj la- 102&lh ds cnysa Åijh lMd iqy7.47 (Rly.)4.00--
Hanuman Chowki-Nadoni - Road over bridge in lieu of level crossing No. 102-C10.23 (State)
73>kalh & dkuiqj & leikj la- 147 ds cnysa Åijh lMd iqy3.424 (Rly.)3.00--
Jhansi-Kanpur - Road over bridge in lieu of level crossing No. 14719.488 (State)
74>kalh & vkxjk & leikj la- 492&lh ds cnysa Åijh lMd iqy6.12 (Rly.)1.00--
Jhansi-Agra - Road over bridge in lieu of level crossing No.492-C8.39 (State)
75oSj & nudkSj & leikj la- 139&ch ds cnysa Åijh lMd iqy9.19 (Rly.)1.50-0% (Rly.)
Wair-Dankaur - Road over bridge in lieu of level crossing No. 139-B11.58 (State)45% (State)
76eatwjx<h & gjnqvkxat & leikj la- 84 ds cnysa Åijh lMd iqy7.17 (Rly.)2.00--
Manzurgarhi-Harduaganj - Road over bridge in lieu of level crossing No. 849.25 (State)
77eatwjx<h & gjnqvkxat & leikj la- 85&ch ds cnysa Åijh lMd iqy6.91 (Rly.)2.00--
Manzurgarhi-Harduaganj - Road over bridge in lieu of level crossing No. 85-B9.00 (State)
78nknkuxj & leikj la- 240&, ds cnysa Åijh lMd iqy7.31(Rly ) 8.72(State)2.00--
Dadanagar - Road over bridge in lieu of level crossing No. 240-A
79[kijkeksgky & leikj la- 83&Mh ds cnysa Åijh lMd iqy11.70(Rly ) 13.80(State)1.00--
Khapra Mohal - Road over bridge in lieu of level crossing No. 83-D
80QQawn & leikj la- 8&ch ds cnysa Åijh lMd iqy9.29 (Rly ) 12.10 (State)1.00--
Phaphund - Road over bridge in lieu of level crossing No. 8-B
81fetkZiqj & leikj la- 6&, ds cnysa Åijh lMd iqy9.92 (Rly ) 13.70 (State)1.00--
Mirzapur - Road over bridge in lieu of level crossing No. 6-A
82uSuh & leikj la- 35&ch ds cnysa Åijh lMd iqy9.40 (Rly ) 12.70 (State)1.00--
Naini - Road over bridge in lieu of level crossing No. 35-B
83vkxjk & >kalh & leikj la- 472 & lh ds cnysa Åijh lMd iqy6.43 (Rly ) 8.76 (State)0.50--
Agra-Jhansi - Road over bridge in lieu of level crossing No.472-C
84eFkqjk & iyoy & leikj la- 553 ds cnysa Åijh lMd iqy13.02 (Rly ) 20.85 (State)0.50--
Mathura-Palwal – Road over bridge in lieu of level crossing no. 553
85ckank & leikj la- 454 & , ds cnysa Åijh lMd iqy7.85 (Rly ) 23.21 (State)0.50--
Banda-Road over bridge in lieu of level crossing No. 454-A
86vkxjk & xq: dk rky ds fudV leikj la- 502 ds cnysa Åijh lMd iqy13.98 (Bridge ) 17.48 (App.)0.50-10% (Rly.)
Agra-Road over bridge in lieu of level crossing no. 502 near Guru ka Tal41% (State)
87jksgrk & :udVk jksM leikj la- 491 & lh ds cnysa Åijh lMd iqy31.070.50-0% (Rly.)
