Indian Railway main logo Welcome to Indian Railways
Search :  
Increase Font size Normal Font Decrease Font size
View Content in Hindi
National Emblem of India

About Us

IR Personnel

News & Recruitment

Tenders & Notices

Vendor Information

Passenger Services

Contact Us



Goto Yahoo!!


 
Bookmark Mail this page Print this page
QUICK LINKS
Vendor Information

Division Department Description Bill Passed Date Bill Status Document
 Construction  Engineering  4th on A/cs Bill No.JHS/C/R/ORH/JHS/Cont.1/Bill/04 dated 18.05.2013 in favour of M/s Divya Dhara Traders & Consultant, 1111 Gondu Compound, Sipri Bazar, Jhansi in connection with the work of House Keeping of Officers Rest House (Construction) at Jhansi  22-05-2013  Bill has been sent to Accounts Office on 22.05.2013   Document
 Construction  Engineering  6th on Ac/s Bill No.JHS/C/R/LK/Cont.49/Bill/06 dated 17.05.2013 in favour of Chandeep Singh Dhanjal, House No.1246 Khati Baba, Jhansi in connection with the work of Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability for a period of one year for the use of Dy.CE/C/ Jhansi for various works of the unit.  22-05-2013  Bill has been sent to Accounts Office on 22.05.2013   Document
 Construction  Engineering  10th on a/cs Bill No.JHS/C/R/ROB/147-B/JHS-CNB/Cont.2/Bill/10 dated 16.05.2013 in favour of M/s Randhava Travels & Transport, 378, Gurudwara, Shri Guru Singh Saba, Nanak Ganj, Sipri Bazar, Jhansi in connection with the work of Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability for a period of one year for the use of XEN/C/ Jhansi for various works of the unit.  17-05-2013  Bill has been sent to Accounts Office on 17.05.2013   Document
 Allahabad Division  Electrical  Bill  17-05-2013     Document
 Construction  Electrical  -'A' Electrification of washing pit line 620 mtr long ,with Battery charging facilities and supply, erection , testing,& commissioning of 2x500kva 11/0.4kv package type sub station at Agra Cantt"B"Description of the work :- Electrification of open platform, ASM room, equipment room,battary charger room, etc at Mohasa & Burhpra stations of Jhansi division .  15-05-2013  Bill sent to account   Document
 Workshop  RSK Sithouli  AMC of Coiling Machine  14-05-2013  Bill sent to the accounts for payment on 09.05.13.   Document
 Jhansi Division  Mechanical  Name of work:- Hiring of one Non AC Multi Utility Vehicle for ART (Accident Relief Train), Jhansi.  14-05-2013     Document
 Jhansi Division  Mechanical  Name of work:- Mechanised Cleaning and washing of Diesel Locomotives at Diesel Loco Shed, Jhansi.  14-05-2013     Document
 Jhansi Division  Mechanical  Supply & Fitment of Front & Rear Water Expansion Tank of Diesel Locomotives  14-05-2013     Document
 Jhansi Division  Mechanical  Name of work:- Hiring of 01 truck (Capacity 9 Ton) for Transportation of Railway material from Jhansi to other Indian Railway units or vice versa (point to point basis) with sufficient labour at least 04 nos. for loading and unloading.  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Vipin Gupta MRA  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Vinod Kumar Dewedi  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of M/S VIKALP CONSTRUCTION.Co.  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Shri Umesh Kumar Agrawal  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of M/S Trading engg works  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of synthic product  14-05-2013     Document
 Jhansi Division  Engineering  civil engg contract of Siddeshwar Engg india pvt ltd  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of M/s Shiv Kumar kanpur  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Shri Sanjay Gupta  14-05-2013     Document
 Jhansi Division  Engineering  civil engg contract of RUSH CONST  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Shri R.C.Shukla  14-05-2013     Document
 Jhansi Division  Engineering  civil engg contract of Ravi Sharma  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Ram Ratan Singh  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of M/S Ram Khilawan  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Rajendra Agarwal associate  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Pushpak Cons. Co. (AAPPH 6227 F)  14-05-2013     Document
 Jhansi Division  Electrical  civil engg works of Pushpraj singh  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Pragati Construction  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of NPS jadon  14-05-2013     Document
 Jhansi Division  Engineering  civil engg contract of Noor Bux  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Nikhara Traders  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Narwani const  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Manoj Parashar gwl  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Laxmi const GWL  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Shri Laxmi Chand & co  14-05-2013     Document
 Jhansi Division  Engineering  civil engg contract ofkumar const  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Kirori Lal Singhal  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of M/S Jai Maa Vaishno  14-05-2013     Document
 Jhansi Division  Engineering  civil engg contract of Jai Durga const  14-05-2013     Document
 Jhansi Division  Engineering  civil engg contract of Hari Ram Sahu  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Godhan Singh Tyagi  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of M/S Geeta Cons. AAEEG 9547J  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of G.S.Construction.Kanpur(AAGF G 7910H)  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of M/S Dinesh & Co  14-05-2013     Document
 Jhansi Division  Engineering  civil engg contract of Deepesh Electrical  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of shri B.S.saini  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of M/S ANJUM ENTERPRIZES  14-05-2013     Document
 Jhansi Division  Engineering  civil engg works of Vishnu PD Sharma  14-05-2013     Document
 Construction  Engineering  6th(A) PVC Bill No. JHS/C/R/ROB/147/Cont.1/Bill/06(A) PVC dated 13.05.2013 in favour of M/s Bihari Lal Menghani, BK-I/150, 2nd Floor, Shalimar Bagh, Delhi-88 in connection with the work of Construction of ROB in lieu of level crossing No. 147 "B" at Kms 1179/6-7 in Jhansi-Kanpur section  13-05-2013  Bill has been sent to Accounts Office on 13.05.2013   Document
 Construction  Engineering  8th (A) PVC Bill No. JHS/C/R/ROB/454/Cont.1/ Bill/8(A) PVC dated 09.05.2013 in favour of M/s Rational Constructions, 10/14F, Baghambari Gaddi,B.D. Puram, Allahabad(UP)in connection with the work of Construction of ROB in lieu of level crossing No. 454 A Near Banda Station at Kms. 1318/7-8 in Jhansi-Banda section  13-05-2013  Bill has been sent to Accounts Office on 13.05.2013   Document
 Construction  Engineering  8th(A) PVC Bill No.JHS/C/R/ROB/454/Cont.1/ Bill/8(A) PVC dated 09.05.2013 in favour of M/s Rational Constructions, 10/14F, Baghambari Gaddi,B.D. Puram, Allahabad(UP)in connection with the work of Construction of ROB in lieu of level crossing No. 454 A Near Banda Station at Kms. 1318/7-8 in Jhansi-Banda section  13-05-2013  Bill has been sent to Accounts Office on 13.05.2013   Document
 Construction  Engineering  1st & Final bill No.JHS/C/R/Quotation/12-13/13 /Bill/01 & Final dated 01.04.2013 in favopur of Shri Md Harun Khan, Village & Post : Silgan, disstt-Lalitpur in connection with the work of Dressing of surface and removing of vegetation at various locaions from cess between Lalitipur-Tikamgarh section (Ch: 0.00 to 52.500) of New B. G. Rail line  13-05-2013  Bill has been sent to Accounts Office on 13.05.2013   Document
 Construction  Electrical  Supply, erection, testing and commissioning of 25 Kv 50 Hz AC OHE in connection with gauge conversion of Mathura Jn (MG yard) part of Kasganj-Mathura gauge conversionâ?  13-05-2013     Document
 Construction  Electrical   (A) Design, Supply , erection, testing & commissioning of 132/25 Kv Traction substation with 2400 KVAR shunt capacitor bank at Runkuta station of Agra division . (B) Design, supply, erection , testing &commissioning of 132 KV Double circuit AC Transmission line for Runkuta TSS of Agra division and (C) Design, supply,erection , testing & commissioning of 25kv Spat Farah, conversion of Billochpura SSP in SP and kitham SP in SSP of Agra Division.  13-05-2013  Bill passed   Document
 Allahabad Division  Engineering  bills of DEN/Track/ALD  10-05-2013  passed   Document
 Allahabad Division  Engineering  All bill of DEN/L/CNB  10-05-2013     Document
 Allahabad Division  Engineering  All bill of ADEN HQ TDL  10-05-2013     Document
 Jhansi Division  Engineering  civil engg works of M/S A.K.Const.  10-05-2013     Document
 Jhansi Division  Engineering  submitted civil engg works of A.K.Const.  10-05-2013     Document
 Allahabad Division  Electrical  Bill status ofTRD Allahabad between 27.08.2012 to 01.05.2013  09-05-2013  uploaded   Document
 Allahabad Division  Electrical  Bill status of SrDEE/TRD/ALD  09-05-2013  Bill paid to firms for TRD work   Document
 Allahabad Division  Engineering  bill pertains to DEN/Track/ALD  08-05-2013  passed   Document
 Construction  Engineering  18th & Final Bill No.JHS/C/R/LK/Cont.45/Bill/18 & final dated 01.05.2013 in favour of Shri Rajeev Singh Bundela, Nehru Nagar, Lalitpur in connection with the work of Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008 for daily 12 hours availability for a period of One year for the use of AXEN (C)-I, Lalitpur for various works of the unit.  08-05-2013  Bill has been sent to Accounts Office on 08.05.2013   Document
 Construction  Engineering  2nd on a/cs Bill No.JHS/C/R/TA Camp/Cont. 03/Bill/02 dated 03.05.2013 in favour of M/s Jai Durga Constructions, 373/7, Civil line, Jhansiin connection with work of Balance work of various Buildings etc. in connection with Raising of new Railway paid 970 Railway Engineers Regiment (TA) at Jhansi  08-05-2013  Bill has been sent to Accounts Office on 08.05.2013   Document
 Workshop  JHS Workshop  Hiring of one no. Non-AC Ambulance Make- Tata Winger /Tavera/ Swaraj Mazda in good working condition with Contractorâ??s own driver, fuel, maintenance, taxes etc at Wagon Repair Workshop, Jhansi for a period of one year  08-05-2013  forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  Hiring of two Nos langoor for three year for wagon repair workshop Jhansi  08-05-2013  forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  Disposal of garbage at different places of workshop premises including cleaning of urinals, Toilets blocks, Washbasins, bathrooms, tea booth and drinking points at Wagon Repair Workshop, Jhansi, Stores depot and Accounts department for a period of two years  07-05-2013  forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  Hammering of incoming 6600 No.s per year BOX-N/BOX-C other type of wagons for removing the scales/rust from inside sidewalls, end walls, floor of wagons thereafter, sweeping and disposal of garbage / dust/ debris/ dirt and labeling the same at specified locaiton withing 500 meters at pocket yard for a period of two years.  07-05-2013  forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  General Disinfection and Pest, Rodent Control services at Jhansi Workshop  07-05-2013  forwarded to WAO/JHS   Document
 Allahabad Division  Engineering  bill of m/s. ABC rail road product / LKO  07-05-2013     Document
 Construction  Engineering  10th on A/cs Bill No.JHS/C/R/LM/Cont. 39/Bill/10 dated 01.05.2013 in favour of M/s Jhawar Sales Corporation, Rani Bazar, Bikaner in connection with the work of P. Way work & other Misc. work including Transportation of P. way material in connection with linking of Track on MBC Sleeper Zone-IV between Ch: 33500 to 65100 including Tikamgarh Yard in Lalitpur-Mawai Section, a part of Lalitpur-Khajuraho-Satna & Rewa-Singrauli including Mahoba-Khajuraho New B.G. Rail Line.  06-05-2013  Bill has been sent to Accounts Office on 06.05.2013   Document
 Construction  Engineering  20th on A/cs Bill No.JHS/C/R/LK/Cont. 20/Bill/20 dated 23.04.2013 in favour ofM/s. Ganga Construction Co., A-181, Deendayal Nagar, Jhansi (U.P.)in connection with the work of Balance bridge work, Earthwork & left over works at different locations of Lalitpur-Mawai Section from Ch. 32675 m. to Ch. 65100 m., a part of Lalitpur-Khajuraho New B. G. Rail Line  06-05-2013  Bill has been sent to Accounts office on 06.05.2013   Document
 Construction  Engineering  1st on A/cs Bill No.JHS/C/R/ROB/182-B/Cont.1/01 dated 26.04.2013 in favour of M/s Bihari Lal Menghani, BK-I/150, 2nd Floor, Shalimar Bagh, Delhi-88 in connection with the work of Construction of ROB in lieu of level crossing No. 182 "B" near Orai station at Kms. 1240/8-9 in JHS-CNB section  06-05-2013  Bill has been sent to Accounts Office on 06.05.2013   Document
 Allahabad Division  Engineering  ALL Bills in the section of SR DEN/1/ALD (ADEN/CAR)  04-05-2013     Document
 Allahabad Division  Engineering  The jurisdiction of DEN/E/II/ALD  03-05-2013  Current bill entry   Document
 Allahabad Division  Engineering  The jurisdiction of DEN/ESTATE/I/ALD (ADEN/HQ/I/ALD)  03-05-2013  Current bill entry   Document
 Allahabad Division  Engineering  All bill of DEN-L-CNB under Sr.DEN-III-ALD  03-05-2013     Document
 Allahabad Division  Engineering  All bill of ADEN-T-TDL under Sr.DEN-V-ALD  03-05-2013     Document
 Jhansi Division  IT  Name of work: Technical support, Annual maintenance of PRIME & AFRES at HQ, Construction organization/ALD (ALD, JHS & AGC), JHS DIV, AGC DIV (including RSK/STLI),JHS workshop, AFRES of Traffic accounts office of North Central Railway, Allahabad.  03-05-2013     Document
 Jhansi Division  IT  Name of work: Comprehensive AMC of PCs, Printers, UPS and servers of different department of Jhansi division.  03-05-2013     Document
 Allahabad Division  Engineering  All bills of Sr.DEN/IV/ALD section (ADEN/ETW & ADEN/ FZD) upto 30.04.2013  02-05-2013  Bills passed   Document
 Allahabad Division  Engineering  All bills of DEN/TRACK ALLAHABAD  02-05-2013  Bill Passed   Document
 Construction  Engineering  6th on A/cs Bill No.JHS/C/R/ROB/147/Cont.1/Bill/06 dated 22.04.2013 in favour of M/s Bihari Lal Menghani, BK-I/150, 2nd Floor, Shalimar Bagh, Delhi-88 in connection with the work of Construction of ROB in lieu of level crossing No. 147 "B" at Kms 1179/6-7 in Jhansi-Kanpur section  02-05-2013  Bill has been sent to Accounts Office on 02.05.2013   Document
 Allahabad Division  Engineering  All bills in the jurisdiction of Sr.DEN/II/ALD (ADEN/Line/ALD & ADEN/FTP section)  02-05-2013  Bills passed   Document
 Allahabad Division  Engineering  All bills of ALJN & HQ/CNB Sub-Division  02-05-2013     Document
 Construction  Engineering  8th on A/cs Bill No. JHS/C/Rates/ROB/454/Cont.1/Bill/08 dated 24.04.2013 in favour of M/s Rational Constructions, 10/14F, Baghambari Gaddi, B.D. Puram, Allahabad(UP)in connection with the work of Construction of ROB in lieu of level crossing No. 454 A Near Banda Station at Kms. 1318/7-8 in Jhansi-Banda section  02-05-2013  Bill has been sent to Accounts Office on 02.05.2013   Document
 Construction  Engineering  8th on A/cs Bill No.JHS/C/R/ROB/454/Cont.2/Bil/08 dated 24.04.2013 in favour of Mahfooz Ahmed Khan, Bazaria Purwa, Mahoba in connection with the work of Hiring of one four wheeler commercial multy-utility inspection vehicle minimum 1+6 Seater designTavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in prerfectly good condition with registration one or after 01.01.2010 for daily 12 hrs. availability a period of one year of the use of AXEN/C/MBA for various works of the unit.  02-05-2013  Bill has ben sent to Accounts Office on 02.05.2013   Document
 Allahabad Division  Engineering   ALL Bills in the section of SR DEN/1/ALD (ADEN/MZP)  02-05-2013     Document
 Workshop  RSK Sithouli  Transportation of staff between Gwalior & Rail Spring Karkhana Sithouli, Gwalior  01-05-2013  Bill sent to accounts for payment on 1.5.13.   Document
 Workshop  RSK Sithouli  Transpotation of staff childrens from RSK Colony to verious points in Gwalior & back to RSK Colony.  23-04-2013  Bill sent to the accounts for Payment on 25.04.13   Document
 Workshop  RSK Sithouli  Transpotation of staff children from Rail Spirng Karkhana Sithouli colony to verious points in Gwalior & back to RSK Colony  23-04-2013  Bill sent to accounts for psyment on 25.04.13.   Document
 Workshop  RSK Sithouli  Packing of Springs at RSK.  27-04-2013  Bill sent to the accounts for Payment on 29.04.13   Document
 Workshop  RSK Sithouli  Pavking of Springs at Rail Spring Karkhana Sithouli Gwalior  27-04-2013  Bill sen to the accounts for payment 0n 29.04.13   Document
 Workshop  RSK Sithouli  Provison of Photocopy at RSK/STLI  17-04-2013  Bill sent to accounts for payment on 18.04.13   Document
 Workshop  RSK Sithouli  Supply , Installation & commissioning of Over Head Conveyor Location from shed no.3 bay no.1 new coiling line to existing End grinding shedno.2 at RSK.  16-04-2013  Biil sent accounts for payment on 18.04.13..   Document
 Construction  Electrical   (A) Design, Supply , erection, testing & commissioning of 132/25 Kv Traction substation with 2400 KVAR shunt capacitor bank at Runkuta station of Agra division . (B) Design, supply, erection , testing &commissioning of 132 KV Double circuit AC Transmission line for Runkuta TSS of Agra division and (C) Design, supply,erection , testing & commissioning of 25kv Spat Farah, conversion of Billochpura SSP in SP and kitham SP in SSP of Agra Division.  23-04-2013  Bill sent to account   Document
 Construction  Engineering  Construction of Road Over Bridge (ROB) in lieu of existing level crossing No.492 Kms.1338/8-10 between Agra Cantt â??Dholpur section.  22-04-2013  Bill prepared   Document
 Construction  Electrical   Design, supply, erection, testing & commissioning of 25 KV,AC OHE 50Hz for electrification of additional loop line in connection withYamuna Bridge Yard Remodelling  22-04-2013     Document
 Workshop  RSK Sithouli  Supply, Installation & commissioning of Over Head Conveyor. Location from shed no. 3 bay no.1 new coiling line to exitinng End Grinder shed no. 2 at RSK / STLI, GWL.  10-04-2013  Bill sent to accounts for payment on 17.04.13   Document
 Workshop  RSK Sithouli  AMC Colilng Line at RSK  15-04-2013  Bill sent to acoounts for payment on 16.04.13   Document
 Construction  Engineering  Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad  18-04-2013  bill prepared   Document
 Construction  Engineering   Earthwork and blanketing in residual patches involving additional land acquisition and other location and approach roads connecting local roads with nearby L.Xing and RUBâ??s in connection with AGC-ETW New BG Rail Line  18-04-2013  Bill prepared.   Document
 Construction  Engineering  Risk and cost, Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn of RCC Box type minor bridge and other ancillary works bet ch 84700m to 114100m in connection with AGC-ETW New BG rail Line  18-04-2013  Bill prepared.   Document
 Construction  Engineering  9th on A/cs Bill No. JHS/C/R/ROB/147-B/JHS-CNB/Cont.2/Bill/09 dated 13.04.213 in favour of M/s Randhava Travels & Transport, 378, Gurudwara, Shri Guru Singh Saba, Nanak Ganj, Sipri Bazar, Jhansi in connection with the work of Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of XEN/C/ Jhansi for various works of the unit.  18-04-2013  Bill has been sent to Accounts Office on 18.04.2013   Document
 Workshop  RSK Sithouli  AMC of Coiling Line  15-04-2013  Bill sent to accounts for payment on 16.04.13   Document