Rohta-Runkata Road – Road over bridge in lieu of level crossing no. 491-C53% (State)
88vyhx< & esgjkoy leikj la- 111 & , ds cnysa Åijh lMd iqy8.96 (Rly ) 13.15 (State)0.13--
Aligarh-Mehrawal- Road over bridge in lieu of level crossing No. 111-A
89[kqtkZ & fldUnjiqj & leikj la- 129 & ch ds cnysa Åijh lMd iqy8.04 (Rly ) 12.18 (State)0.13--
Khurja-Sikandarpur - Road over bridge in lieu of level crossing No. 129-B
90ftxuk & eUMk jksM & leikj la- 15 & lh ds cnysa Åijh lMd iqy7.67 (Rly ) 14.69 (State)0.13--
Jigna-Mandah Road - Road over bridge in lieu of level crossing No. 15-C
91oSj & nudkSj & leikj la- 136 & ch ds cnysa Åijh lMd iqy8.04 (Rly ) 12.03 (State)0.13--
Wair-Dankaur - Road over bridge in lieu of level crossing No. 136-B
92fldUnjiqj & pksyk & leikj la- 131 & ch ds cnysa Åijh lMd iqy8.04 (Rly ) 11.98 (State)0.13--
Sikandarpur-Chola - Road over bridge in lieu of level crossing No. 131-B
93dqYok & lkseuk & leikj la- 120 & ch ds cnysa Åijh lMd iqy8.61 (Rly ) 13.30 (State)0.13--
Kulwa-Somna - Road over bridge in lieu of level crossing No. 120-B
94dqYok & lkseuk & leikj la- 119 & ch ds cnysa Åijh lMd iqy8.61 (Rly ) 13.30 (State)0.13--
Kulwa-Somna - Road over bridge in lieu of level crossing No. 119-B
95fldksgkckn & eD[kuiqj & leikj la- 56 ds cnysa Åijh lMd iqy7.23 (Rly ) 15.95 (State)0.13--
Shikohabad-Makhanpur - Road over bridge in lieu of level crossing No. 56
96:udrk & dhFke & leikj la- 509 ds cnysa Åijh lMd iqy5.54 (Rly ) 8.58 (State)0.10--
Runkata- Kitham - Road over bridge in lieu of level crossing No. 509
97lkLkuh & eUnjd & leikj la- 100&lh ds cnysa Åijh lMd iqy7.22 (Rly ) 15.83 (State)0.13--
Sasni-Mandrak - Road over bridge in lieu of level crossing No. 100-C
98gkFkjl & lkLkuh & leikj la- 96&lh ds cnysa Åijh lMd iqy7.44 (Rly ) 10.98 (State)0.13--
Hathras-Sasni - Road over bridge in lieu of level crossing No. 96-C
99ferkoyh & cjgu & leikj la- 78&lh ds cnysa Åijh lMd iqy7.81 (Rly ) 11.77 (State)0.13--
Mitawali-Barhan - Road over bridge in lieu of level crossing No. 78-C
100cjgu & pejkSyk & leikj la- 81&lh ds cnysa Åijh lMd iqy7.23 (Rly ) 15.95 (State)0.13--
Barhan-Chamraula- Road over bridge in lieu of level crossing No. 81-C
101dqYok & lkseuk & leikj la- 115 & lh ds cnysa Åijh lMd iqy6.72 (Rly ) 10.41 (State)0.13--
Kulwa-Somna - Road over bridge in lieu of level crossing No. 115-C
102gkFkjl flVh & ykMiqj & leikj la- 94 & lh ds cnysa Åijh lMd iqy7.22 (Rly ) 10.63 (State)0.13--
Hathras City-Ladpur Road - Road over bridge in lieu of level crossing No. 94-C
103HkUMbZ & vkxjk & leikj la- 490 & lh ds cnysa Åijh lMd iqy6.16 (Rly ) 8.48 (State)0.10--
Bhandai-Agra Cantt. - Road over bridge in lieu of level crossing No. 490-C
Total -683.95878.56552.158 
iqy laca/kh dk;Z
Plan Head - 32 (Bridge Work)
CONSTRUCTION - STATUS OF BRIDGES WORK
104vksUx & djfcxok & LFkkbZ ekxZ ifjorZu ij iqy la- 207 dk iquZfuekZ.k6.680.016.23100%
Aung-Karbigwan: Rebuilding of bridge No. 207 at Km 983.672 on permanent diversion (UP main line)
Total -000 
dkj[kkus & mRiknu bdkbZ;ksa lfgr
Plan Head - 42 (Work Shop & Production Units)
CONSTRUCTION - STATUS OF WORK SHOP & PRODUCTION UNITS WORK
105flFkkSyh ¼jsy fLizax dkj[kkuk½ & fQ,V vkSj vkbZ-vkj- & 20 cksxh fLizax ds fuekZz.k gsrq vfrfjDr vk/kkjHkwr lqfo/kk,3.833.894.9898%
Sithouli Rail Spring Karkhana- Additional infrastructure facilities for manufacturing FIAT & IR 20 Bogies spring
106dkuiqj & jsy batu ;kMZ esa u;k lokjh fMCck ifjlj12.790.209.6695%
Kanpur-New coaching complex in loco yard
107ckn & Vadh eky fMCck :X.k ykbu dk mUu;u3.460.502.0795%
BAAD- Up-gradation oftank wagon sick line
108dkuiqj & eky foU;kl ;kMZ esa volajpuk o vksoj gkfyax lqfo/kkvksa lfgr useh vksoj gkfyax lqfo/kkvksa dk mUu;u6.940.015.6683%
Kanpur- up-gradation of routine overhauling facilities at goods marshalling yard
109>kalh & vfrfjDr /kqykbZ dh xrZ ykbu vkSj lokjh fMCck :X.k ykbu lqfo/kk,5.180.301.8326%
Jhansi – Addl. Washing pit line & coaching sick line facilities.
110vkxjk QksVZ & VfeZuy lqfo/kk,2.790.162.1196%
Agra-Fort-Terminal facilities
111mRrj e/; jsyos & ubZ dsUnzh; jlk;u o /kkrq deZ iz;ksx'kkyk2.7580.600.0911%
North Central Railway-New Central chemical & metallurgical lab (in Jhansi Workshop)
112vkxjk Nkouh & jsyxkMh ds j[k j[kko laca/kh lqfo/kk,3.221.000.215%
Agra Cantt. – Maintenance & train preparation facilities.
113dkuiqj & fo/kqr jsy batu 'ksM dh {kerk dk 120 ls 150 batu rd lao/kZu6.580.502.3338%
Kanpur – Augmentation of capacity of electric loco shed from 120 to 150 locos
114>kalh & fo/kqr jsy batu 'ksM dh {kerk dk 120 ls 150 batu rd lao/kZu8.370.500.862%
Jhansi – Augmentation of capacity of electric loco shed from 120 to 150 locos.
115vkxjk Nkouh & lokjh fMCck fMiksa ij lokjh fMCck :X.k ykbu lqfo/kk,a3.970.500.125%
Agra Cantt. – Coaching sick line facilities at coaching depot
116dkuiqj jsy batu 'ksM {ks= esa lokjh fMCck vuqja{k.k lqfo/kk, ¼pj.k&AA½8.970.25--
Kanpur-Coaching maintenance facilities in loco shed area (Phase-II)
117>kalh ¼fo/kqr jsy batu 'ksM½ fo/kqr jsy batu dh laogu {kerk esa 175 rd o`f} gsrq laoZ/ku ¼pj.k&AA½8.590.57--
Jhansi (Electric Loco Shed)- Augmentation for enhancing homing capacity of electric locos upto 175 (Phase-II)
118dkuiqj lsaVªy & jsy batu 'ksM {ks= esa vuja{k.k lqfo/kk,a ¼pj.k&AA½5.000.05--
Kanpur Central – Coaching maintenance facilities in loco shed area (Phase-II)
119ckn & Vadh eky fMCck fMiksa esa jsyxkMh ds ,d Nksj ls nwljs Nksj rd izhfe;e ifj{k.k gsrq lqfo/kkvksa dk mUu;u3.600.05--
Baad – Upgradation of facilities for premium end to end train examination at tank wagon depot
120dkuiqj & laogu {kerk dk 150 ls 175 fo/kqr jsy batu rd laoZ/ku9.650.05--
Kanpur – Augmentation of holding capacity from 150 to 175 electric locos
121bykgkckn & eaMy & vfrfjDr 26 lokjh fMCck jsyxkMh dh /kqykbZ gsrq xrZ ykbu600 eh- dk fuekZ.k1.580.0012.14100%
ALD DIVN-Additional washing line of 600 m to accommodate berth 26 coach train
122>kalh & Mhty jsy batu 'ksM dk foLrkj1.510.061.14100%
Extension of Diesel Shed - Jhansi
123>kalh dkj[kkus esa & 20 Vu dzsu gsrq xzsUVªh ¼cs la-2½ ¼'ksM ,½ dk fuekZ.k1.780.950.095%
Jhansi Workshop-20 ton crane with gantry (bay no. 2) (shed A)
Total -97.2789.13132.06 
deZpkfj;ksa ds fy, DokVj
Plan Head - 51 (Staff Quarters)
CONSTRUCTION - STATUS OF STAFF QUARTERS WORK
124dkuiqj & vkoklksa dk cnyko] 76 bdkb;ka3.010.152.8298%
Kanpur - Replacement of 76 units staff quarters
125bykgkckn & vkoklksa dk cnyko] 140 bdkb;ka5.890.256.6766 Unit - 100%
Allahabad-Replacement of quarters-140 units74 Unit - 82%
126dkuiqj & vkoklksa dk cnyko] Vkbi 102bdkb;ka ¼fofHkUu dkyksfu;ka½3.680.104.6495%
Kanpur-Replacement of quarters, different types (102 units) in various colonies.