 Headquarters  Engineering  PSC sleepers, GRSP, Glued Joints & Improved SEJ.  10-04-2013  Bill submitted to Account Department for payment.   Document
 Headquarters  Engineering  PSC sleepers, GRSP, Glued Joints & Improved SEJ.  02-04-2013  Bill submitted to Account Department for payment.   Document
 Headquarters  Engineering  Combination Fish Plates.  20-03-2013  Bill submitted to Account Department for payment.   Document
 Headquarters  Engineering  PSC sleepers, CMS Xings, Combination Fish Plates, ERC Mark-III, Glued Joints, Fan Shaped Switches & GRSP.  15-03-2013  Bill submitted to Account Department for payment.   Document
 Headquarters  Engineering  PSC sleepers.  11-03-2013  Bill submitted to Account Department for payment.   Document
 Headquarters  Engineering  SGCI Insert & PSC sleepers.  08-03-2013  Bill submitted to Account Department for payment.   Document
 Headquarters  Engineering  ERC Mark-III, Improved SEJ, Fan Shaped Switches.  04-03-2013  Bill submitted to Account Department for payment.   Document
 Headquarters  Engineering  GRSP, CMS Xings, PSC sleepers, ERC Mark-III, Glued Joints, Joggled Fish Plates & Improved SEJ.  28-02-2013  Bill submitted to Account Department for payment.   Document
 Headquarters  Engineering  PSC sleepers, Combination Fish Plates & Glued Joints.  22-02-2013  Bill submitted to Account Department for payment.   Document
 Headquarters  Engineering  Combination Fish Plate, PSC sleepers & Joggled Fish Plate.  18-02-2013  Bill submitted to Account Department for payment.   Document
 Jhansi Division  Mechanical  Name of work:- Annual Maintenance and Operation of Effluent Treatment Plant Incinerator and Painting of assets at Diesel Loco Shed, Jhansi  10-04-2013     Document
 Jhansi Division  Mechanical  Supply and Installation of IRAB Tri Plate Panel Mounted Brake System (with compact type Panel) as per DLW drawing No. 11664733 and RDSO Specification No. MP.0.01.00.19 Rev.00 July 2006 or latest (along with required Pipe & Pipe fittings) for conversion of Diesel Locomotives from Dual Brake to Pure Air Brake .  10-04-2013     Document
 Jhansi Division  Mechanical  Name of work:- Hiring of one Non AC Multi Utility Vehicle for ART (Accident Relief Train), Jhansi. .  10-04-2013     Document
 Jhansi Division  Mechanical  Supply and Installation of IRAB Tri Plate Panel Mounted Brake System (with compact type Panel) as per DLW drawing No. 11664733 and RDSO Specification No. MP.0.01.00.19 Rev.00 July 2006 or latest (along with required Pipe & Pipe fittings) for conversion of Diesel Locomotives from Dual Brake to Pure Air Brake .  10-04-2013     Document
 Jhansi Division  Mechanical  Name of work:- Repairs and Overhauling of Radiator core of Diesel Locomotives.  10-04-2013     Document
 Jhansi Division  Mechanical  Supply, fitment and commissioning of multi resetting type vigilance control device for Diesel Locomotive.  10-04-2013     Document
 Jhansi Division  Mechanical  Replacement of Electromechanical Governor Microprocessor based Governor as per RDSO Specification no. MP.0.17.00.01 (Rev.03) Jan-2010 or lastest (for replacement of W.W.Governor with MCB)". of Diesel Locomotive.  10-04-2013     Document
 Workshop  RSK Sithouli  Transportation of staff by passanger fit vehicle between Gwalior & RSK  10-04-2013  Bill sent to accounts on 05.04.13.   Document
 Workshop  RSK Sithouli  Transportation of staff by passanger fit vehicle between Gwalior & RSK  10-04-2013  Bill sent to accounts on 05.04.13.   Document
 Jhansi Division  Engineering  civil engg work of Vishnu prasad sharma  10-04-2013     Document
 Jhansi Division  Engineering  civil engg works of m/s SUNIL KUMAR GUPTA  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of Shri Ram Vilash Solanki  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of Ram Ratan singh Yadav  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of M/S Pushpraj Singh  10-04-2013     Document
 Jhansi Division  Engineering  civil engg works of m/s Nathu ram contractor  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of Narwani Constructions  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of M/S Kamlesh kumar singhai  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of M/S Jai Durga const  10-04-2013     Document
 Jhansi Division  Engineering  civil engg works of M/S Dixit sales & service  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of M/S Deepesh Electronics JHS  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of Hari ram sahu babina  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of M/S Dinesh & Co  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of Betwa builders  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of Ananad Kumar rai  10-04-2013     Document
 Jhansi Division  Engineering  civil engg work of of ABC Rail Road  10-04-2013     Document
 Jhansi Division  Electrical  cleaning & sanitation work of Jhansi Running Room and trim shed jhansi  10-04-2013     Document
 Jhansi Division  Electrical  Washing & pressing of linen of Jhansi Running Room  10-04-2013     Document
 Jhansi Division  Electrical  Washing & pressing of linen of Jhansi Running Room  10-04-2013     Document
 Construction  Electrical   Electrification of station buildings ,platforms , PI buildings , PWI, office, & residential quarters with power supply arrangement in Lalitpur-Mawai section of new BG Line.  08-04-2013     Document
 Construction  Engineering  2nd on A/cs Bill No.JHS/C/R/LM/Cont.40/Bill/02 dated 26.03.2013 in favour of M/s Ganga Cosntruction Co, A-181 Deen dayal Nagar, Jhansi in connection with the work of Extension of goods platform 322 X 16 m wide & extension of 1/6.10 m RCC slab Bridge at CSTM end for full length goods siding at Lalitpur yard in connection with Lalitpur-Mawai New B. G. Rail line  05-04-2013  Bill has been sent to accounts Office on 08.04.2013   Document
 Construction  Engineering  1st & Final Bill No. JHS/C/R/LM/Cont.34/Bill/01 & Final dated 22.10.2012 in favour of Shri Balaji Engineering, 686/2 A, Civil Line, Behind Chanda Hotel, Jhansi in connection with the work of MISCELLENIOUS WORK OF CAUATION INDICATOR, STOP INDICATOR, SPEED INDICATOR, T/P & T/G, WHISTLE INDICATOR, BRIDGE BOARD, T-OUT BOARD, R MARKER IN CUTTING, CURVE BOARD, LWR BOARD, KM. STONE, HECTOMETER STONE, GRADIENT POST, BRIDGE TABLET, PAINTING OF BOUNDARY STONES & WRITING NCR, ADHESIVE STRIPS ON BRIDGES, GANG TOOL BOXES IN LALITPUR-UDAIPURA SECTION (CH: 0.00-33500) IN CONNECTION WITH LALITPUR -KHAJURAHO NEW B.G. RAIL LINE  05-04-2013  Bill has been sent to accounts Office on 08.04.2013   Document
 Construction  Engineering  Provision of roads, lifting barrier, Hand Pumps, fencing at L-Xings, construction of drains, pitching, toe walls, Nallah diversion, retaining walls, white wash , colour wash and other ancillary works in connection with opening of Bhandai-Manikapura section (0.00 to 50 kms) of AGC-ETW new BG Rail line..  04-04-2013  Bill prepared   Document
 Construction  Electrical  (A) Electrification of defence yard ,with Battery charging facilities in connection with Enhancement of capacity of defence yard at Jhansi.(U.P.) (B) Electrification of platform, SSP rooms, at Sikroda station in connection with conversion of IBH into B class station in Hetampur - Morena section.  04-04-2013  Bill passed   Document
 Construction  Electrical  Design, Supply,erection, testing and commissioning of 25KV , AC OHE 50 Hz for electrification of yard lines and turn outs etc at Defence yard Jhansi in connection with enhancement of handling capacity of the yard.  04-04-2013     Document
 Construction  Electrical  Electrification of approach road , administrative buildings , recreation hall ,mess, guard house, dinning hall , cook house , training shed, barracks, shopping complex, store shed etc and supply erection testing & commissioning of 2*500KVA 11/0.4kv package type sub station and other electrical works in connection with Raising of new Railway Engineers Regiment at Jhansi  04-04-2013     Document
 Construction  Electrical  -(A)Design, Supply,erection, testing and commissioning of 25KV , AC OHE 50 Hz at Etawah yard in connection with construction of new BG Rail line& (B) Design, Supply, erection, testing and commissioning of 25KV , AC OHE 50 Hzfor electrification of , cross over at Lalitpur station in connection with construction of new BG Rail line  04-04-2013     Document
 Construction  Electrical  ,Supply,erection,testing and commissioning of 11KV OH line DP structure 63KVA 11/0.4 KV pole mounting type transformer, MDB, LT panels ETC in connection with stringing of dedicated feeder at 09 stations of Jhansi Division  04-04-2013  Bill passed   Document
 Construction  Engineering  5th on A/cs Bill No. JHS/C/R/LK/Cont.49/Bill/05 dated 25.03.2013 in favour of Chandeep Singh Dhanjal, House No.1246 Khati Baba, Jhansi in connection with the work Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of Dy.CE/C/ Jhansi for various works of the unit.  02-04-2013  Bill has been sent to Accounts Office on 02.04.2013   Document
 Construction  Engineering  Construction of Railway Traction Sub Station & Grid Station building, Road work, earthwork, retaining wall, drainage, development of sub station area, cross track etc. near Naini Railway station on Mirzapur-Allahabad section of  26-03-2013  Bill sent to accounts   Document
 Construction  Engineering  Construction of Railway Protection Force Lines icnluding office and other buildings, Auditorium, Gymnasium, Staff Quarters, Mess, Barracks, Pump Houses, Over head Tanks, Water supply, Sanitation, Landscaping, Horticulture, Devel  26-03-2013  Bill sent to accounts   Document
 Construction  Engineering  Construction of 20 unit Type-V quarters at Subedarganj, Allahabad  26-03-2013  Bill sent to account   Document
 Construction  Engineering  Construction of 20 unit Type-V quarters at Subedarganj, Allahabad  26-03-2013  Bill passed   Document
 Construction  Engineering  Extension of earthwork in formation, extension of Bridge No.28 (1x3.05 M RCC Box) and other misc. work in connection with extension of Kela Siding at Naini Railway Station  26-03-2013  Bill passed   Document
 Construction  Engineering  Construction of Control Room, staff quarters, development of sub station area, approach road, dismantling of existing structures, cross track etc. for traction sub stations at Malva and Sirathu Railway stations on CNB-ALD sectio  26-03-2013  Bill passed   Document
 Construction  Engineering  5th on A/cs Bill No. JHS/C/R/ROB/147/Cont.1/Bill/05 dated 23.03.2013 in favour of M/s Bihari Lal Menghani, BK-I/150, 2nd Floor, Shalimar Bagh, Delhi-88 in connection with the work of Construction of ROB in lieu of level crossing No. 147 "B" at Kms 1179/6-7 in Jhansi-Kanpur section  25-03-2013     Document
 Construction  Engineering  7th on A/cs Bill No. JHS/C/R/JHS-MKP/Cont.5A/Bill/07 dated 22.03.2013 in favour of M/s. Ramesht Construction, Shri Bhaiyalal Krishi Farm, Near over bridge, Parichha, Jhansi in connection with the work of Earthwork construction of flatform, extension of bridge and sand hump in connection with provision of 2nd. Loop line at Badausa, Chitrakootdham and Khoh stations in Jhansi-Manikpur section  25-03-2013  Bill has been sent to Accounts Office on 25.03.2013   Document
 Construction  Engineering  7th on A/cs Bill No.JHS/C/Rates/ROB/454/Cont.1/Bill/07 dated 23.03.2013 in favour of M/s Rational Constructions, 10/14F, Baghambari Gaddi, B.D. Puram, Allahabad(UP)in connection with the work Construction of ROB in lieu oflevel crossing No. 454 a Near Banda Station at Kms. 1318/7-8 in Jhansi-Banda section  25-03-2013  Bill has been sent to Acounts Office on 25.03.2013   Document
 Construction  Electrical  (A) Design, Supply , erection, testing & commissioning of 132/25 Kv Traction substation with 2400 KVAR shunt capacitor bank at Runkuta station of Agra division . (B) Design, supply, erection , testing &commissioning of 132 KV Double circuit AC Transmission line for Runkuta TSS of Agra division and (C) Design, supply,erection , testing & commissioning of 25kv Spat Farah, conversion of Billochpura SSP in SP and kitham SP in SSP of Agra Division.  25-03-2013  Bill passed   Document
 Construction  Electrical  (A)Design, Supply,erection, testing and commissioning of 25KV , AC OHE 50 Hz at Etawah yard in connection with construction of new BG Rail line& (B) Design, Supply, erection, testing and commissioning of 25KV , AC OHE 50 Hzfor electrification of , cross over at Lalitpur station in connection with construction of new BG Rail line  25-03-2013  Bill sent to account   Document
 Construction  Engineering  17th on A/cs Bill No.JHS/C/R/LK/Cont.45/Bill/17 dated 19.03.2013 in favour ofShri Rajeev Singh Bundela, Nehru Nagar, Lalitpur in connection with the work of Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008 for daily 12 hours availability for a period of One year for the use of AXEN (C)-I, Lalitpur for various works of the unit.  23-03-2013  Bill has been sent to Accounts Office on 25.03.2013   Document
 Construction  Engineering  7th bill NoJHS/C/R/LK/Cont.48/Bill/07 dated 18.03.2013 in favour of M/s Randhava Travels and Transport, 378, Gurudwara, Shri Guru Singh Sabhas, Sipri Bazar, Jhansi in connection with the work of Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability for a period of one Year for the use of AXEN (C)-II, Lalitpur for various works of the unit.  21-03-2013  Bill has been sent to Accounts Office on 21.03.2013   Document
 Construction  Electrical  Electrification of station buildings, PI buildings, platform, circulating area , approach roads, residential quarters etc at various stations in connection with up gradation of Mathura- Alwar section ( PHASE-I)â? .  21-03-2013  Bill sent to account   Document
 Construction  Electrical  Electrification of C&W office building , Compressure rooms pit lines with power supply arrangement in connection with tank wagon examination facilities at BAD Yard  21-03-2013  Bill sent to account   Document
 Agra Division  Engineering  bill status for the test bill  20-03-2013     Document
 Construction  Engineering   Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad  19-03-2013  Bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge (ROB) in lieu of existing level crossing No.503 Kms.1352/3-5 between Agra Cantt â??Mathura Jn section at Agra...  19-03-2013  Bill prepared   Document
 Jhansi Division  IT  Photocopying work of different department of Jhansi division  15-03-2013     Document
 Construction  Engineering  16th on A/cs Bill No.JHS/C/R/LK/Cont.45/Bill/16 dated 07.03.2013in favour of Shri Rajeev Singh Bundela, Nehru Nagar, Lalitpur in connection with the work of Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008 for daily 12 hours availability for a period of One year for the use of AXEN (C)-I, Lalitpur for various works of the unit  14-03-2013  Bill has been sent to Accounts Office on 14.03.2013   Document
 Construction  Engineering  7th on a/cs Bill No. HS/C/R/ROB/454/Cont.2/Bil/07 dated 12.03.2013 in favour of Mahfooz Ahmed Khan, Bazaria Purwa, Mahoba in connection with the work of Hiring of one four wheeler commercial multy-utility inspection vehicle minimum 1+6 Seater designTavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in prerfectly good condition with registration one or after 01.01.2010 for daily 12 hrs. availability a period of one year of the use of AXEN/C/MBA for various works of the unit.  14-03-2013  Bill has been sent to Accounts Office on 14.03.2013   Document
 Construction  Engineering  6th on A/cs Bill No. JHS/C/Rates/ROB/454/Cont.1/Bill/06 dated 11.03.2013 in favour of M/s Rational Constructions, 10/14F, Baghambari Gaddi, B.D. Puram, Allahabad(UP)in connection with the work of Construction of ROB in lieu oflevel crossing No. 454 a Near Banda Station at Kms. 1318/7-8 in Jhansi-Banda section  14-03-2013  Bill has ben sent to Accounts office on 14.03.2013   Document
 Construction  Engineering  8th on A/cs Bill No.JHS/C/R/ROB/147-B/JHS-CNB/Cont.2/Bill/08 dated 12.03.2013 in favour of M/s Randhava Travels & Transport, 378, Gurudwara, Shri Guru Singh Saba, Nanak Ganj, Sipri Bazar, Jhansi in connection with the work ofHiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/ Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of XEN/C/ Jhansi for various works of the unit.  14-03-2013  Bill has been sent to Account Office for payment   Document
 Construction  Engineering  4th Bill No.JHS/C/R/LK/Cont.49/Bill/04 dated 08.03.2013 in favour of Chandeep Singh Dhanjal, House No.1246 Khati Baba, Jhansi in connection with the work of Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of Dy.CE/C/ Jhansi for various works of the unit.  11-03-2013  Bill has been sent to Accounts Office on 11.03.2013   Document
 Jhansi Division  Engineering  Civil Engg contract work of shri/M/s Vishnu Prasad Sharma  07-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of shri/M/s Vinay Engg  07-03-2013     Document
 Construction  Engineering  6th on A/cs Bill No. JHS/C/R/LK/Cont.48/Bill/06 dated 01.03.2013 in favour of M/s Randhava Travels and Transport, 378, Gurudwara, Shri Guru Singh Sabhas, Sipri Bazar, Jhansi in connection with the work of Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability for a period of one Year for the use of AXEN (C)-II, Lalitpur for various works of the unit  06-03-2013  Bill has been sent to Accounts Office on 06.03.2013   Document
 Jhansi Division  Engineering  Civil Engg contract work of M/S Vikalp Const  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of M/S Randhava travel  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of M/S Ram Ratan Yadav  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of M/S Ram Khilo  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of M/S Rakesh Singh  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of Pushpak const  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of shri/M/s M/S Permanand & co  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of shri/M/s Manoj Parashar  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of Kumar const  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of Jawahar Auto Engg  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract M/S Jai maa vashno  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of Hari ram Sahu  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of Godhan Singh Tyagi  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of M/S Geeta Const  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of EWAC alloyes  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of M/S betawa const  06-03-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of M/S A.K.const  06-03-2013     Document
 Construction  Electrical  Design, Supply,erection, testing and commissioning of 25KV , AC OHE 50 Hz for electrification of , new Up loop line and Cross Overs etc at Birlanagar station of Jhansi Division  06-03-2013  Bill sent to account   Document
 Construction  Electrical  (A) Electrification of defence yard ,with Battery charging facilities in connection with Enhancement of capacity of defence yard at Jhansi.(U.P.) (B) Electrification of platform, SSP rooms, at Sikroda station in connection with conversion of IBH into B class station in Hetampur - Morena section.  06-03-2013  Bill sent to account   Document
 Construction  Engineering  5th on A/cs bill No. JHS/C/Rates/ROB/454/Cont.1/Bill/05 dated 20.02.2013 in favour of M/s Rational Constructions, 10/14F, Baghambari Gaddi, B.D. Puram, Allahabad(UP)in connection with the work of Construction of ROB in lieu oflevel crossing No. 454 a Near Banda Station at Kms. 1318/7-8 in Jhansi-Banda section  04-03-2013  Bill has been sent to Accounts Office on 04.03.2013   Document