127dkuiqj & vkoklksa dk cnyko] 205bdkb;ka ¼fofHkUu Vkbi o dkyksfu;ka½11.350.705.4360%
Kanpur – Repl. of quarters – 205 units (various types) in various colonies
128bykgkckn & Vkbi & V ¼,d eaftyk½ & 24 bdkb;ka vkSj Vkbi & V ¼fo'ks"k½ & 6 bdkb;ka8.850.207.3382%
Allahabad – Type-V (single storey) – 24 units & type-V (special) – 6 units.
129eFkqjk & vkoklksa dk cnyko] VkbZi & A & 100 vkSj VkbZi & AA 20 bdkb;ka7.500.500.055%
Mathura – Repl. of quarters, type I – 100 & type II – 20 units
130bykgkckn & vkoklksa dk cnyko] VkbZi &A & 61] VkbZi & AA & 50 vkSj VkbZi & AAA & 10 bdkb;ka8.250.50--
Allahabad – Repl. of quarter, type I – 61, type II – 50 & type III – 10 units
131dkuiqj & vkoklksa dk cnyko] VkbZi & AA & 100 vkSj VkbZi & AAA & 10 bdkb;ka5.680.08--
Kanpur-Repl. of quarters, type-II-100 & type-III-10 units
132>kalh & ds VkbZi vkoklksa dk cnyko] VkbZi & AA & 120 bdkb;ka ¼if'pe dkyksuh½9.980.50--
Jhansi –Repl. of K-Type quarters type-II – 120 units (west colony)
133lqcsnkjxat & vkoklksa dk cnyko] Vkbi & V & 20 bdkb;ka5.800.10--
Subedarganj – quarters, type-V – 20 units
134vyhx< & vkoklksa dk cnyko] VkbZi & A & 38 o VkbZi & AA & 31 bdkb;ka2.48-2.1995%
Aligarh - Replacement of 69 units staff quarters.(38 units type-I, 31 units type –II)
Total -64.192.9826.94 
deZpkfj;ksa ds fy, lqfo/kk,a
Plan Head - 52 (Staff Amenities)
CONSTRUCTION - STATUS OF STAFF AMENITIES WORK
135lqcsnkjxat & [ksy dwn LVsfM;e3.160.023.12100%
Subedarganj – Sports stadium
136vkxjk & LVsfM;e rj.k & rky5.470.083.4880%
Agra – Stadium & swimming pool
137bykgkckn & dsUnzh; fpfdRlky; dh ubZ bekjr esa nwljk ry3.090.10--
Allahabad – 2nd floor on new building at Central Hospital
138[ktqjkgks & ¼gkayh Ms gkse½ dk izko/kku0.290.170.1175%
Khajuraho: Provision of Holiday Home.
Total -8.630.16.6 
;k=h lqfo/kk,a
Plan Head - 53 (Passenger Amenities)
CONSTRUCTION - STATUS OF PASSENGER AMENITIES WORK
139bykgkckn & ;k=h IysVQkeksZ dk foLrkj ¼2 LVs'ku½ ¼:jk] QkQwan½4.541.003.0268%
Allahabad – Extension of platforms (2 Stns.) (Rura, Phaphund)
140bykgkckn & ta- & flfoy ykbu dh rjQ IysVQkeZ la- 11 dk fuekZ.k4.751.5--
Allahabad Jn. Platform no. 11 towards Civil lines side
141iudh & ;k=h IysV QkeZ dk foLrkj2.30---
Extension of passenger platforms at Panki
Total -4.5413.02 
vU; fofufnZ"V dk;Z
Plan Head - 64 (Other Specified)
CONSTRUCTION - STATUS OF OTHER SPECIFIED WORK
142vkxjk & u;k eaMy16.590.0417.97100%
Agra – Formation of New Division
143bykgkckn & mRrj e/; jsyos dh Lfkkiuk82.490.1094.10Orig. - 100%
Allahabad – Setting up of North Central Railway.MM - 60%
144bykgkckn eaMy & pkykdksa o xkMksZ ds fy, la;qDr jfuax :e6.900.016.93100%
Allahabad Division – Combined running room for Drivers and Guards.
145vkxjk & u;k eaMy jsyos fpfdRlky; ¼60 fcLrj½4.180.41.9596%
Agra- New Divisional hospital (60 bedded)
146lqcsnkjxat & jsyos lqj{kk cy ykbUl dk fuekZ.k17.291.009.8375%
Subedarganj- Construction of RPF lines
147bykgkckn & eaMy jsyosa fpfdRlky; dk mUu;u5.490.107.10100%
Up-gradation of Divisional hospital at Allahabad
148>kalh & ubZ jsyos isM 970 jsyos bathfu;j jsthesaV dk xBu ¼izknsf'kd lsuk½6.720.055.7480%
Jhansi – Raising of new Railway paid 970 Railway Engineer Regiment (Territorial Army)
149bykgkckn & Hkkjrh; jsyos jsy iFk e'khu izf'k{k.k dsUnz dk foLrkj7.990.404.8799%
Allahabad – Expansion of Indian Railways Track Machine Training Centre
150bykgkckn & ;krk;kr ys[kk dk;kZy; ds fy, ubZ bekjr5.350.306.2465%
Construction of New Building for Traffic Accounts at SFG/ALD
151dkuiqj & fo/kqr izf'k{k.k dsUnz esa izf'k{k.k lqfo/kkvksa dk lao/kZu o lq/kkj5.930.301.765%
Kanpur – Augmentation & improvement of training facilities of Electric Training Centre (Electrical work)
152VqaMyk & pkyd o xkMZ ds jfuax d{k dk foLrkj2.05-1.390%
Tundla Junction & Kanpur – Expansion of Drivers Running room.
153ubZ fnYyh & Vh-Vh-bZ- jsLV gkÅl ij nks vfrfjDr eaftyksa dk fuekZ.k1.51-1.59100%
Construction of two additional stories on existing TTE rest house at New Delhi Railway station
154bykgkckn & jsy HkrhZ ifjlj ds fy, vyx Hkou dk fuekZ.k0.99-1.75100%
Allahabad: Independent building for Railway Recruitment Board.
155dkuiqj & lkeU; Hk.Mkj fMika dk izko/kku2.13-1.14100%
Kanpur – Provision of General Store Depot.
Total -162.492.7159.38 
fMiksftV dk;Z
(Deposit Works)
CONSTRUCTION - STATUS OF DEPOSIT WORK
156nknjh & dUVsuj dkjiksjs'ku ds fy, vkbZ-lh-Mh- lkbfMax dk fuekZ.k16.411.3415.15Overall 73%
DADRI- Const of ICD Siding for CONCOR (Deposit work).Civil 95 %
157vkxjk & eFkqjk [k.M & lEkikj la- 505 ds cnysa Åijh lMd iqy dk fuekZ.k4.68Deposit Work1.64100%
Construction of ROB in lieu of level x-ing no. 505 Km. 1355/21-23 in Agra-Mathura section.
 vkxjk & dksVk [k.M & ¼fdeh- 79@13&15½ ij fLFkr vtqZu uxj xsV ij fupys LkMd iqy dk fuekZ.k10.88Deposit Work--
158Construction of RUB at Arjun Nagar Gate in Agra at Km. 79/13-15 on Agra-Kota Section.