 Construction  Engineering  P.Way linking and other related works from kms. 50 to 84 (34 Kms) in connection with construction of Agra â??Etawah new BG Rail Line  01-03-2013  bill prepared   Document
 Construction  Engineering  8th & Final Bill No.JHS/C/R/LK/Cont. 35/Bill/08th & Final dated 18.02.2013in connection with the work of "Risk & cost of earthwork in embankment and cutting Including side drain & ancillary works between CH: 32675 to 45146 m in Udaipura - Khajuraho section of Lalitpur- Khajuraho New B. G. Rail Line" in favour of M/s. Ganga Construction Co., A-181, Deendayal Nagar, Jhansi (U.P.)  28-02-2013  Bill has been sent to Accounts Office on 28.02.2013   Document
 Construction  Engineering  Provision of station name board, seating arrangement, fixing RCC stones in platform walling, Toe wall, Pitching & Steps in Bridge at Mataundh station in connection with Traffic facility work  27-02-2013  Bill has been sent to Accounts Office on 27.02.2013   Document
 Jhansi Division  Engineering  civil engg contract work of Sunil Kumar Gupta  25-02-2013     Document
 Jhansi Division  Engineering  civil engg contract work of Ram Ratan Singh Yadav  25-02-2013     Document
 Jhansi Division  Engineering  civil engg contract work of Pushpraj Singh  25-02-2013     Document
 Jhansi Division  Engineering  civil engg contract work of shri/M/s Narwani const  25-02-2013     Document
 Jhansi Division  Engineering  civil engg contract work of shri/M/s Narendra Pratap Singh  25-02-2013     Document
 Jhansi Division  Engineering  civil engg contract work of shri/M/s Manoj Parashar  25-02-2013     Document
 Jhansi Division  Engineering  civil engg contract work of M/S Vikalp const.Co  25-02-2013     Document
 Jhansi Division  Engineering  civil engg contract work of M/S Pushpak const.  25-02-2013     Document
 Jhansi Division  Engineering  civil engg contract work of M/S Jawahar Auto Engg  25-02-2013     Document
 Jhansi Division  Engineering  civil Engg contract work of M/S Jai maa vashno  25-02-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of M/S A.K.Const  25-02-2013     Document
 Jhansi Division  Engineering  Civil Lines contract work of M./S rafiq Khan  25-02-2013     Document
 Jhansi Division  Engineering  Civil Lines contract work of shri/M/s Laxmi Const.  25-02-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of shri/M/s Laxmi Chand &Co  25-02-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of Godhan Singh Tyagi  25-02-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of EWAC Alloy.Ltd  25-02-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of Eastern Hardware  25-02-2013     Document
 Jhansi Division  Engineering  Civil Engg contract by Dadda Ji const  25-02-2013     Document
 Jhansi Division  Engineering  Civil Engg contract work of ABC Rail Road  25-02-2013     Document
 Construction  Engineering  6th on A/cs Bill No. JHS/C/R/ROB/454/Cont.2/Bil/06 dated 20.02.2013 in favour of Mahfooz Ahmed Khan, Bazaria Purwa, Mahoba in connection with the work of "Hiring of one four wheeler commercial multy-utility inspection vehicle minimum 1+6 Seater designTavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in prerfectly good condition with registration one or after 01.01.2010 for daily 12 hrs. availability a period of one year of the use of AXEN/C/MBA for various works of the unit.  22-02-2013  Bill has been sent to Accounts office on 22.02.2013   Document
 Construction  Engineering  Construction of Road Over Bridge (Four Lane) in lieu of LC No.491C at Kms.1337/4-6 in JHS-AGC section.  21-02-2013  Bill prepared   Document
 Construction  Engineering  Construction of balance Additional bridges in Agra-Etawah section in connection with construction of Agra-Etawah New BG Rail line  21-02-2013  Bill prepared   Document
 Construction  Engineering  Construction of panel building with D.G. room, High level Platform, Cover over shed on P/F, RRC Jail fencing on P/F, Drinking water taps on P/F, Toilet block, Septic Tank, Pump house, 90000 lit. RCC over head tank, Road work & Circulating area, drain work at TKM & Station building, Medium level P/F, RCC jali fencing on P/F, Toilet block, Septic tank, Road work & criculating area, RB-I=8 units & RB-II= 1 unit at Mawai & other ancillary work.  20-02-2013  Bill has been sent to Accounts Office on 20.02.2013   Document
 Construction  Engineering  Extension of earthwork in formation, extension of Bridge No.28 (1x3.05 M RCC Box) and other misc. work in connection with extension of Kela Siding at Naini Railway Station  19-02-2013  Bill sent to accounts   Document
 Construction  Engineering  Construction of Control Room, staff quarters, development of sub station area, approach road, dismantling of existing structures, cross track etc. for traction sub stations at Malva and Sirathu Railway stations on CNB-ALD sectio  19-02-2013  Bill sent to accounts   Document
 Construction  Engineering  Risk & Cost and Balance work of Earthwork in embankment and cuttiang including side drains & ancillary work & construcion of 23 Minor Briges between Ch: 45146 m to Ch: 56850 m in Udaipura-Chhatarpur Section of Lalitpur-Singrouli New B. G. Rail line.  18-02-2013  Bill has been sent to Accounts Office on 18.02.2013   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008 for daily 12 hours availability for a period of One year for the use of AXEN (C)-I, Lalitpur for various works of the unit  18-02-2013  Bill has been sent to Accounts Office on 18.02.2013   Document
 Construction  Engineering  House Keeping of Officers Rest House (Construction) at Jhansi  18-02-2013  Bill has been sent to Accounts Office on 18.02.2013   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of XEN/C/ Jhansi for various works of the unit.  13-02-2013  Bill has been sent to Accounts Office on 13.02.2013   Document
 Construction  Engineering  Construction of ROB in lieu of level crossing No. 147 "B" at Kms 1179/6-7 in Jhansi-Kanpur section  13-02-2013  Bill has been sent to Accounts Office on 13.02.2013   Document
 Headquarters  Engineering  Glued Joints & Fan Shaped Switches.  12-02-2013  Bill submitted to Account's Department.   Document
 Headquarters  Engineering  PSC Sleepers.  08-02-2013  Bill submitted to Account's Department.   Document
 Headquarters  Engineering  PSC sleepers, Fan Shaped Switches, ERC Mark-III, GRSP, GFN Liners, CMS Xings & Metal Liners.  31-01-2013  Bill submitted to Account's Department.   Document
 Headquarters  Engineering  CMS Xings, PSC sleepers, Fan Shaped Switches, Fittings for SEJ & ERC Mark-III.  23-01-2013  Bill submitted to Account's Department.   Document
 Headquarters  Engineering  PSC sleepers, CMS Xings, ERC Mark-III & Fan Shaped Switches.  17-01-2013  Bill submitted to Account's Department.   Document
 Headquarters  Engineering  Glued Joints & CMS Xings.  10-01-2013  Bill submitted to Account's Department.   Document
 Headquarters  Engineering  PSC sleepers.  04-01-2013  Bill submitted to Account Depaerment.   Document
 Construction  Engineering  Writing of station No. versine, cant on Curve & Station No. on Turn out & Turn in curve between Lalitpur-Udaipura New B. G. Rail line  12-02-2013  Bill has been sent to Accounts Office on 12.02.2013   Document
 Construction  Engineering  Balance bridge work, Earthwork & left over works at different locations of Lalitpur-Mawai Sectionfrom Ch. 32675 m. to Ch. 65100 m., a part of Lalitpur-Khajuraho New B. G. Rail Line  12-02-2013  Bill has been sent to Accounts Office on 12.02.2013   Document
 Construction  Engineering  Balance work of "P. Way work & other Misc. work in connection with Upgradation of Mataund and Kabrai stations (i) Extension of short loop,(ii) provision of 2nd loop (iii) Raising standard interlocking between Jhansi-Manikpur section.  11-02-2013  Bill has been sent to Accounts Office on 11.02.2013   Document
 Jhansi Division  Mechanical  Hiring of Truck capacity (9 ton) for Transportation of Rly Material from JHS to other indian railway unit.  08-02-2013     Document
 Jhansi Division  Mechanical  Mechanised Cleaning and washing of Diesel Locomotives at Diesel Loco Shed, Jhansi.  08-02-2013     Document
 Jhansi Division  Mechanical  Mechanised Cleaning and washing of Diesel Locomotives at Diesel Loco Shed, Jhansi.  08-02-2013     Document
 Jhansi Division  Mechanical  Repairs and Overhauling of Radiator core of Diesel Locomotives.  08-02-2013     Document
 Jhansi Division  Mechanical  Painting of Locomotives with Epoxy cum polyurethane paint confirming to RDSO latest Specification No. M&C / PCN / 100 / 2009 at (or latest) Diesel Loco Shed , Jhansi  08-02-2013     Document
 Construction  Engineering  Construction of Road Over Bridge (ROB) in lieu of existing level crossing No.503 Kms.1352/3-5 between Agra Cantt â??Mathura Jn section at Agra..  07-02-2013  Bill sent to account   Document
 Workshop  RSK Sithouli  Transportation of staff by passenger fit vehicle between Gwalior & RSK  05-02-2013  Sent to account for payment   Document
 Construction  Engineering  Miscellaneous work of Leftover work of Hectometer pedestal, Hectometer post, Km post, Gradient post, Bridge tablets etc. and writing & painting work on the proposed surface and painting of DL & HFL on Bridges and on boundary stones between Lalitpur-Udaipura section (Ch. 0.00 to 33.500) in new B.G. Rail Line section  05-02-2013  Bill has been sent to Accounts Office on 05.02.2013   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of Dy.CE/C/ Jhansi for various works of the unit.  05-02-2013  Bill has been sent to Accounts Office on 05.02.2013   Document
 Construction  Engineering  Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad  04-02-2013  Bill prepared   Document
 Construction  Engineering  Construction of Island platform at Udi and other leftover Misc. civil works in Udi & Phooph and ancillary works in the sectionof Bhind-Etawah for commissioning of Bhind-Etawah section.  01-02-2013  Ist PVC Bill   Document
 Construction  Engineering  Construction of Thyrister Switched shunt type capacitor bank room at Datia, Basai, Hetampur and Gwalior/TSS under JHS Division.  01-02-2013  7th on Account Bill   Document
 Construction  Engineering  Execution of P.Way works in connection with linking of track with 52kg.Rails and MBC Sleepers on Bhind-Etawah section from ch: 101800m to Etawah yard in Cont.Section BEP-10B  01-02-2013  Ist PVC Bill   Document
 Construction  Engineering  Risk & Cost work for Procurement & fabrication and supply of 04 nos of 61m open web girder spans for Yamuna bridge between Bhind- Etawah section.  01-02-2013  7th on Account Bill   Document
 Construction  Engineering  Construction of 20 unit Type-V quarters at Subedarganj, Allahabad  31-01-2013  Bill passed   Document
 Construction  Engineering  Construction of Permanent boundary pillars between LAR-Mawai new B. G. Rail line section (Ch: 0.00 to 65100 Kms)  28-01-2013  Bill has been sent to Accounts Office on 28.01.2013   Document
 Construction  Engineering  Transportation of P.Way material, Linking and lifting of Track, Assembling and laying of turnouts and other miscellenous works for remodelling of Mahoba yard in connection with Mahoba-Khajuraho New B. G. Rail line.  28-01-2013  Bill has been sent to Accounts Office on 28 .01.2013   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability for a period of one Year for the use of AXEN (C)-II, Lalitpur for various works of the unit  23-01-2013  Bill has been sent to Accounts Office on 23.01.2013   Document
 Construction  Engineering  Balance work for Construction of ADEN Office IOW / PWI Office & Workshop, Electric Forman Office and sub station building, D. G. Room, CSI Office, Sick line Supervisor Office, running room, Sub-ordinate rest house, septic tank, drains, road work and other miscellenious workat Khajuraho in connection with MBA-KuRJ New B. G. Rail line.  23-01-2013  Bill has been sent to Accounts Office on 23.01.2013   Document
 Construction  Engineering  Construction of Pit Line, Light repair Shed, Service buildings, Industrial flooring, Pathway, Track work and other Ancillary works in connection with the work of "JHS : Additional Washing Pit line and coaching sick line facilities in Steam Loco Shed at Jhansi  23-01-2013  Bill has been sent to Accounts Office on 23.012013   Document
 Construction  Engineering  Balance work of various Buildings etc. in connection with Raising of new Railway paid 970 Railway Engineers Regiment (TA) at Jhansi  23-01-2013  Bill has been sent to Accounts Office on 23.01.2013   Document
 Workshop  JHS Workshop  General Disinfection and Pest, Rodent Control services at Jhansi Workshop  22-01-2013  Forwarded to WAO/JHS   Document
 Construction  Engineering  Extension of earthwork in formation, extension of Bridge No.28 (1x3.05 M RCC Box) and other misc. work in connection with extension of Kela Siding at Naini Railway Station  21-01-2013  bill passed   Document
 Allahabad Division  Electrical  Bill of security  18-01-2013     Document
 Workshop  RSK Sithouli  Spring Transportation for despatch to verious cons PU's of Indian Railways during 2011-12 consignees end in Indian Railways.  18-01-2013  Biil sent accounts for payment.   Document
 Construction  Engineering  Supplying and stacking of machine crushed stone ballast 65MM aggregate conforming to specification no 101 (REV.2004) including all lead and lift as directed at indicated places between ch 34900M to ch 63000M (including Fatehabad, Manikpura stations) of AGC-ETW new B.G Rail line..  17-01-2013  Bill prepared.   Document
 Construction  Engineering  Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad  17-01-2013  Bill prepared   Document
 Construction  Engineering  P. Way work & other Misc. work including gransportation of P. way material in connection with linking of Track on MBC Sleeper Zone-IV between Ch: 33500 to 65100 including Tikamgarh Yard in Lalitpur-Mawai Section, a part of Lalitpur-Khajuraho-Satna & Rewa-Singrauli including Mahoba-Khajuraho New B.G. Rail Line.  17-01-2013  Bill has been sent to Accounts Office on 17.01.2013   Document
 Construction  Engineering  P. Way work & other Misc. work including Transportation of P. way material in connection with linking of Track on MBC Sleeper Zone-IV between Ch: 33500 to 65100 including Tikamgarh Yard in Lalitpur-Mawai Section, a part of Lalitpur-Khajuraho-Satna & Rewa-Singrauli including Mahoba-Khajuraho New B.G. Rail Line.  17-01-2013  Bill has been sent to Accounts Office on 17.01.2013   Document
 Jhansi Division  Engineering  civil engg contract work by Sudhir Kumar  16-01-2013     Document
 Jhansi Division  Engineering  civil engg contract work Sanjay Gupta  16-01-2013     Document
 Jhansi Division  Engineering  civil engg contract work by Randhava travels  16-01-2013     Document
 Jhansi Division  Engineering  civil engg contract work by M/S Rajendra Agarwal  16-01-2013     Document
 Jhansi Division  Engineering  civil engg contract work M/S permanand & co  16-01-2013     Document
 Jhansi Division  Engineering  civil engg contract work by Narwani const  16-01-2013     Document
 Jhansi Division  Engineering  civil engg contract work by Kamlesh Kumar  16-01-2013     Document
 Jhansi Division  Engineering  Civil Engg Contract work by Jai maa vashno  16-01-2013     Document
 Jhansi Division  Engineering  civil engg contract work by jawahar const  16-01-2013     Document
 Jhansi Division  Engineering  civil engg contract work by Gagan Frieght  16-01-2013     Document
 Jhansi Division  Engineering  civil engg contract work A.K.Const Banada  16-01-2013     Document
 Jhansi Division  Engineering  civil engg contract work by ABC Rail Road  16-01-2013     Document
 Construction  Engineering  Hiring of one four wheeler commercial multy-utility inspection vehicle minimum 1+6 Seater designTavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in prerfectly good condition with registration one or after 01.01.2010 for daily 12 hrs. availability a period of one year of the use of AXEN/C/MBA for various works of the unit.  16-01-2013  Bill has been sent to Accounts Office on 16.01.2013   Document
 Construction  Engineering  Miscellaneous work of Km Stone, Hectometer stone, Gradient post, Bridge Tablet etc. writing & painting work from Udaipura to Tikamgarh(Ch: 33500-52500) in Lalitpur-Mawai new B.G.Rail line.  16-01-2013  Bill has been sent to Accounts Office on 16.01.2013   Document
 Construction  Engineering  Construction of ROB in lieu of level crossing No. 147 "B" at Kms 1179/6-7 in Jhani-Kanpur section  14-01-2013  Bill has been sent to Accounts Office on 15.01.2013   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of XEN/C/ Jhansi for various works of the unit.  14-01-2013  Bill has been sent to Accounts Office on 15.01.2013   Document
 Construction  Engineering  Construction of Road Over Bridge (Four Lane) in lieu of LC No.491C at Kms.1337/4-6 in JHS-AGC section.  11-01-2013  bill prepared   Document
 Workshop  RSK Sithouli  Packing of Springs at RSK.  11-01-2013  Bill sent to accounts on 11.01.13 for payment.   Document
 Workshop  RSK Sithouli  Packing of Springs at RSK  11-01-2013     Document
 Construction  Engineering  Balance bridge work, earthwork & left over works at different locations of Lalitpur-Mawai sectionfrom Ch:00 to 32675 m. a part of Lalitpur-Khajuraho New B. G. Rail Line.  10-01-2013  Bill has been sent to Accounts Office on 10.01.2013   Document
 Construction  Engineering  Construction of Service building , store, workshop shed & inspection pit at Agra Cantt for coaching line facilities at AGC depot AGC-ETW New BG Rail Line.  10-01-2013  Bill prepared   Document
 Construction  Electrical  (A) Electrification of defence yard ,with Battery charging facilities in connection with Enhancement of capacity of defence yard at Jhansi.(U.P.) (B) Electrification of platform, SSP rooms, at Sikroda station in connection with conversion of IBH into B class station in Hetampur - Morena section.  10-01-2013  Bill sent to account   Document
 Construction  Electrical   (A) Design, Supply , erection, testing & commissioning of 132/25 Kv Traction substation with 2400 KVAR shunt capacitor bank at Runkuta station of Agra division . (B) Design, supply, erection , testing &commissioning of 132 KV Double circuit AC Transmission line for Runkuta TSS of Agra division and (C) Design, supply,erection , testing & commissioning of 25kv Spat Farah, conversion of Billochpura SSP in SP and kitham SP in SSP of Agra Division.  10-01-2013     Document
 Workshop  RSK Sithouli  Transportaion of staff by passenger fit vehicle between Gwalior & RSK  08-01-2011  Bill sent to accounts on 03.01.13. and passed by accounts.   Document
 Workshop  RSK Sithouli  Packing of Springs at RSK for 2011-12  08-01-2011  Bill sent to accounts on 31.12.12. and passed by accounts.   Document
 Construction  Engineering  Construction of Washing pit , service building , HS Tank etc. in connection maintenance & Train preparation facilities at Agra Cantt.  07-01-2013  Bill prepared   Document
 Construction  Engineering  Loading, Unloading, leading, transportation and stacking of rails, PSC special/ordinalry sleepers, switches, crossing, GJ, SEJ etc New /Second class from any station to various locations between Lalitpur-Udaipura section including yards, a part Lalitpur-Mawai section in cnnection with Lalitpur-Satna & Rewa-Singrouli including Mahoba-Khajuraho New B. G. Rail line.  05-01-2013  Bill has been sent to Accounts Office on 04.02.2013   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 25 KV,AC OHE 50Hz for electrification of doubling between Yamuna Bridge( excluding Yamuna Bridge Yard) to Etmadpur( including Etmadpur yard)  04-01-2013  Bill sent to account   Document
 Construction  Electrical  (A) Electrification of platform ,station building, Residential quarters, FOB etc. at Birlanagar station in connection with up loop line. .(B )Electrification of sub way at Morena station  04-01-2013  Bill sent to account   Document
 Construction  Engineering  Balance work of "P. Way work & other Misc. work in connection with Upgradation of Mataund and Kabrai stations (i) Extension of short loop,(ii) provision of 2nd loop (iii) Raising standard interlocking between Jhansi-Manikpur section.  04-01-2013     Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008 for daily 12 hours availability for a period of One year for the use of AXEN (C)-I, Lalitpur for various works of the unit  03-01-2013  Bill has been sent to Accounts Office on 03.01.2013   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability for a period of one Year for the use of AXEN (C)-II, Lalitpur for various works of the unit  02-01-2013  Bill has been sent to Accounts Office on 02.01.2013   Document
 Headquarters  Engineering  Joggled Fish Plates, GFN Liners & Improved SEJ.  31-12-2012  Bill submitted to Accounts on 31.12.2012.   Document
 Headquarters  Engineering  ERC Mark-III, Improved SEJ, PSC sleepers, Fan Shaped Switches & Joggled Fish Plates.  21-12-2012  Bill submitted to Accounts on 21.12.2012.   Document
 Headquarters  Engineering  Glued Joints, ERC Mark-III, PSC sleepers & GRSP.  13-12-2012  Bill submitted to Accounts on 13.12.2012.   Document
 Headquarters  Engineering  PSC sleepers.  05-12-2012  Bill submitted to Accounts on 05.12.2012.   Document
 Headquarters  Engineering  GRSP, PSC sleepers, Fan Shaped Switches & CMS Xings.  30-11-2012  Bill submitted to Accounts on 30.11.2012.   Document
 Headquarters  Engineering  GRSP & Glued Joints.  27-11-2012  Bill submitted to Accounts on 27.11.2012.   Document
 Headquarters  Engineering  PSC sleepers & Fan Shaped Switches.  23-11-2012  Bill submitted to Accounts on 23.11.2012.   Document
 Headquarters  Engineering  Joggled Fish Plate, GRSP & ERC Mark-III.  15-11-2012  Bill submitted to Accounts on 15.11.2012.   Document
 Headquarters  Engineering  PSC sleepers, Joggled Fish Plate & CMS Xings.  12-11-2012  Bill submitted to Accounts on 12.11.2012.   Document
 Construction  Engineering  Supplying and stacking of machine crushed stone ballast 65MM aggregate conforming to specification no 101 (REV.2004) including all lead and lift as directed at indicated places between ch 34900M to ch 63000M (including Fatehabad, Manikpura stations) of AGC-ETW new B.G Rail line..  02-01-2013  Billprepared   Document
 Construction  Engineering  Balance bridge work, Earthwork & left over works at different locations of Lalitpur-Mawai Sectionfrom Ch. 32675 m. to Ch. 65100 m., a part of Lalitpur-Khajuraho New B. G. Rail Line  02-01-2013  Bill has been sent to Accounts Office on 02.01.2013   Document
 Construction  Engineering  P. Way work & other Misc. work in connection with linking of Track on MBC Sleeper Zone-III between Ch: 22000 to 33500 including UdaipuraYard in Lalitpur-Mawai Section, a part of Lalitpur-Khajuraho-Satna & Rewa-Singrauli including Mahoba-Khajuraho New B.G. Rail Line  01-01-2013  Bill has been sent to Accounts Office on 01.01.2013   Document
 Construction  Engineering  P. Way works linking, transportation, Ballast supply & other Miscellaneous works in connection with Enhacement of handling capacity of Defence yard at Jhansi  31-12-2012  Bill has been sent to Accounts Office on 31.12.2012   Document
 Construction  Engineering  Earthwork, fencing extension of hume pipe culvert, two bettery charger cum electrical duty room, path-way etc. in connection with enhancement of handling capacity of defence yard at Jhansi  26-12-2012  Bill has been sent to Accounts Office on 26.12.2012   Document
 Construction  Engineering  Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad  26-12-2012  Bill prepared   Document
 Construction  Engineering  Construction of balance Additional bridges in Agra-Etawah section in connection with construction of Agra-Etawah New BG Rail line  26-12-2012  Bill prepared   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of Dy.CE/C/ Jhansi for various works of the unit.  21-12-2012  Bill has been sent to Accounts Office on 21.12.2012   Document
 Construction  Engineering  Hiring of one four wheeler commercial multy-utility inspection vehicle minimum 1+6 Seater designTavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in prerfectly good condition with registration one or after 01.01.2010 for daily 12 hrs. availability a period of one year of the use of AXEN/C/MBA for various works of the unit.  21-12-2012  Bill has been sent to Accounts Office on 21.12.2012   Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  21-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  20-12-2012     Document
 Jhansi Division  Engineering  civil engg contract work  20-12-2012     Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of XEN/C/ Jhansi for various works of the unit.  19-12-2012  Bill has been sent to accounts Office on 19.12.2012   Document
 Construction  Engineering  Extension of earthwork in formation, extension of Bridge No.28 (1x3.05 M RCC Box) and other misc. work in connection with extension of Kela Siding at Naini Railway station  18-12-2012  Bill sent to Accounts   Document
 Construction  Engineering  Soil investigation in connection with construction of ROB in lieu of level crossing No. 497 at Kms 1387/7-8 between JHS-MKP section  18-12-2012  Bill has been sent to Accounts Office on 18.12.2012   Document
 Headquarters  Accounts  Bills passed up to Nov 12  18-12-2012     Document
 Construction  Engineering  Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn of RCC Box type minor bridge and other ancillary works bet ch 63400m to 84700m in connection with AGC-ETW New BG rail Line  17-12-2012  Bill prepared   Document
 Construction  Engineering  Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn of RCC Box type minor bridge and other ancillary works bet ch 63400m to 84700m in connection with AGC-ETW New BG rail Line  17-12-2012  Bill prepared   Document
 Construction  Engineering  Construction of panel building with D.G. room, High level Platform, Cover over shed on P/F, RRC Jail fencing on P/F, Drinking water taps on P/F, Toilet block, Septic Tank, Pump house, 90000 lit. RCC over head tank, Road work & Circulating area, drain work at TKM & Station building, Medium level P/F,RCC jali fencing on P/F, Toilet block, Septic tank, Road work & criculating area, RB-I=8 units & RB-II= 1 unit at Mawai & other ancillary work.  14-12-2012  Bill has been sent to Accounts Office on 14.12.2012.   Document
 Jhansi Division  Mechanical  Hiring of one Non AC Multi Utility Vehicle for ART (Accident Relief Train), Jhansi.  14-12-2012     Document
 Jhansi Division  Mechanical  Hiring of Truck capacity (9 ton) for Transportation of Rly Material from JHS to other indian railway unit.  14-12-2012     Document
 Jhansi Division  Mechanical  Mechanised Cleaning and washing of Diesel Locomotives at Diesel Loco Shed, Jhansi.  14-12-2012     Document
 Jhansi Division  Mechanical  Removal, collection & disposal of garbage and scrap, upkeep of the area at DSL Loco Shed, Jhansi  14-12-2012     Document
 Jhansi Division  Mechanical  Supply and Installation of IRAB Tri Plate Panel Mounted Brake System (with compact type Panel) as per DLW drawing No. 11664733 and RDSO Specification No. MP.0.01.00.19 Rev.00 July 2006 or latest (along with required Pipe & Pipe fittings) for conversion of Diesel Locomotives from Dual Brake to Pure Air Brake.  14-12-2012     Document
 Jhansi Division  Mechanical  Annual Maintenance and Operation of Effluent Treatment Plant Incinerator and Painting of assets at Diesel Loco Shed, Jhansi  14-12-2012     Document
 Construction  Engineering  Construction of ROB in lieu of level crossing No. 147 "B" at Kms 1179/6-7 in Jhani-Kanpur section  12-12-2012  Bill has been sent to Accounts Office on 12.12.2012   Document
 Construction  Engineering  Balance bridge work, earthwork & left over works at different locations of Lalitpur-Mawai sectionfrom Ch:00 to 32675 m. a part of Lalitpur-Khajuraho New B. G. Rail Line.  12-12-2012  Bill has been sent to accounts Office on 12.12.2012   Document
 Headquarters  Accounts  Passed Bills status for the period up to 30th November 2012  10-12-2012  Bills Passed   Document
 Construction  Engineering  Construction of Washing pit , service building , HS Tank etc. in connection maintenance & Train preparation facilities at Agra Cantt.  10-12-2012  Bill prepared   Document
 Allahabad Division  Electrical  bill  08-12-2012     Document
 Construction  Engineering  Risk & Cost of Blanace/ Left over work of E/Work in embankment & cutting including side drains & ancillary works between Ch. 00.00 to 32675 m. including Lalitpur yard in Lalitpur- Udaipura Section of Lalitpur-Khajuraho New B. G.Rail Line  08-12-2012  Bill has been sent to Accounts Office on 10.12.2012   Document
 Construction  Engineering  Construction of station building , platform walling, duty bunk , circulating area , road , protection work, provision of lifting barriers , Tie bars fencing, hand pumps , at L-Xing and other ancillary works in connection with opening of 50 kms to 114 kms section of Agra-Etawah New BG Rail Line  07-12-2012  Bill prepared.   Document
 Construction  Engineering  Construction of Road Over Bridge in lieu of Level Crossing No.37-B at km.907/31-33 at Allahabad-Kanpur section near Khaga station on Khaga-Kishanpur  06-12-2012  Bill passed   Document
 Construction  Engineering  Additiona and alteration of Chheoki Yard in c/With doubling of COI yard-Link Jn. of Phase-II doubling, COI-LOG for Civil work for construction of platfrom, earthwork excavation filling extension of FOB from existing PE COI.  06-12-2012  Bill passed   Document
 Construction  Engineering  Construction of Service building , store, workshop shed & inspection pit at Agra Cantt for coaching line facilities at AGC depot AGC-ETW New BG Rail Line.  05-12-2012  Bill prepard   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of Dy.CE/C/ Jhansi for various works of the unit.  01-12-2012  Bill has been sent to Accounts Office on 03.12.2012   Document
 Construction  Engineering  Construction of 20 unit Type-V quarters at Subedarganj, Allahabad  30-11-2012  Bill sent to accounts   Document
 Construction  Engineering  Extension of earthwork in formation, extension of Bridge No.28 (1x3.05 M RCC Box) and other misc. work in connection with extension of Kela Siding at Naini Railway Station  30-11-2012  Bill passed   Document
 Construction  Engineering  Construction of Railway Traction Sub Station & Grid Station building, Road work, earthwork, retaining wall, drainage, development of sub station area, cross track etc. near Naini Railway station on Mirzapur-Allahabad section of  30-11-2012  Bill passed   Document
 Construction  Engineering  Additiona and alteration of Chheoki Yard in c/With doubling of COI yard-Link Jn. of Phase-II doubling, COI-LOG for Civil work for construction of platfrom, earthwork excavation filling extension of FOB from existing PE COI.  30-11-2012  bill passed   Document
 Construction  Engineering  Construction of 20 unit Type-V quarters at Subedarganj, Allahabad  30-11-2012     Document
 Construction  Electrical  work:-(A)Design, Supply,erection, testing and commissioning of 25KV , AC OHE 50 Hz at Etawah yard in connection with construction of new BG Rail line& (B) Design, Supply, erection, testing and commissioning of 25KV , AC OHE 50 Hzfor electrification of , cross over at Lalitpur station in connection with construction of new BG Rail line  29-11-2012  FIRST ON ACCOUNT BILL   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008 for daily 12 hours availability for a period of One year for the use of AXEN (C)-I, Lalitpur for various works of the unit  27-11-2012  Bill has been sent to Accounts Office on 27.11.2012   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of XEN/C/ Jhansi for various works of the unit.  21-11-2012  Bill has been sent to Accounts Office on 21.11.2012   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability for a period of one Year for the use of AXEN (C)-II, Lalitpur for various works of the unit  21-11-2012  Bill has been sent to Accounts Office on 21.11.2012   Document
 Construction  Engineering  House Keeping of Officers Rest House (Construction) at Jhansi  21-11-2012  Bill has been sent to Accounts Office on 21.11.2012   Document
 Construction  Engineering  Hiring of one four wheeler commercial multy-utility inspection vehicle minimum 1+6 Seater designTavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in prerfectly good condition with registration one or after 01.01.2010 for daily 12 hrs. availability a period of one year of the use of AXEN/C/MBA for various works of the unit.  19-11-2012  Bill has been sent to Accounts Office on 19.11.2012   Document
 Construction  Engineering  Construction of ROB in lieu of level crossing No. 147 "B" at Kms 1179/6-7 in Jhani-Kanpur section  19-11-2012  Bill has been to Accounts Office on 19.11.2012   Document
 Construction  Electrical  Description of the work: Design,manufecturer,supply, testing and commissioning of Automatic Variable Reacrive power Compensaion Equipments(IGBT)based system having fixed HT capacitor and Dynamic reactivo/capacitive power unit of Datia,Basai,Hetampur & Gwalior TSS of Jhansi division.  16-11-2012  7th on account   Document
 Construction  Engineering  Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn of RCC Box type minor bridge and other ancillary works bet ch 63400m to 84700m in connection with AGC-ETW New BG rail Line  15-11-2012  Bill submitted to accounts office on 12.11.12   Document
 Headquarters  Engineering  PSC sleeper, CMS Xings, Fan Shaped Switches, Glued Joints & ERC Mark-III.  09-11-2012  Bill subnitted to Accounts Department.   Document
 Construction  Engineering  Balance bridge work, Earthwork & left over works at different locations of Lalitpur-Mawai Sectionfrom Ch. 32675 m. to Ch. 65100 m., a part of Lalitpur-Khajuraho New B. G. Rail Line  10-11-2012  Bill has been sent to Accounts Office on 10.11.2012   Document
 Construction  Engineering  Construction of Road Over Bridge (Four Lane) in lieu of LC No.491C at Kms.1337/4-6 in JHS-AGC section.  09-11-2012  Bill prepared.   Document
 Construction  Engineering  Construction of duty bunk, earthwork, road work and other misc work at diufferent level crossing betweenBhandai to Fatehabad (including yard) & construction of Height Gauge at RUB's between Bhandai-Udi section in connection with AGC-ETW Line.  09-11-2012  Bill prepared   Document
 Construction  Engineering  Earthwork, fencing extension of hume pipe culvert, two bettery charger cum electrical duty room, path-way etc. in connection with enhancement of handling capacity of defence yard at Jhansi  09-11-2012  Bill has been sent to Accounts Office on 09.11.2012   Document
 Construction  Engineering  Left over work of Agra Yard Remodeling and Mora & Goverdhan Stations of MTJ-AWR section.  08-11-2012  Bill prepared   Document
 Construction  Engineering  Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad  07-11-2012  Bill prepared   Document
 Construction  Engineering  Construction of additional loop line at Bhandai and other misc works in connection of Bhandai yard remodeling on AGC-DHO section of NCR  06-11-2012  Bill prepared   Document
 Headquarters  Engineering  PSC line sleepers.  05-11-2012  Bill submitted to Accounts Deptt. on 05.11.2012.   Document
 Headquarters  Engineering  Glued Joints, Single Coil Spring Washer, CMS Xings for Scissor X-over & PSC line sleepers.  01-11-2012  Bill submitted to Accounts Deptt. on 01.11.2012.   Document
 Headquarters  Engineering  PSC line sleepers.  22-10-2012  Bill submitted to Accounts Deptt. on 22.10.2012.   Document
 Headquarters  Engineering  Fan Shaped Switches, PSC line sleepers, Fish Plate, Improved SEJ & CMS Xings.  19-10-2012  Bill submitted to Accounts Deptt. on 19.10.2012.   Document
 Headquarters  Engineering  Fish Plate, PSC sleepers, Fan Shaped Switches & GFN Liners.  11-10-2012  Bill submitted to Accounts Deptt. on 11.10.2012.   Document
 Headquarters  Engineering  Fan Shaped Switches, GRSP & Composite GRSP.  05-10-2012  Bill submitted to Accounts Deptt. on 05.10.2012.   Document
 Headquarters  Engineering  PSC line sleepers & GRSP.  26-09-2012  Bill submitted to Accounts Deptt. on 26.09.2012.   Document
 Headquarters  Engineering  PSC line sleepers, GFN Liners, GRSP, Single Coil Spring Washer, Fan Shaped Switches & Glued Joints.  20-09-2012  Bill submitted to Accounts Deptt. on 20.09.2012.   Document
 Headquarters  Engineering  Glued Joints.  13-09-2012  Bill submitted to Accounts Deptt. on 13.09.2012.   Document
 Headquarters  Engineering  PSC line sleepers.  13-09-2012  Bill submitted to Accounts Deptt. on 13.09.2012.   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2009 for 12 hours availability fora period of one year for the use of Dy.CE/C/ Jhansi for various works of the unit.  05-11-2012  Bill has been sent to Accounts Office on 05.11.2012   Document
 Construction  Engineering  Provision of roads, lifting barrier, Hand Pumps, fencing at L-Xings, construction of drains, pitching, toe walls, Nallah diversion, retaining walls, white wash , colour wash and other ancillary works in connection with opening of Bhandai-Manikapura section (0.00 to 50 kms) of AGC-ETW new BG Rail line..  05-11-2012  Bill prepared   Document
 Construction  Engineering  Balance bridge work, earthwork & left over works at different locations of Lalitpur-Mawai sectionfrom Ch:00 to 32675 m. a part of Lalitpur-Khajuraho New B. G. Rail Line.  02-11-2012  Bill has been sent to Accounts Office on 02.11.2012   Document
 Headquarters  Accounts  10 days report  02-11-2012  Bill passed   Document
 Construction  Electrical  Hiring of Two Nos. Non AC Multi utility Motor vehicle Tata Sumo(Victa), Tavera, Bolero, Toyota Qualis, innova or Similar make in good working condition with commercial registration including Driver Fuel, Crew and maintenance etc.for a period of12 months for supervision of Electrical construction works in Agra and Jhansi Division of North Central Railway  01-11-2012     Document
 Construction  Engineering  Miscellaneous work of Leftover work of Hectometer pedestal, Hectometer post, Km post, Gradient post, Bridge tablets etc. and writing & painting work on the proposed surface and painting of DL & HFL on Bridges and on boundary stones between Lalitpur-Udaipura section (Ch. 0.00 to 33.500) in new B.G. Rail Line section  01-11-2012  Bill has been sent to Accounts Office on 01.11.2012   Document
 Construction  Engineering  Construction of Station building including panel building, medium level platform with RCC fencing, station name board, road work, culvert, residential quarterRB-I 16 nos., RB-II 2 nos. & Hand pum & other ancillary work at Udaipura & Birari station in connection lalitpur-Singrouli New B. G. Rail line  31-10-2012  Bill has been sent to Accounts Office on 31.10.2012   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008for daily 12 hours availability for a period of One year for the use of AXEN (C)-I, Lalitpur for various works of the unit  31-10-2012  Bill has been sent to Accounts Office on 31.10.2012   Document
 Jhansi Division  Engineering  civil engg contract work by M/s Vikalp const co  30-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by M/s Trading co  30-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by M/s Sun Ultra  30-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by M/s Ravi Sharma  30-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by M/s Jawahar Engg  30-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by M/s Jai Maa Vaishno  30-10-2012     Document