159>kalh & vkxjk [k.M & eqjsuk LVs'ku ij v/kksxkeh ekxZ dk fuekZ.k4.72Deposit Work--
Construction of sub-way at Morena on JHS-AGC section.
160nknjh & :iokl xkao ds lehi fdeh- 1417@4 ij Åijh lMd iqy dk fuekZ.k11.96Deposit Work3.1125% (Rly.)
Construction of Dadri ROB near village Roopvas at Km 1417/430% (App.)
161eFkqjk & o`Unkou [k.M ¼fdeh-9@8½ ij Åijh lMd iqy dk fuekZ.k7.38Deposit Work1.0620% (Rly.)
ROB at Km 9/8 Mathura-Birandavan section71% (State)
Total -36.691.3416.79 
losZ{k.k dk;Z
(Survey Work)
CONSTRUCTION - STATUS OF SURVEY WORK
162eFkqjk & ;kMZ fuekZ.k gsrq fjdkfulsUl bath- ,oa VªSfQd los{k.k0.020.02-Completed.
Reconnaissance Engg. –cum- Traffic Survey for construction of Mathura Yard.
163vyhx< & Nkrk cjkLrk 'ksjx<] ukS>hy] ctuk vkSj [kSj ¼79 fdeh-½ ubZ ykbu ds fuekZ.k gsrq fjdkfulsUl bath- ,oa VªSfQd los{k.k0.03-0.01Fresh reports are under preparation for both the projects separately.
Reconnaissance Engineering –cum- TrafficSurvey forConstruction of new BG line between Aligarh andChata Via Shergarh ,Naujhil, Bajna and Khair (79 Km)
164[kqtkZ & jk;k cjkLrk ekV] lqjhj] ctuk ¼85 fdeh- ½ ubZ ykbu ds fuekZ.k gsrq fjdkfulsUl bath- ,oa VªSfQd los{k.k0.06-0.03Fresh reports are under preparation for both the projects separately.
Reconnaissance Engineering –cum- Traffic Survey for new line between Khurja-Raya new line via Mat, Surir, Bajna (85 Km)
165iudh eqxyljka; [k.M ij 3ljh ykbu gsrq izhfyfe;jh bathfu;fjax ,oa VªSfQd losZ{k.k0.48-0.16Completed.
Preliminary Engineering –cum- traffic survey for 3rd line between Panki-Mughalsarai.
166>kalh chuk [k.M ij 3ljh ykbu gsrq fjdkfulsUl bath- ,oa VªSfQd los{k.k0.1-0.1Survey completed, survey report sent to FA&CAO/Con. on 17.03.2010 for finance vetting.
Reconnaissance Engineering –cum- traffic survey for 3rd line between Jhansi & Bina.
167fjokjh & iyoy & [kqtkZ0.17--Engg. & Traffic Survey in progress.
Rewari-Palwal-Khurja
168Hkqrs'oj & ¶ykbZ vksoj ds fuekZ.k gsrq losZ{k.k0.02--Survey completed and report sent to Railway Board on 29.01.10.
Flyover at Bhuteswar
169dklxat & [kqtkZ & cjkLrk vrjkSyh cMh ykbu ds fuekZ.k gsrq fjdkfulsUl bath- ,oa VªSfQd los{k.k0.16--Engg. & Traffic survey completed
Reconnaissance Engg.-cum-Traffic Survey for construction of new Board gauge line from Kasganj to Khurja via Atrauli.
170eFkqjk,oa iyoy ds e/; 4Fkh ykbu ds fuekZ.k gsrq izhfyfe;jh bathfu;fjax ,oa VªSfQd losZ{k.k0.24--Detailed estimate for survey work under sanction.
PET survey for construction 4th line between Mathura and Palwal
171>kalh & dkuiqj ¼214 fdeh-½ nksgjh ykbu ds fuekZ.k gsrq izhfyfe;jh bathfu;fjax ,oa VªSfQd losZ{k.k0.64--Completed.
PET survey for doubling between Jhansi-Kanpur (214 Km)




Source : North Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 21-01-2011  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.