 Jhansi Division  Engineering  Civil Engg works by M/s JAI Durga const  30-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work By M/s Basir Cont.  30-10-2012     Document
 Jhansi Division  Electrical  Cleaning and sanitation work of jhansi running room and trip shed jhansi  30-10-2012     Document
 Jhansi Division  Electrical  Washing and pressing of jhansi running room  30-10-2012     Document
 Jhansi Division  Electrical  Cleaning and sanitation work of jhansi running room and trip shed jhansi  30-10-2012     Document
 Jhansi Division  Electrical  Washing and pressing of jhansi running room  30-10-2012     Document
 Jhansi Division  Electrical  Washing and pressing of jhansi running room  30-10-2012     Document
 Jhansi Division  Electrical  Washing and pressing of jhansi running room  30-10-2012     Document
 Construction  Engineering  P.Way linking and other related works from kms. 84 to 114 (30 Kms) in connection with construction of Agra â??Etawah new BG Rail Line  30-10-2012  Bill prepared   Document
 Jhansi Division  Security  Name of work â?? Hiring of -01 Nos tavera or Sinilar Type (1+6 SEATER) Commercial Diseal vehicle for Crime Prevention at RPF/Post Lalitpur for Round the clock  29-10-2012     Document
 Jhansi Division  Security  Name of work â?? Hiring of -01 Nos tavera or Sinilar Type (1+6 SEATER) Commercial Diseal vehicle for ASC/Gwalior at Jhansi for supervision and Crime Prevention for Round the clock  29-10-2012     Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability for a period of one Year for the use of AXEN (C)-II, Lalitpur for various works of the unit  29-10-2012  Bill has been sent to Accounts Office on 29.10.2012   Document
 Jhansi Division  IT  Name of Work: Photocopying work of different departments of jhansi division  29-10-2012     Document
 Jhansi Division  IT  Name of Work: Photocopying work of different deparments of jhansi division  29-10-2012     Document
 Jhansi Division  IT  Name of Work: AMC of PCs, Printers, UPS and Service of different diparments of jhansi division  29-10-2012     Document
 Construction  Engineering  Construction of ROB in lieu oflevel crossing No. 454 a Near Banda Station at Kms. 1318/7-8 in Jhansi-Banda section  29-10-2012  Bill has been sent to Accounts Office on 29.10.2012   Document
 Construction  Engineering  Construction of ROB in lieu oflevel crossing No. 454 a Near Banda Station at Kms. 1318/7-8 in Jhansi-Banda section  29-10-2012     Document
 Construction  Electrical  Design, Supply,erection, testing and commissioning of 25KV , AC OHE 50 Hz for electrification of , new Up loop line and Cross Overs etc at Birlanagar station of Jhansi Division  26-10-2012     Document
 Construction  Electrical   Electrification of platform , approach road , PI building , AEN office , PWI, office, IOW office , Sr subordinate rest house,. Running room , & other offices in Mahoba-Kajuhaho section including stringing of 11kv OH line (dedicated feeder )from 33/11kv Bamitha sub stn to Kajuraho stn .  26-10-2012     Document
 Construction  Electrical   Electrification of station buildings ,platforms , PI buildings , PWI, office, & residential quarters with power supply arrangement in Lalitpur-Mawai section of new BG Line.  26-10-2012  3RD ON ACCOUNT BILL   Document
 Construction  Electrical   Supply, Erection, Testing and commissioning of LT panel distribution board, Electrification of Shed, and laying of HT/LT cables at rail spring Karkhana Sithouli, Gwalior  26-10-2012  FINAL BILL   Document
 Construction  Engineering  Hiring of one four wheeler commercial multy-utility inspection vehicle minimum 1+6 Seater designTavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in prerfectly good condition with registration one or after 01.01.2010 for daily 12 hrs. availability a period of one year of the use of AXEN/C/MBA for various works of the unit.  26-10-2012  Bill has been sent to Accounts Office on 22.10.2012   Document
 Construction  Engineering  Linking of track, transportation of P.Way material, leading of ballast and misc work relatedto track linking and and E/W blanketing from Kms 18 to 36 i/c with AGC-ETW New BG Rail Line.  25-10-2012  Bill prepared   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability for a period of one Year for the use of AXEN (C)-II, Lalitpur for various works of the unit  19-10-2012     Document
 Construction  Engineering  Additiona and alteration of Chheoki Yard in c/With doubling of COI yard-Link Jn. of Phase-II doubling, COI-LOG for Civil work for construction of platfrom, earthwork excavation filling extension of FOB from existing PE COI.  19-10-2012  Bill sent to Accounts   Document
 Jhansi Division  Engineering  civil engg contract work by Vinod Dwivedi  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by M/S VIKAS CONST  19-10-2012     Document
 Jhansi Division  Engineering  Civil Contract work by M/S Vikalp const co  19-10-2012     Document
 Jhansi Division  Engineering  Civil Const work by Sunil Kumar Gupta  19-10-2012     Document
 Jhansi Division  Engineering  Engg const work by Sudhir KUmar Gupta  19-10-2012     Document
 Jhansi Division  Engineering  Engg Const work by SHIV KUMAR KANPUR  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by SATHYA SAI TRAVELS  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by rush const.  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by R C Gupta  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by SHRI RAVI SHARMA  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by RANDHAVA TRAVELS  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by Ram Kumar Sahu  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by R.B.TIWARI  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by PRAGATI CONST  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work byM/S N.k.TRADERS  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by Smt Meena rai  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by KUMAR CONST.  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by KARAN ENTER. DATIA  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by Kamlesh Shivhare  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by k.s.CHAWLA  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by M/S JHS-Indore Roadway  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by Jawahar Auto engg  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by Jai Maa vaishno  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by JAI Durga const  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by G.S.CONST  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by Dinesh & Co  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by B.S.CONST  19-10-2012     Document
 Jhansi Division  Engineering  civil engg contract work by RADHIKA CONST  19-10-2012     Document
 Workshop  JHS Workshop  Hammering of incoming 6600 No.s per year BOX-N/BOX-C other type of wagons for removing the scales/rust from inside sidewalls, end walls, floor of wagons thereafter, sweeping and disposal of garbage / dust/ debris/ dirt and labeling the same at specified locaiton withing 500 meters at pocket yard for a period of two years  18-10-2012  Forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  Collection, segregation and disposal of 12000 MT Scrap from workshop Jhansi to stores depot, Jhansi & Collection, screening and disposal of 2100 m3 dust/debris from workshop Jhansi to designated inside Workshop  18-10-2012  Forwarded to WAO/JHS   Document
 Headquarters  Accounts  10 days report  17-10-2012  Bill passed   Document
 Construction  Engineering  Construction of Four lane ROB in lieu of existing level crossing No.502 Kms.1350/14 between Mathura-Agra section.  16-10-2012  Bill prepared   Document
 Construction  Engineering  Construction of Service building , store, workshop shed & inspection pit at Agra Cantt for coaching line facilities at AGC depot AGC-ETW New BG Rail Line.  16-10-2012  Bill prepared   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of XEN/C/ Jhansi for various works of the unit.  16-10-2012  Bill has been sent to Accounts Office on 16.10.2012   Document
 Construction  Engineering  Construction of Railway Traction Sub Station & Grid Station building, Road work, earthwork, retaining wall, drainage, development of sub station area, cross track etc. near Naini Railway station on Mirzapur-Allahabad section of  16-10-2012  Bill sent to accounts   Document
 Construction  Engineering  Providing of Booking Window & Varamdah etc at Kabrai & painting of panel building at Mataundh and Kabrai station between Jhansi-Manikpur section  16-10-2012  Bill has been sent to Accounts Office on 16.10.2012   Document
 Construction  Engineering  Balance bridge work, earthwork & left over works at different locations of Lalitpur-Mawai sectionfrom Ch:00 to 32675 m. a part of Lalitpur-Khajuraho New B. G. Rail Line.  15-10-2012  Bill has been sent to Accounts Office on 15.10.2012   Document
 Construction  Engineering  House Keeping of Officers Rest House (Construction) at Jhansi  15-10-2012  Bill has been sent to Accounts Office on 15.10.2012   Document
 Construction  Engineering  Hiring of one four wheeler commercial multy-utility inspection vehicle minimum 1+6 Seater designTavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in prerfectly good condition with registration one or after 01.01.2010 for daily 12 hrs. availability a period of one yearof the use of AXEN/C/MBA for various works of the unit.  11-10-2012  Bill has been sent to Accounts Office on 11.10.2012   Document
 Construction  Engineering  Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad  11-10-2012  Bill prepared   Document
 Construction  Engineering  Hiring of one four wheeler commercial multy-utility inspection vehicle minimum 1+6 Seater designTavera/ Scorpio/Qualis/Victa/Grande/Xylo on monthly basis in prerfectly good condition with registration one or after 01.01.2008 for daily 12 hrs. availability a period of one year of the use of XEN/C/MBA for various works of the unit.  09-10-2012  Bill has been sent to Account Office on 09.10.2012   Document
 Construction  Engineering  Construction of 20 unit Type-V quarters at Subedarganj, Allahabad  09-10-2012  Bill passed   Document
 Construction  Engineering  Construction of transit quarters 3 unit type-V at Agra Cantt  03-10-2012  Bill passed   Document
 Construction  Engineering  Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn  03-10-2012  Bill prepared   Document
 Construction  Engineering  Balance work of "P. Way work & other Misc. work in connection with Upgradation of Mataund and Kabrai stations (i) Extension of short loop,(ii) provision of 2nd loop (iii) Raising standard interlocking between Jhansi-Manikpur section.  01-10-2012  Bill has been sent to Account Office on 01.10.2012   Document
 Construction  Engineering  Balance bridge work, Earthwork & left over works at different locations of Lalitpur-Mawai Sectionfrom Ch. 32675 m. to Ch. 65100 m., a part of Lalitpur-Khajuraho New B. G. Rail Line  26-09-2012  Bill has been sent to Accounts Office on 26.09.2012   Document
 Workshop  RSK Sithouli  Packing of Springs at RSK  26-09-2012  Bill sent to accounts for payment   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008 for daily 12 hours availability for a period of One year for the use of AXEN (C)-I, Lalitpur for various works of the unit  26-09-2012  Bill has been sent to Accounts Office on 26.09.2012   Document
 Jhansi Division  Engineering  Zonal Agreement 2011-12  25-09-2012     Document
 Headquarters  Accounts  Details of Bill passed for sleeper  24-09-2012  Bill passed   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008 for daily 12 hours availability for a period of One year for the use of AXEN (C)-I, Lalitpur for various works of the unit  21-09-2012  Bill has been sent to Accounts office   Document
 Construction  Engineering  Balance bridge work, Earthwork & left over works at different locations of Lalitpur-Mawai Sectionfrom Ch. 32675 m. to Ch. 65100 m., a part of Lalitpur-Khajuraho New B. G. Rail Line  21-09-2012  Bill has been sent to Accounts Office   Document
 Construction  Engineering  Construction of Station building including panel building, medium level platform with RCC fencing, station name board,road work, culvert, residential quarter RB-I 16 nos., RB-II 2 nos. & Hand pum & other ancillary work at Udaipura &Birari station in connection lalitpur-Singrouli New B. G. Rail line  21-09-2012  Bill has been sent to Account Office   Document
 Construction  Engineering  Balance bridge work, earthwork & left over works at different locations of Lalitpur-Mawai sectionfrom Ch:00 to 32675 m. a part of Lalitpur-New B. G. Rail Line.  21-09-2012  Bill has been sent to Accounts Office   Document
 Construction  Engineering  Construction of Industrial flooring, Inspection Pit, miscellaneous building work and extension of heavy and light repairs shed in connection with Augumentation of capacity of electric Loco Shed Jhansi for enhancing home capacity of Electric loco from 120 to 150  21-09-2012  Bill has been sent to Accounts office   Document
 Construction  Engineering  Construction of Industrial flooring, Inspection Pit, miscellaneous building work and extension of heavy and light repairs shed in connection with Augumentation of capacity of electric Loco Shed Jhansi for enhancing home capacity of Electric loco from 120 to 150  21-09-2012  Bill has been sent to Account Office   Document
 Workshop  GWL Workshop  for testing purpose  21-09-2012  bill status   Document
 Workshop  RSK Sithouli  for testing purpose  21-09-2012  bill status   Document
 Jhansi Division  S&T  for testing purpose  21-09-2012  bill status   Document
 Jhansi Division  IT  for testing purpose  21-09-2012  bill status   Document
 Headquarters  IT  Test Bill Status  22-09-2012  test   Document
 IRTMTC  IRTMTC  for testing purpose  21-09-2012  bill status   Document
 IRPMU  S&T  for testing purpose  21-09-2012  bill status   Document
 Construction  Engineering  P. Way work & other Misc. work in connection with linking of Track on MBC Sleeper Zone-III between Ch: 22000 to 33500 including UdaipuraYard in Lalitpur-Mawai Section, a part of Lalitpur-Khajuraho-Satna & Rewa-Singrauli including Mahoba-Khajuraho New B.G. Rail Line  21-09-2012  Bill has been sent to Accounts Office   Document
 Headquarters  IT  for testing purpose  22-09-2012  bill status   Document
 Construction  Electrical  for testing purpose  21-09-2012  bill status   Document
 Allahabad Division  S&T  for testing purpose  21-09-2012  bill status   Document
 Construction  Engineering  Construction of panel building with D.G. room, High level Platform, Cover over shed on P/F, RRC Jail fencing on P/F, Drinking water taps on P/F, Toilet block,Septic Tank, Pump house, 90000 lit. RCC over head tank, Road work & Circulating area, drain work at TKM & Station building, Medium level P/F, RCC jali fencing on P/F, Toilet block, Septic tank, Road work & criculating area, RB-I=8 units & RB-II= 1 unit at Mawai & other ancillary work.  21-09-2012  Bill has been sent to Accounts Office   Document
 Allahabad Division  Accounts  for testing purpose  21-09-2012  bill status   Document
 Agra Division  General  for testing purpose  21-09-2012  bill status for september   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008 for daily 12 hours availability for a period of One year for the use of AXEN (C)-I, Lalitpur for various works of the unit  21-09-2012  Bill has been sent to Accounts Office   Document
 Construction  Engineering  Extension of goods platform 322 X 16 m wide & extension of 1/6.10 m RCC slab Bridge at CSTM end for full length goods siding at Lalitpur yard in connection with Lalitpur-Mawai New B. G. Rail line  21-09-2012  Bill has been sent to Accounts Office   Document
 Construction  Engineering  Soil investigation in connection with construction of ROB in lieu of level crossing No. 182/B Orai Yard  21-09-2012  Bill has been sent to Account Office   Document
 Construction  Engineering  Construction of Industrial flooring, Inspection Pit, miscellaneous building work and extension of heavy and light repairs shed in connection with Augumentation of capacity of electric Loco Shed Jhansi for enhancing home capacity of Electric loco from 120 TO 150  21-09-2012  Bill has been sent to Account office   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008 for daily 12 hours availability for a period of one Year for the use of AXEN (C)-II, Lalitpur for various works of the unit  21-09-2012  Bill has been sent to Accounts Office   Document
 Construction  Engineering  Construction of ROB in lieu oflevel crossing No. 454 a Near Banda Station at Kms. 1318/7-8 in Jhansi-Banda section  21-09-2012  Bill has been sent to Accounts Office   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2009 for 12 hours availability fora period of one year for the use of Dy.CE/C/ Jhansi for various works of the unit.  21-09-2012     Document
 Construction  Engineering  Earthwork construction of flatform, extension of bridge and sand hump in connection with provision of 2nd. Loop line at Badausa, Chitrakootdham and Khoh stations in Jhansi-Manikpur section  21-09-2012     Document
 Construction  Engineering  Fabrication, Erection of Railing, ladder, Door etc on Brige no. 62 at Ch: 44044 and Bridge No. 63 (Jamni river) at Ch; 44387 M bet. Udaipura-Tikamgarh section, a part of Lalitpur-Khajuraho new B. G. Rail line  21-09-2012     Document
 Construction  Engineering  Balance bridge work, earthwork & left over works at different locations of Lalitpur-Mawai sectionfrom Ch:00 to 32675 m. a part of Lalitpur-Khajuraho New B. G. Rail Line.  21-09-2012     Document
 Construction  Engineering  Construction of new Central Chemical and metallurgical Lab at Jhansi workshop.  21-09-2012     Document
 Construction  Engineering  Construction of ROB in lieu oflevel crossing No. 454 a Near Banda Station at Kms. 1318/7-8 in Jhansi-Banda section  21-09-2012  Bill has been sent to Accounts Office   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008 for daily 12 hours availability for a period of One year for the use of AXEN (C)-I, Lalitpur for various works of the unit  21-09-2012     Document
 Construction  Engineering  Construction of New Central Chemical and metallurgical Lab at Jhansi workshop.  21-09-2012     Document
 Construction  Engineering  Providing Gantry with Column for 20 Tonne Crane in Shed â??Aâ?? Bay No. 2 at Jhansi Workshop.  21-09-2012  Bill has been sent to Accounts Office   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of XEN/C/ Jhansi for various works of the unit.  21-09-2012  Bill has been sent to Accounts Office   Document
 Construction  Engineering  Widening and reparing of cess at Various location between Laltipur-Udaipura section(Ch: 00 to 32.675) in New B. G. Rail line section.  21-09-2012     Document
 Construction  Engineering  Construction of Industrial flooring, Inspection Pit, miscellaneous building work and extension of heavy and light repairs shed in connection with Augumentation of capacity of electric Loco Shed Jhansi for enhancing home capacity of Electric loco from 120 TO 150  21-09-2012     Document
 Construction  Engineering  P. Way work & other Misc. work including Transportation of P. way material in connection with linking of Track on MBC Sleeper Zone-IV between Ch: 33500 to 65100 including Tikamgarh Yard in Lalitpur-Mawai Section, a part of Lalitpur-Khajuraho-Satna & Rewa-Singrauli including Mahoba-Khajuraho New B.G. Rail Line.  21-09-2012     Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2009 for 12 hours availability fora period of one year for the use of Dy.CE/C/ Jhansi for various works of the unit.  21-09-2012     Document
 Construction  Engineering  P. Way work & other Misc. work in connection with linking of Track on MBC Sleeper Zone-I between Ch: 00.00 to 11500 including LalitpurYard in Lalitpur-Mawai Section, a part of Lalitpur-Khajuraho-Satna & Rewa-Singrauli including Mahoba-Khajuraho New B. G. Rail Line  21-09-2012     Document
 Construction  Engineering  Construction of Washing Pit balance (6 Nos. Coaches) Length 135.00 m., Kotah stone flooring on island platform and development of circulating/parking areaproviding drains in yard, construction of boundary wall and others misc. work at Khajuraho Station in connection with Mahoba-Khajuraho New B.G. Rail Line (Phase-II).  21-09-2012  Bill has been sent ot Account office   Document
 Construction  Engineering   P. Way works & other Misc. works at Burhpura and Mohasa station at Kms. 1097.098 & 1000.098 between Jhansi-Bina of existing B. G. Rail line in connection with conversion of 'C' class to 'B' class stations and provision of emergency cross over.  21-09-2012  Bill has been sent to Accounts Office   Document
 Construction  S&T  Design, Supply, Installation, Testing and Commissioning of solid state (Electronic) Interlocking System conforming to RDSO specification No. RDSO/SPN/192/2005 with latest amendment and outdoor works at Prempur and Alteration work in Solid state (electronic) interlocking system along with outdoor works at Bidanpur and Kailahat stations in connection with the work of additional loop of Kanpur-Mughalsarai section of Allahabad division of NCR.  20-09-2012  4th on account bill uploaded   Document
 Construction  Engineering  Construction of ROB in lieu oflevel crossing No. 454 a Near Banda Station at Kms. 1318/7-8 in Jhansi-Banda section  20-09-2012  Bill sent to Accounts Office   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Bolero/Qualis/Victa/Grande/Xylo or similar on monthly basis in perfectly good condition with registration on or after 01.01.2008for daily 12 hours availability for a period of one Year for the use of AXEN (C)-II, Lalitpur for various works of the unit  20-09-2012  Bill sent to account Office   Document
 Construction  Engineering  Hiring of one four wheeler commercial multi-utility inspection vehicle minimum 1+6 seater design Tavera/ Scorpio/Qualis/Victa/Grande/Xhlo on monthly basis in perfectly good condition with registration on or after 01.01.2010 for daily 12 hours availability fora period of one year for the use of XEN/C/ Jhansi for various works of the unit.  20-09-2012     Document
 Construction  Engineering  Balance Bridge work, earthwork & left over works at different locations of Lalitpur Mawai section from Ch: 00 to 32675 m a part of Lalitpur-Khajuraho new B. G. Rail line  20-09-2012     Document
 Construction  Engineering  Construction of Control Room, staff quarters, development of sub station area, approach road, dismantling of existing structures, cross track etc. for traction sub stations at Malva and Sirathu Railway stations on CNB-ALD sectio  20-09-2012  Bill sent to accounts   Document
 Construction  Engineering  ConstructionofRoad-over-BridgeinlieuofL-xingNo.15-CatKm.762/25-27nearJignaRailwayStationonMGS-  20-09-2012  Bill passed   Document
 Construction  Engineering  ConstructionofRoadOverBridgeinlieuofL-XingNo.55-AatKm.955/13-15betweenKKS-MWHRailwayStationson  20-09-2012  Bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge at Mirzapur in lieu of L-Xing No. 6-A at Km. 736/13-15 on Allahabad-  20-09-2012  Bill passed   Document
 Construction  Engineering  Extension of civil lines circulating area towards Smith road foot over bridge by diverting Hathi Nala at Allahabad.  20-09-2012  Bill passed   Document
 Construction  Engineering  Construction of Panel building with DG Room, High level platform, cover Over shed on P/F, RCC fencing on platform, drinking water taps on platform, toilet blocks, Septic Tank, Pump House, 90000 liters RCC over head tank, Road wok & Circulating area, Drain work at Tikamgarh & Station building, medium level platform, RCC Jali fencing on platform, toilet block, Septic tank, Road work & circulating area, RB-I = 8 Unit & RB-II = 1 unit at Mawai & other ancillary work  20-09-2012  Bill has been sent to Account Office on 10.09.2012   Document
 Construction  Engineering  Welding of Rail joints with improved preheating welding technology namely compressed air petrol/LPG/along with use of three piece prefabricating moulds for Udaipura-Mawai (Ch: 33500-56100) section, a part of Lalitpur-Khajuraho-Satna- &Rewa singrouli new B. G. Rail line  20-09-2012  Bill has been sent to Accounts Office on 18.09.2012   Document
 Construction  Engineering  PVC bill Earthwork MTJ-AWR sec.  20-09-2012     Document
 Construction  Engineering  15th bill HL platform MTJ-ASR sec.  20-09-2012     Document
 Construction  Engineering  2nd bill ROB 553  20-09-2012  Passed   Document
 Construction  Engineering  3rd bill ROB 528  20-09-2012  Passed   Document
 Construction  Engineering  2nd bill ROB 528  20-09-2012  Passed   Document
 Construction  Engineering  12th bill ROB 90  20-09-2012  Passed   Document
 Construction  Engineering  11th bill ROB 90  20-09-2012  Passed   Document
 Construction  Engineering  11th bill RUB 72  20-09-2012  Passed   Document
 Construction  Engineering  10th bill RUB 72  21-09-2012  Passed   Document
 Allahabad Division  Electrical  Bill  19-09-2012     Document
 Headquarters  Engineering  PSC sleepers.  12-09-2012  Bill submitted to Account Department on 12.09.2012.   Document
 Headquarters  Engineering  PSC sleepers & Fish Plate.  05-09-2012  Bill submitted to Account Department on 05.08.2012.   Document
 Headquarters  Engineering  PSC sleepers, Improved SEJ & Fan Shaped Switches.  30-08-2012  Bill submitted to Account Department on 30.08.2012.   Document
 Headquarters  Engineering  PSC sleepers, Fan Shaped Switches & Plate Screw.  24-08-2012  Bill submitted to Account Department on 24.08.2012.   Document
 Construction  Engineering  Construction of transit quarters 3 unit type-V at Agra Cantt  19-09-2012  Bill prepared   Document
 Construction  Engineering  Construction of Washing pit , service building , HS Tank etc. in connection maintenance & Train preparation facilities at Agra Cantt.  19-09-2012  Bill passed   Document
 Construction  Engineering  Supplying and stacking of machine crushed stone ballast 65MM aggregate conforming to specification no 101 (REV.2004) including all lead and lift as directed at indicated places between ch 34900M to ch 63000M (including Fatehabad, Manikpura stations) of AGC-ETW new B.G Rail line..  19-09-2012  Bill prepared   Document
 Construction  Engineering  Linking of BG track with 60 kg /52 Kg on PRC sleepers density 1660/1540 nos. per Km. including spreading of ballast, linking of turn out, trap, making and fixing of guard rail, check rail, and other P.Way works etc. including dismantling of existing BG track, turn out, trap, diamond and leading, loading, unloading & stacking of P.Way materials etc.in between ETW-MNQ section including ETW, MNQ, Karhal yard etc. in c/with construction of new BG rail line ETW-MNQ of ALD Dvn. of N.C.Rly.  19-09-2012  Passed   Document
 Construction  Engineering  Balance work of Driver running room at Kanpur Central of Allahabad Divison of N.C.Rly.  19-09-2012  Passed   Document
 Construction  Engineering  Extension of PPO building, Provision of RCC beam and slab on repair section. Provision of one room for M-2 section ,Ext of boundary wall, Provision of cycle stand and scooter stand, Provision of supervisor cubical chamber ,Provision of toilet for staff., Drainage improvement ,Repair to hardonite floor, Road work, heavy repair to E-7 section, ,Ext. of cover over shed for inspection of Locos with 15 ton EOT crane 30x13 m, & Linking of BG track with 60kg/52kg Rail on PRC sleepers density 1660 Nos. per km including spreading and rolling ballast, linking of T/out, trap etc. including dismantling of existing BG track T/out, trap, and leading, loading, unloading and stacking of p. way material & Supplying, collecting and stacking of 65mm gauge hard stone machine crushed ballast from Kabrai / Jhansi quarry on railway land /site available etc. in connection augmentation with of capacity of electric loco shed from 120 to 150 locos at electric loco shed at Kanpur N.C. Railway of ALD Division.  19-09-2012  Passed   Document
 Construction  Engineering  construction of double storey various type of staff quarter 56 unit type I (behind Jhakarkati bus stand) 01 unit type II and 04 unit type III quarters at Janmashtami railway colony including dismantling in c/w replacement of 205 nos. quarters in various colonies as Ph.II at Kanpur of N.C.Rly.  19-09-2012  Passed   Document
 Construction  Engineering  Construction of FOB 6.1 m wide at Govindpuri and 2.44m at Bhaupur and platform shelter up & dn at Platform Govindpuri and Bhaupur railway station in connection with additional loops at Govindpuri and provision of 3rd line bet. PNK & BPU of N.C.Rly. Of ALD Dvn.  19-09-2012  Passed   Document
 Construction  Engineering  construction of double storey various type of staff quarter 56 unit type I (behind Jhakarkati bus stand) 01 unit type II and 04 unit type III quarters at Janmashtami railway colony including dismantling in c/w replacement of 205 nos. quarters in various colonies as Ph.II at Kanpur of N.C.Rly.  19-09-2012  Passed   Document
 Headquarters  Engineering  GRSP and Fish Plates.  16-08-2012  Bill submitted to Accounts Department on 16.08.2012.   Document
 Headquarters  Engineering  Joggled Fish Plates.  13-08-2012  Bill submitted to Accounts Department on 13.08.2012.   Document
 Headquarters  Engineering  Improved SEJ, Composite sleepers & GRSP.  09-08-2012  Bill submitted to Accounts Department on 09.08.2012.   Document
 Headquarters  Engineering  PSC sleepers and GRSP.  01-08-2012  Bill submitted to Accounts Department on 01.08.2012.   Document
 Headquarters  Engineering  PSC sleepers and Fan Shaped Switches.  26-07-2012     Document
 Headquarters  Engineering  PSC sleepers.  19-07-2012  Bill submitted to Accounts Department on 19.07.2012.   Document
 Headquarters  Engineering  PSC sleepers.  16-07-2012  Bill submitted to Accounts Department on 16.07.2012.   Document
 Headquarters  Engineering  PSC sleepers.  12-07-2012  Bill submitted to Accounts Department on 11.07.2012.   Document
 Headquarters  Engineering  Iproved SEJ, GRSP & PSC sleerers.  04-07-2012  Bill submitted to Accounts Department on 04.07.2012.   Document
 Headquarters  Engineering  PSC sleerers, Fish Plate & CMS Xings.  26-06-2012  Bill submitted to Accounts Department on 26.06.12.   Document
 Headquarters  Engineering  PSC sleepers.  19-06-2012  Bill submitted to Accounts Department on 19.06.12.   Document
 Headquarters  Engineering  GRSP & PSC sleepers.  15-06-2012  Bill submitted to Accounts Department on 15.06.12.   Document
 Headquarters  Engineering  PSC sleepers.  28-05-2012  Bill submited to Accounts Department on 28.05.2012.   Document
 Construction  Engineering  Linking of BG track with 60 kg /52 Kg on PRC sleepers density 1660/1540 nos. per Km. including spreading of ballast, linking of turn out, trap, making and fixing of guard rail, check rail, and other P.Way works etc. including dismantling of existing BG track, turn out, trap, diamond and leading, loading, unloading & stacking of P.Way materials etc.in between ETW-MNQ section including ETW, MNQ, Karhal yard etc. in c/with construction of new BG rail line ETW-MNQ of ALD Dvn. of N.C.Rly.  19-09-2012  Passed   Document
 Construction  Engineering  Earth work in embankment and cutting including provision of blanketing material on new formation, turfing on side slopes of embankment, construction /extension of minor bridges with RCC Box of various spans up to 3.75m and other allied works for Zone-III (Chainage 37650 to Chainage 55500 M) in connection with construction of New BG Railway line from Etawah to Mainpuri stations of Allahabad division of North Central Railway.  19-09-2012  Passed   Document
 Construction  Engineering  Earth work in embankment and cutting including provision of blanketing material on new formation, turfing on side slopes of embankment, construction /extension of minor bridges with RCC Box of various spans up to 3.75m and other allied works for Zone-II (Chainage 19000 to Chainage 37650 M) in connection with construction of New BG Railway line from Etawah to Mainpuri stations of Allahabad division of North Central Railway.  19-09-2012  Passed   Document
 Construction  Engineering  Construction of ROB in lieu of level crossing no.8-B at Railway KM.1100/31-33 (Dibiyapur town Auraiya) at Phaphund station on CNB- TDL section of N.C.Railway.  19-09-2012  Passed   Document
 Construction  Engineering  Replacement of residential quarters in lieu of existing of old quarters 74 units in phase-I out of102unitstype-Idouble storey quarters at Kanpur of ALD/Divn. Of N.C.Rly.  19-09-2012  Passed   Document
 Workshop  JHS Workshop  Disposal of garbage at different places of workshop premises including cleaning of urinals, Toilets blocks, Washbasins, bathrooms, tea booth and drinking points at Wagon Repair Workshop, Jhansi, Stores depot and Accounts department for a period of two years  19-09-2012  Forwarded to WAO/JHS   Document
 Construction  Engineering  Balance work of Construction of 2 Major bridges (Bridge no. 7 & 39 ) on well foundations with RCC sub structure and PSC super structure over Bhognipur canal, Etawah branch canal in c/with Etawah - Mainpuri New BG Railway line of ALD Dvn of N.C.Rly.  19-09-2012  Passed   Document
 Construction  Engineering  Supplying and collecting and stacking of 65mm gauge hard stone machine Crushed ballast from Billaua /Gwalior quarry on Railway land/site available from CH. 19000 to 37650 KM for Zone-II in connection with provision of new BG Railway Line on Etawahâ??Mainpuri section of Allahabad Division of N.C. Rly.  19-09-2012  Passed   Document
 Construction  Engineering  Construction of washing line with Washing pit, road work, extension of shed 30m x 19.68 m with flooring, inspection pit and Linking of BG track with 60 kg./52kg Rail on PRC Sleepers density 1660 Nos. Per km including spreading and rolling Ballast, linking of T/out, trap etc. including dismantling of existing BG track, turn out, trap, diamond and leading, loading, unloading and stacking of P.way materials in connection with provision Coaching Complex Ph.-II in loco yard at Kanpur of ALD/ Division of N.C. Railway.  19-09-2012  Passed   Document
 Construction  Engineering  Construction of ROB in lieu of level crossing no.240-A at Railway KM.1341/13-14 near Dada nagar between Govindpuri â?? Bhimsen station on CNB- JHS section of N.C.Railway.  19-09-2012  Passed   Document
 Construction  Engineering  Balance work risk and cost of â??Construction of 3 Major bridges on Well foundations with RCC sub structure, PSC super structure on Gangsi and Banshak Canals & Arind River and 7 RCC Box Minor bridges at different locations including allied works from Ch. Km 15 to Km.55 in connection with Etawah - Mainpuri New BG Railway line.  19-09-2012  Passed   Document
 Construction  Engineering  Bill ROB 84  19-09-2012     Document
 Construction  Engineering  Construction/extension of minor bridges with RCC box of various spans upto 3.75 m, earth work including compaction and other allied works in c/with construction of new BG railway line between ETW-MNQ stations of ALD Dvn. of N.C.Rly.  19-09-2012  Passed   Document
 Construction  Engineering  Bill ROB 99&102  19-09-2012     Document
 Construction  Engineering  Bill ROB 136  19-09-2012     Document
 Construction  Engineering  Bill ROB 96  19-09-2012     Document
 Construction  Engineering  bill ROB 115&119  19-09-2012     Document
 Construction  Engineering  Construction of staff quarters, level crossing, platforms, station building, rest house and other miscellaneous works in c/with construction of new BG railway line between ETW-MNQ station of ALD Dvn. of N.C.Rly.  19-09-2012  Passed   Document
 Construction  Engineering  supply of girder for ROB Dadri  19-09-2012     Document
 Construction  Engineering  final bill ROB 139  19-09-2012     Document
 Construction  Engineering  15th bill ROB 131  19-09-2012     Document
 Construction  Engineering  14th bill ROB 131  19-09-2012     Document
 Construction  Engineering  11th bill ROB 131  18-09-2012  Bill passed   Document
 Workshop  RSK Sithouli  Repair/Replacement of walking beam of Bar Heating Furnace.  16-09-2012  passed   Document
 Workshop  RSK Sithouli  Supply6, Installation & Commissioning od Reworking furnace.  16-09-2012  Passed   Document
 Workshop  RSK Sithouli  Spring Transportation for dispatch of Springs to various consignees/PU's of Indian Railways.  16-09-2012  passed   Document
 Workshop  RSK Sithouli  Staff Transportation by passangerbetween Gwalior & RSK.  16-09-2012  passed   Document
 Workshop  RSK Sithouli  Spring Packing at RSK  16-09-2012  Passed   Document
 Workshop  RSK Sithouli   DISPOSAL OF HAZARDFOUS WASTE ITEMS FROM RSK FOR THREE YEARS DISPOSAL OF HAZARDFOUS WASTE ITEMS FROM RSK FOR THREE YEARS  16-09-2012  Passed   Document
 Workshop  JHS Workshop  Collection, segregation and disposal of 12000 MT Scrap from workshop Jhansi to stores depot, Jhansi & Collection, screening and disposal of 2100 m3 dust/debris from workshop Jhansi to designated inside Workshop  11-09-2012  Forwarded to WAO/JHS   Document
 Construction  Engineering  Supplying and stacking of machine crushed stone ballast 65MM aggregate conforming to specification no 101 (REV.2004) including all lead and lift as directed at indicated places between ch 34900M to ch 63000M (including Fatehabad, Manikpura stations) of AGC-ETW new B.G Rail line..  10-09-2012  Bill passed   Document
 Construction  Engineering  Supplying, fabrication & erection/launching of steel girder on running tracks and casting of deck slab, crash barrier etc. on ROB at LC No.532 and supplying fabrication, erection/launching of steel girder for the construction of composite girder for ROB at LC No.502 on running track  10-09-2012  Bill passed   Document
 Construction  Engineering  flash Butt Welding of 60 Kg (HH/90UTS) 52 Kg (90/72UTS) rails at site in newly linked non running track using mobile flash butt welding plant on various projects on North central Railway.  10-09-2012  Bill passed   Document
 Construction  Engineering  Construction of Four lane ROB in lieu of existing level crossing No.502 Kms.1350/14 between Mathura-Agra section.  06-09-2012  bill submitted to accounts office   Document
 Construction  Engineering  Construction of Four lane ROB in lieu of existing level crossing No.502 Kms.1350/14 between Mathura-Agra section.  05-09-2012  bill prepard   Document
 Construction  Engineering  Construction of Service building , store, workshop shed & inspection pit at Agra Cantt for coaching line facilities at AGC depot AGC-ETW New BG Rail Line.  05-09-2012  bill prepared   Document
 Construction  Engineering  Construction of Road Over Bridge (Four Lane) in lieu of LC No.491C at Kms.1337/4-6 in JHS-AGC section.  05-09-2012  bill prepared   Document
 Construction  Electrical  Part(A) Electrification of extended potion of DyCE/C's office, Panel interlocking cabin at Shahgang , Type V special quarter at AGC , SSE/telecom office , Rewiring of old DyCE/C's office at Agra Cantt , provision of T5 fittings at vaious stations in AGC-ETW new BG rail line and other left out works in AGC division of North Central Railways, and Part (B) Electrification of newly constructed panel rooms at Datia , Basai, Gwalior , & Hetampur TSS & Rewiring of existing DyCE[C]'s office complex at Gwalior and other left out works of Jhansi Division  04-09-2012  3RD ON ACCOUNT BILL   Document
 Construction  Electrical  Electrification of station buildings, platform, circulating area approach road , residential quarters etc. At various station in Bhandai-Samshabad-Udi section in connection with construction of new BG rail line.  04-09-2012  SECOND ON ACCOUNT   Document
 Construction  Engineering  Additiona and alteration of Chheoki Yard in c/With doubling of COI yard-Link Jn. of Phase-II doubling, COI-LOG for Civil work for construction of platfrom, earthwork excavation filling extension of FOB from existing PE COI.  29-08-2012  Bill sent to accounts   Document
 Workshop  JHS Workshop  Design supply and commissioning of Mecatronics trainer at Supervisorâ??s Trainer at Supervisorâ??s Training Centre, Jhansi for a period of Four Months.  28-08-2012  Forwarded to WAO/JHS   Document
 Construction  Engineering  Construction of SSE(C&W) office, compressor room , rolling hut, boundary wall , filling earth, steel gantry with catwalk, construction of RCC pathway and other allied works in connection with premium rake examination facility at Baad  28-08-2012  Bill prepared   Document
 Construction  Engineering  Construction of station building , platform walling, duty bunk , circulating area , road , protection work, provision of lifting barriers , Tie bars fencing, hand pumps , at L-Xing and other ancillary works in connection with opening of 50 kms to 114 kms section of Agra-Etawah New BG Rail Line  24-08-2012  bill passed   Document
 Construction  Engineering  Flash Butt Welding of 60 Kg (HH/90UTS) 52 Kg (90/72UTS) rails at site in newly linked non running track using mobile flash butt welding plant on various projects on North central Railway.  24-08-2012  bill passed   Document
 Workshop  JHS Workshop  Collection, segregation and disposal of 12000 MT Scrap from workshop Jhansi to stores depot, Jhansi & Collection, screening and disposal of 2100 m3 dust/debris from workshop Jhansi to designated inside Workshop.  22-08-2012  Forwarded to WAO/JHS   Document
 Construction  Engineering  Construction of Road Over Bridge in lieu of Level Crossing No.48 near Fatehpur Railway station between CNB section.  22-08-2012  Bill passed   Document
 Construction  Engineering  Construction of 20 unit Type-V quarters at Subedarganj, Allahabad  22-08-2012  Bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge (ROB) in lieu of existing level crossing No.503 Kms.1352/3-5 between Agra Cantt â??Mathura Jn section at Agra.  14-08-2012     Document
 Construction  Engineering  Supplying, fabrication & erection/launching of steel girder on running tracks and casting of deck slab, crash barrier etc. on ROB at LC No.532 and supplying fabrication, erection/launching of steel girder for the construction of composite girder for ROB at LC No.502 on running track  08-08-2012  bill passed   Document
 Construction  Engineering  Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn of RCC Box type minor bridge and other ancillary works bet ch 63400m to 84700m in connection with AGC-ETW New BG rail Line  07-08-2012  bill passed   Document
 Construction  Engineering  Remodeling of Manikpur Yard i.e. Linking of tracks and turnouts, deep screening, spreading of ballast etc. including dismantling of existing track, turnout and slewing of track, earthwork, extension and construction of bridge.  04-08-2012  Bill sent to accounts   Document
 Construction  Engineering  Dismantling and providing of turnouts and track, deep screening, supplying and spreading of ballast, through packing supplying of P.Way fittings etc. and other connected works in connection with SSI works at 7 stations between M  04-08-2012  Bill sent to accounts   Document
 Construction  Engineering  Modification in relay room at Agra Cantt RRI Building.  04-08-2012  bill passed   Document
 Construction  Engineering  Construction of Service building , store, workshop shed & inspection pit at Agra Cantt for coaching line facilities at AGC depot AGC-ETW New BG Rail Line.  04-08-2012  bill passed   Document
 Construction  Engineering  Risk and cost, Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn of RCC Box type minor bridge and other ancillary works bet ch 84700m to 114100m in connection with AGC-ETW New BG rail Line  04-08-2012  bill passed   Document
 Construction  Engineering  Construction of Additional bridges in Agra-Etawah section in connection with construction of Agra-Etawah New BG Rail line.  04-08-2012  Bill passed   Document
 Construction  Engineering  Addition and alteration to Agra construction complex to facilitate space for Accounts , Electrical & S&T officers & Staff as well as Subordinate etc  04-08-2012  Bill passed   Document
 Allahabad Division  Electrical  bills  13-07-2012     Document
 Headquarters  Engineering  PSC sleepers, Metal Liners, GFN Liners and GRSP.  08-06-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  GFN Liners and PSC Sleepers.  29-05-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  PSC sleepers, GFN Liners & Fish Plate.  17-05-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  PSC sleepers & GRSP.  14-05-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  PSC sleepers.  02-05-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  PSC Sleepeers, Improved SEJ and GRSP.  19-04-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  PSC sleepers.  13-04-2012  Bill submitted to Account Department.   Document
 Workshop  JHS Workshop  Hammering of incoming 6600 No.s per year BOX-N/BOX-C other type of wagons for removing the scales/rust from inside sidewalls, end walls, floor of wagons thereafter, sweeping and disposal of garbage / dust/ debris/ dirt and labeling the same at specified locaiton withing 500 meters at pocket yard for a period of two years.  18-06-2012  Forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  Collection, segregation and disposal of 12000 MT Scrap from workshop Jhansi to stores depot, Jhansi & Collection, screening and disposal of 2100 m3 dust/debris from workshop Jhansi to designated inside Workshop.  18-06-2012  Forwarded to WAO/JHS   Document
 Construction  Engineering  Construction of Service building , store, workshop shed & inspection pit at Agra Cantt for coaching line facilities at AGC depot AGC-ETW New BG Rail Line.  08-06-2012  passed   Document
 Construction  Engineering  P.Way linking and other related works for 10 kms between kms. 50 to 84 in connection with construction of Agra â??Etawah new BG Rail Line  08-06-2012  passed   Document
 Construction  Engineering  Linking of track, transportation of P.Way material, leading of ballast and misc work relatedto track linking and and E/W blanketing from Kms 18 to 36 i/c with AGC-ETW New BG Rail Line.  08-06-2012  passed   Document
 Construction  Electrical  -Design, supply, erection, testing & commissioning of 25 KV,AC OHE 50Hz for electrification of doubling between Yamuna Bridge( excluding Yamuna Bridge Yard) to Etmadpur( including Etmadpur yard)  05-06-2012  13th On ACCOUNT   Document
 Construction  Engineering  Supplying and stacking of machine crushed stone ballast 65mm aggregate conforming to specification No.101(Rev.2004) including all lead and lift at indicated places between ch.107000m to 114100m in connection with construction of Agra â??Etawah new BG Rail Line.  04-06-2012  Bill passed   Document
 Construction  Engineering  Construction of station building , platform walling, duty bunk , circulating area , road , protection work, provision of lifting barriers , Tie bars fencing, hand pumps , at L-Xing and other ancillary works in connection with opening of 50 kms to 114 kms section of Agra-Etawah New BG Rail Line  04-06-2012  Bill passed   Document
 Construction  Engineering  Supplying, fabrication & erection/launching of steel girder on running tracks and casting of deck slab, crash barrier etc. on ROB at LC No.532 and supplying fabrication, erection/launching of steel girder for the construction of composite girder for ROB at LC No.502 on running track  04-06-2012  Bill passed   Document
 Construction  Engineering  Construction of Four lane ROB in lieu of existing level crossing No.502 Kms.1350/14 between Mathura-Agra section.  04-06-2012  Bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge in lieu of Level Crossing No. 48 near Fatehpur Railway station between CNB section.  31-05-2012  Bill passed   Document
 Construction  Engineering  Construction of Railway Traction Sub Station & Grid Station building, Road work, earthowrk, retaining wall, drainage, development of sub station area, cross track etc. near Naini Railway station on Mirzapur-Allahabad section of Allahabad Divsion in connection with Direct Power Supply from NTPC.  31-05-2012  Bill sent to accounts   Document
 Construction  Engineering  Construction of 120 unit staff quarter at Allahabad on replacement account.  17-05-2012  Bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge in lieu of L-Xing No. 55-A at Km. 955/13-15 between KKS-MWH Railway Stations on ALD- CNB Section at ALD Division.  17-05-2012  Bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge in lieu of L-Xing No. 55-A at Km. 955/13-15 between KKS-MWH Railway Stations on ALD- CNB Section at ALD Division.  17-05-2012  Bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge at Mirzapur in lieu of L-Xing No. 6-A at Km. 736/13-15 on Allahabad-  17-05-2012  Bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge at Mirzapur in lieu of L-Xing No. 6-A at Km. 736/13-15 on Allahabad-  17-05-2012  Bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge at Mirzapur in lieu of L-Xing No. 6-A at Km. 736/13-15 on Allahabad-  17-05-2012  Bill passed   Document
 Construction  Engineering  Construction of Road-over-Bridge in lieu of L-xing No. 15-C at Km. 762/25-27 near Jigna Railway Station on MGS - ALD section of ALD Division  17-05-2012  Bill sent to accounts   Document
 Construction  Engineering  Construction of Road-over-Bridge in lieu of L-xing No. 15-C at Km. 762/25-27 near Jigna Railway Station on MGS - ALD section of ALD Division  17-05-2012  Bill sent to accounts   Document
 Construction  Electrical  Work:â?Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  15-05-2012  Bill passed   Document
 Construction  Electrical  Work:â?Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  15-05-2012  Bill passed   Document
 Construction  Electrical  Work:â?Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  15-05-2012  Bill passed   Document
 Construction  Electrical  Work:â?Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  15-05-2012  Bill passed   Document
 Construction  Electrical  Work:â?Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  15-05-2012  Bill passed   Document
 Construction  Engineering  Construction of Washing pit , service building , HS Tank etc. in connection maintenance & Train preparation facilities at Agra Cantt.  11-05-2012  Biss passed   Document
 Construction  Engineering  Construction of Four lane ROB in lieu of existing level crossing No.502 Kms.1350/14 between Mathura-Agra section.  11-05-2012  Bill passed   Document
 Construction  Engineering  Construction of Service building , store, workshop shed & inspection pit at Agra Cantt for coaching line facilities at AGC depot AGC-ETW New BG Rail Line.  11-05-2012  Bill passed   Document
 Construction  Engineering  Supplying, fabrication & erection/launching of steel girder on running tracks and casting of deck slab, crash barrier etc. on ROB at LC No.532 and supplying fabrication, erection/launching of steel girder for the construction of composite girder for ROB at LC No.502 on running track  11-05-2012  Bill passed   Document
 Construction  Engineering  Construction of transit quarters 3 unit type-V at Agra Cantt  11-05-2012  Bill passed   Document
 Construction  Engineering  Construction of Additional bridges in Agra-Etawah section in connection with construction of Agra-Etawah New BG Rail line.  11-05-2012  Bill passed   Document
 Construction  Engineering  Construction of 06 units Typeâ??V quarters at Subedarganj, Allahabad.  03-05-2012  Bill sent to accounts   Document
 Workshop  JHS Workshop  Complete Styripping of 900 Nos Rehab BOXN wagon inside the wagon repair workshop Jhansi for a period of one year  27-04-2012  Forwarded to WAO/JHS   Document
 Construction  Engineering  Repairing Maintenance and Misc. works of service building and residential quarters of Construction organisation Allahabad  23-04-2012  Bill sent to Account   Document
 Construction  Engineering  Remodeling of Manikpur Yard i.e. Linking of tracks and turnouts, deep screening, spreading of ballast etc. including dismantling of existing track, turnouts and slewing of track, earthwork, extension and construction of bridges,  23-04-2012  Bill sent to account   Document
 Headquarters  Engineering  Improved SEJ, PSC line sleepers, CMS Xings, Bolts & Nuts, GRSP & GFN Liners.  13-04-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  CMS Xings, Joggled Fish Plates, Composite GRSP, Glued Joints, GRSP, ERC Mark-III, Fish Plate, ERC-J & Bolts & Nuts.  03-04-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  GRSP, ERC Mark-III, CMS Xings & Scissor X-over.  23-03-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  GFN Liners.  16-03-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Composite GRSP, Fan Shaped Switches & Improved SEJ.  13-03-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  PSC line & Turnout Sleepers.  06-03-2012  Bill submitted to Account Department.   Document
 Workshop  JHS Workshop  Collection, segregation and disposal of 12000 MT Scrap from workshop Jhansi to stores depot, Jhansi & Collection, screening and disposal of 2100 m3 dust/debris from workshop Jhansi to designated inside Workshop.  19-04-2012  Forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  Hammering of incoming 6600 No.s per year BOX-N/BOX-C other type of wagons for removing the scales/rust from inside sidewalls, end walls, floor of wagons thereafter, sweeping and disposal of garbage / dust/ debris/ dirt and labeling the same at specified locaiton withing 500 meters at pocket yard for a period of two years.  19-04-2012  Forwarded to WAO/JHS   Document
 Construction  Electrical  Supply, Erection, Testing and commissioning of LT panel distribution board, Electrification of Shed, and laying of HT/LT cables at rail spring Karkhana Sithouli, Gwalior  12-04-2012     Document
 Construction  Electrical  -(A) Electrification of New Central Chemical & Metallurigal lab of NC Rly at Jhansi work shop(B) Electrical works in connection with provision of 20 tonne gantry in Jhansi work shop ( C) Electrification of holi day home at Kajuraho.  12-04-2012  3RD ON ACCOUNT BILL   Document
 Construction  Electrical  Design, Supply, modification, testing and commissioning of 25KV , AC, OHE 50 Hz in connection with ROB 502 (location 1355/11-13, between Agra-Mathura section) and ROB 139-B (location)1379/29-31,between, Tundla-Gaziabad section.)  12-04-2012  FIRST ON ACCOUNT BILL   Document
 Construction  Electrical   Augmentation of capacity of 33/11 KV sub station with 2x3 MVA transformers at Agra Cantt.  12-04-2012  FINALBILL   Document
 Construction  Electrical  -Electrification of tank wagon sick line with all accessories at Baad Railway station  12-04-2012  FINALBILL   Document
 Construction  Electrical  -Electrification of station buildings, PI buildings, platform, circulating area , approach roads, residential quarters etc at various stations in connection with up gradation of Mathura- Alwar section ( PHASE-I)â? .  12-04-2012  3RD ON ACCOUNT BILL   Document
 Construction  Electrical  Electrification of newly constructed 60 bedded hospital with 2x500 KVA package type sub station and other civilEngineering work at Agra Cantt.  12-04-2012  FINALBILL   Document
 Construction  Electrical   (A) Design, Supply , erection, testing & commissioning of 132/25 Kv Traction substation with 2400 KVAR shunt capacitor bank at Runkuta station of Agra division . (B) Design, supply, erection , testing &commissioning of 132 KV Double circuit AC Transmission line for Runkuta TSS of Agra division and (C) Design, supply,erection , testing & commissioning of 25kv Spat Farah, conversion of Billochpura SSP in SP and kitham SP in SSP of Agra Division.  12-04-2012  2ND ON ACCOUNT   Document
 Construction  Electrical  Part(A) Electrification of extended potion of DyCE/C's office, Panel interlocking cabin at Shahgang , Type V special quarter at AGC , SSE/telecom office , Rewiring of old DyCE/C's office at Agra Cantt , provision of T5 fittings at vaious stations in AGC-ETW new BG rail line and other left out works in AGC division of North Central Railways, and Part (B) Electrification of newly constructed panel rooms at Datia , Basai, Gwalior , & Hetampur TSS & Rewiring of existing DyCE[C]'s office complex at Gwalior and other left out works of Jhansi Division  12-04-2012  2ND ON ACCOUNT   Document
 Construction  Engineering  Construction of 20 units Type-V quarters at Subedarganj, Allahabad  09-04-2012  Bill sent to account   Document
 Workshop  JHS Workshop  Fabrication, Supply and Retrofitment of Ramper & Rail Unloading Arrangement for Conversion of BRN Wagons including supply of Rollers for Mid Rail Carrier for Two Rakes of Rail DMT (EUR)  04-04-2012  Forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  Retrofitment of bogie mounted brake system on air brake wagons in Jhansi Workshop for 400 wagons  04-04-2012  Forwarded to WAO/JHS   Document
 Headquarters  Engineering  SGCI Insert  01-03-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Fan Shaped Switches to Drg. No. T-4966.  28-02-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  CMS crossings, Derailing switches, GRSP, Fish Plates & F.S. Switches.  10-02-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono Block PSC sleepers, CMS Crossings & Fish Plates.  06-02-2012  Bill submitted to Account Department.   Document
 Construction  Engineering  Expansion of GM Headquarters office building at Subedaqrganj, Allahabad.  26-03-2012  Bill sent to account   Document
 Construction  Engineering  Dismantling and providing of turnouts and track, deep screening, supplying and spreading of ballast, through packing supplying of P.Way fittings etc. and other connected works in connection with SSI works at 7 stations between M  26-03-2012  Bill sent to Account   Document
 Workshop  JHS Workshop  Disposal of garbage at different places of workshop premises including cleaning of urinals, Toilets blocks, Washbasins, bathrooms, tea booth and drinking points at Wagon Repair Workshop, Jhansi, Stores depot and Accounts department for a period of two years  11-03-2012  Forwarded to WAO/JHS   Document
 Allahabad Division  Electrical  contractual bill  03-03-2012     Document
 Construction  Engineering  Bill ROB 139  01-03-2012     Document
 Construction  Engineering  Bill ROB 86  01-03-2012     Document
 Construction  Engineering  Bill ROB 136  01-03-2012     Document
 Construction  Engineering  Bill ROB 131  01-03-2012     Document
 Construction  Engineering  Bill ROB 72  01-03-2012     Document
 Construction  Engineering  Providing additionl loop at 3 stations i.e. Bidanpur, Prempur & Rooma including misc. work in connection with tafffic facility work between Allahabad and Kanpur.  27-02-2012  Final bill sent to account   Document
 Construction  Engineering  Construction of 20 units Type-V quarters at Subedarganj, Allahabad  27-02-2012  Bill sent to account   Document
 Construction  Engineering  Construction of 06 units Typeâ??V quarters at Subedarganj, Allahabad.  24-02-2012  Bill passed   Document
 Workshop  JHS Workshop  Collection, segregation and disposal of 12000 MT Scrap from workshop Jhansi to stores depot, Jhansi & Collection, screening and disposal of 2100 m3 dust/debris from workshop Jhansi to designated inside Workshop.  21-02-2012  Forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  Hiring of one No Non AC four Wheeler (Tavera/Tata Vista GX Turbo/ Qualis/Scorpio/Bolero or equivalent in good working condition with contractors own driver fuel maintenance taxes etc(Approx 1100 kms Per month) at Wagon Repair Workshop Jhansi for One Year  20-02-2012  Forwarded to WAO/JHS   Document
 Construction  Engineering  Construction of Road Over Bridge in lieu of Level Crossing No. 48 near Fatehpur Railway station between CNB section.  14-02-2012  Bill sent to account   Document
 Construction  Electrical  Modification work in 132KV/25KV Traction Sub station in connection with loop in loop out at Manauri, Rasulabad and Sarsaul TSS of Allahabad Division of North Central Railway.  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 220 KV 3 phase double circuits (Approximate 9 Kms) Transmission Line and Gantry structures between 400KV PGCIL SARANGAPUR to 220 KV/132KV Railway GSS Naini over Allahabad division of North Central Railway.  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 220 KV 3 phase double circuits (Approximate 9 Kms) Transmission Line and Gantry structures between 400KV PGCIL SARANGAPUR to 220 KV/132KV Railway GSS Naini over Allahabad division of North Central Railway.  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 220 KV 3 phase double circuits (Approximate 9 Kms) Transmission Line and Gantry structures between 400KV PGCIL SARANGAPUR to 220 KV/132KV Railway GSS Naini over Allahabad division of North Central Railway.  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 220 KV 3 phase double circuits (Approximate 9 Kms) Transmission Line and Gantry structures between 400KV PGCIL SARANGAPUR to 220 KV/132KV Railway GSS Naini over Allahabad division of North Central Railway.  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 220/132 KV Grid sub station along with 132KV/25 KV Traction sub station at Naini over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 220/132 KV Grid sub station along with 132KV/25 KV Traction sub station at Naini over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 220/132 KV Grid sub station along with 132KV/25 KV Traction sub station at Naini over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 220/132 KV Grid sub station along with 132KV/25 KV Traction sub station at Naini over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 220/132 KV Grid sub station along with 132KV/25 KV Traction sub station at Naini over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 220/132 KV Grid sub station along with 132KV/25 KV Traction sub station at Naini over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 132/25 KV Traction sub stations at Malwah & Sirathu over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 132/25 KV Traction sub stations at Malwah & Sirathu over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 132/25 KV Traction sub stations at Malwah & Sirathu over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 132/25 KV Traction sub stations at Malwah & Sirathu over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 132/25 KV Traction sub stations at Malwah & Sirathu over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 132/25 KV Traction sub stations at Malwah & Sirathu over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 132/25 KV Traction sub stations at Malwah & Sirathu over Allahabad Division of North Central Railway  10-02-2012  Bill passed   Document
 Headquarters  Engineering  Derailing Switches & Fan Shaped Switches.  09-02-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono Block PSC Sleeper  08-02-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block PSC sleepers.  24-01-2012  Bill submitted to Account Department.   Document
 Headquarters  Engineering  G.F.N. Liners  09-01-2012  Bill submitted to Account Department.   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill submitted to A/c on 9.2.12   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill submitted to A/c on 29.6.11   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  09-02-2012  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  02-08-2011  Bill passed   Document
 Construction  Electrical  Design, supply, erection, testing and commissioning of 132 KV 3 Phase double circuit Tr. Line between Sarsaul/TSS to NYN/TSS over Allahabad division of North Central Railway.  29-06-2011  Bill passed   Document
 Construction  Engineering  Remodeling of Manikpur Yard i.e. Linking of tracks and turnouts, deep screening, spreading of ballast etc. including dismantling of existing track, turnouts and slewing of track, earthwork, extension and construction of bridges,  09-02-2012  Bill sent to accounts   Document
 Construction  Engineering  R&C Balance left over work Earthwork in embankment & cutting including provision of mechanically crushed /blended material blanketing layer and constn of RCC Box type minor bridges bet ch.36400 to 63400m in connection with AGC-ETW new B.G line.  06-02-2012  bill passed   Document
 Construction  Engineering  Provision of roads, lifting barrier, Hand Pumps, fencing at L-Xings, construction of drains, pitching, toe walls, Nallah diversion, retaining walls, white wash , colour wash and  06-02-2012  bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge (Four Lane) in lieu of LC No.491C at Kms.1337/4-6 in JHS-AGC section.  06-02-2012  bill passed   Document
 Construction  Engineering  Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn of RCC Box type minor bridge and other ancillary works bet ch 63400m to 84700m in connection with AGC-ETW New BG rail Line  06-02-2012  bill passed   Document
 Construction  Engineering  Risk and cost, Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn of RCC Box type minor bridge and other ancillary works bet ch 84700m to 114100m in connection with AGC-ETW  06-02-2012  bill passed   Document
 Construction  Engineering  Construction of Additional bridges in Agra-Etawah section in connection with construction of Agra-Etawah New BG Rail line.  06-02-2012  bill passed   Document
 Workshop  JHS Workshop  Collection, segregation and disposal of 12000 MT Scrap from workshop Jhansi to stores depot, Jhansi & Collection, screening and disposal of 2100 m3 dust/debris from workshop Jhansi to designated inside Workshop.  02-02-2012  forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  Hammering of incoming 6600 No.s per year BOX-N/BOX-C other type of wagons for removing the scales/rust from inside sidewalls, end walls, floor of wagons thereafter, sweeping and disposal of garbage / dust/ debris/ dirt and labeling the same at specified locaiton withing 500 meters at pocket yard for a period of two years.  02-02-2012  Forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  Retrofitment of bogie mounted brake system on air brake wagons in Jhansi Workshop for 400 wagons  28-01-2012  Forwarded to WAO/JHS   Document
 Headquarters  Engineering  Joggled Fish Plates, Bolts & Nuts, Derailing Switches, GFN Liners, ERC Mark-III & Mono block sleepers.  30-12-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  GRSP, HTS wire, Glued Joints, Metal Liners & ERC Mark-III.  19-12-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Metal Liners, Composite GRSP & ERC Mark-III.  09-12-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Glued Joints & Improved SEJ.  05-12-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  GRSP, Glued Joints & Fish Plates.  30-11-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  GRSP, Fish Plates & ERC Mark-III.  23-11-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  CMS Xings, ERC Mark-III, Mono block sleepers, GRSP, F.S.Switches & HTS Wire.  17-11-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  SEJ without Fittings, GRSP, Improved SEJ & F.S.Switches.  07-11-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  ERC Mark-III, F.S.Switches, GRSP, Glued Joints & CMS Xings.  31-10-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  ERC Mark-III, Mono block sleepers, Turn out sleepers & HTS Wire.  18-10-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  F.S.Switches.  13-10-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers.  04-10-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  F.S.Switches, Glued Joints, Fittings for SEJ, CMS Xings, Fish Plates & Mono block sleepers.  29-09-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  GRSP, Metal Liners, Fittings for SEJ.  21-09-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  GFN Liners, ERC Mark-III & PSC sleepers.  16-09-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  F.S.Switches, HTS Wire, Mono block sleepers, Glued Joints, Improved SEJ & F.S.Switches.  14-09-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers, F.S. Switches, ERC Mark-III & Glued Joints.  06-09-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  ERC Mark-III, CMS Xings & Mono block sleepers.  30-08-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers.  18-08-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers & F.S.Switches.  12-08-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  CMS Xings, Mono block sleepers, Glued Joints, Metal Liners & ERC Mark-III.  05-08-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  GRSP, Composite GRSP, CMS Xings, Glued Joints, ERC Mark-III & Metal Liners.  28-07-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers, ERC Mark-III, Metal Liners, GFN Liners, SEJ & Glued Joints.  25-07-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers, Scissor X-over, Switches & Mono block sleepers.  14-07-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Metal Liner & Mono block sleepers.  05-07-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  ERC Mark-III, Metal Liners & Mono block sleepers.  29-06-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  ERC Mark-III, Fittings for SEJ & Mono block sleepers.  24-06-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Joggled Fish Plates, ERC Mark-III, Mono block sleepers, Metal Liners & SGCI Insert.  20-06-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers.  09-06-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Diamond Xings, Fittings for SEJ, Glued Joints & Metal Liners.  03-06-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  CMS Xings, Metal Liners, Fish Plate & Joggled Fish Plates.  31-05-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Joggled Fish Plates, Mono block sleepers & Metal Liners.  20-05-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Glued Joints, SEJ, Derailing Switches, Mono block sleepers, F.S.Switches, ERC Mark-III, Diamond Xings, Improved SEJ & Metal Liners.  31-05-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers & Turn out sleepers.  27-04-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  G.R. Fittings, MS Clamp, F.S.Switches & Joggled Fish Plates.  21-04-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  GRSP, Screw, Scissor X-over, CMS Xings, F.S.Switches, Mono block sleepers & Turn out sleepers.  13-04-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers & Turn out sleepers.  11-04-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  MS clamp, F.S.Switches, SGCI Insert, Glued Joints, Dowel, ERC Mark-III, GRSP, Daimond Xings, Mono block sleepers, Turn out sleepers & ERC-GJ clip.  07-04-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  GRSP, Screw, Glued Joints, CMS Xings, ERC Mark-III, Metal Liners, SGCI Insert, F.S.Switches & Joggled Fish Plates.  29-03-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers.  20-03-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers.  11-03-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleeper.  03-03-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block & turn out PSC sleeper.  03-02-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers.  31-01-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block & Turn out PSC sleepers.  17-01-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono block sleepers  06-01-2011  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono black sleepers.  03-11-2010  Bill submitted to Account Department.   Document
 Headquarters  Engineering  Mono -Block Sleeper  15-10-2010  Bill submitted to Account Department.   Document
 Construction  Engineering  bill ROB 90C  18-01-2012     Document
 Construction  Engineering  bill ROB 136  18-01-2012     Document
 Workshop  JHS Workshop  Disposal of garbage at different places of workshop premises including cleaning of urinals, Toilets blocks, Washbasins, bathrooms, tea booth and drinking points at Wagon Repair Workshop, Jhansi, Stores depot and Accounts department for a period of two years  07-01-2012  Forwarded to WAO/JHS   Document
 Construction  Electrical  Design, Supply,erection, testing and commissioning of 25KV , AC OHE 50 Hz ,and 25KV SSP equipments at Mohasa station for electrification of , additiomal loop line in connection with conversion of C class to B class station at Mohasa & Bur  05-01-2012  6TH ON ACCOUNT   Document
 Construction  Electrical  Design, supply, erection, testing & commissioning of 25 KV,AC OHE 50Hz for electrification of doubling between Yamuna Bridge( excluding Yamuna Bridge Yard) to Etmadpur( including Etmadpur yard)  05-01-2012  12TH ON ACCOUNT   Document
 Construction  Electrical  Part-A : Electrification ,Air conditioning and power supply arrangement for RRI cabin at Jamuna Bridge stationPart-B : Electrification of platforms, circulating area, ASM room ,relay room, battery room, DG room , duty room etc. in Chhalesar, kuberpur and Etmadpur stations in connection with doubling of TDL-Yamuna bridge Section  05-01-2012  FINAL BILL   Document
 Construction  Engineering  Addition and alteration of Chheoki Yard in c/with doubling of COI yard-Link Jn. of Phase-II doubling, COI-LOG for civil work for construction of platform, earthwork excavation filling extension of FOB from existing PF, COI to n  04-01-2012  Bill sent to account   Document
 Construction  Electrical  Design, Supply,erection, testing and commissioning of 25KV , AC OHE 50 Hz in connection with remodelling of the yard at Agra Cantt.  03-01-2012  ON ACCOUNT   Document
 Construction  Electrical  Electrification of station buildings, PI buildings, platform, circulating area , approach roads, residential quarters etc at various stations in connection with up gradation of Mathura- Alwar section ( PHASE-I)â? .  03-01-2012  ON ACCOUNT   Document
 Construction  Engineering  Expansion of Indian Railways Track Machine Training Centre at Subedarganj, Allahabad.  30-12-2011  Bill sent to account   Document
 Construction  Engineering  Expansion of Indian Railways Track Machine Training Centre at Subedarganj, Allahabad.  30-12-2011  Bill passed   Document
 Construction  Engineering  Expansion of Indian Railways Track Machine Training Centre at Subedarganj, Allahabad.  30-12-2011  Bill passed   Document
 Construction  Engineering  Construction of stadium, badminton hall, swimming pool etc. on North Central Railway at Subedarganj/Allahabad.  30-12-2011  Bill passed   Document
 Construction  Engineering  Construction of stadium, badminton hall, swimming pool etc. on North Central Railway at Subedarganj/Allahabad.  30-12-2011  Bill passed   Document
 Construction  Engineering  Construction of stadium, badminton hall, swimming pool etc. on North Central Railway at Subedarganj/Allahabad  30-12-2011  Bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge /Iradatgunj in lieu of level crossing No. 430-A at Km. 1341/10-12 on Jabalpur-Allahabad Section.  30-12-2011  Bill passed   Document
 Construction  Engineering  Provision of combined running room for Drivers and Guards at Allahabad.  29-12-2011  18 on account Bill passed   Document
 Construction  Engineering  Provision of combined running room for Drivers and Guards at Allahabad.  29-12-2011  Bill passed on 13-04-2010   Document
 Construction  Engineering  Construction of additional room for installation of power supply arrangement for SSI works at Chunar Railway station.  29-12-2011  Bill sent to account on 29-08-2011   Document
 Construction  Engineering  Construction of Road Over Bridge in lieu of Level Crossing No. 48 near Fatehpur Railway station between CNB section.  29-12-2011  10th on account bill passed   Document
 Construction  Engineering  Construction of Railway Protection Force Lines including office andother buildings, Auditorium, Gymnasium, Staff Quarters, Mess, Barracks, Pump Houses, Over head Tanks, Water supply, Sanitation, Landscaping, Horticulture, Develo  29-12-2011  Bill passed   Document
 Construction  Engineering  Construction of Railway Protection Force Lines including office andother buildings, Auditorium, Gymnasium, Staff Quarters, Mess, Barracks, Pump Houses, Over head Tanks, Water supply, Sanitation, Landscaping, Horticulture, Develo  29-12-2011  Bill passed   Document
 Construction  Engineering  Construction of 66 unit type-I staff quarter at Allahabad.  29-12-2011  Bill passed   Document
 Construction  Engineering  Construction of Control Room, staff quarters, development of sub station area, approach road, dismantling of existing structures, cross track etc. for traction sub stations at Malva and Sirathu Railway stations on CNB-ALD sectio  29-12-2011  Bill sent to Accounts on 23-11-2011   Document
 Construction  Engineering  Construction of Control Room, staff quarters, development of sub station area, approach road, dismantling of existing structures, cross track etc. for traction sub stations at Malva and Sirathu Railway stations on CNB-ALD sectio  29-12-2011  Bill sent to Account on 30-09-2011   Document
 Construction  Engineering  Construction of Road Over Bridge in lieu of Level Crossing No.119-B at km.692/15-17 on main line of Howrah-Delhi Rajdhani route on Mughalsarai-Allahabad section near Kailahat Railway station on Allahabad Division.  29-12-2011  Bill sent to Account on August 11   Document
 Construction  Engineering  Providing additionl loop at 3 stations i.e. Bidanpur, Prempur & Rooma including misc. work in connection with tafffic facility work between Allahabad and Kanpur.  28-12-2011  Final bill sent to Account   Document
 Construction  Engineering  Construction of 6 unit type-V quarters at Allahabad, VI unit on account  28-12-2011  Bill sent to account on 19.12.2011   Document
 Construction  Engineering  Construction of 6 unit type-V quarter at Allahabad, VIth on account  28-12-2011  Bill sent to account on 19.12.2011   Document
 Construction  Engineering  Construction of 6 unit type-V quarter at Allahabad, Vth on account bill  28-12-2011  Bill sent to account on 27.05.2011   Document
 Construction  Engineering  Supplying and stacking of machine crushed stone ballast 65MM aggregate conforming to specification no 101 (REV.2004) including all lead and lift as directed at indicated places between ch 34900M to ch 63000M (including Fatehabad, Manikpura stations) of AGC-ETW new B.G Rail line..  14-12-2011  passed   Document
 Construction  Engineering  Construction of Service building , store, workshop shed & inspection pit at Agra Cantt for coaching line facilities at AGC depot AGC-ETW New BG Rail Line.  14-12-2011  passed   Document
 Construction  Engineering  Construction of station building , platform walling, duty bunk , circulating area , road , protection work, provision of lifting barriers , Tie bars fencing, hand pumps , at L-Xing  14-12-2011  bill passed   Document
 Construction  Engineering  Construction of Four lane ROB in lieu of existing level crossing No.502 Kms.1350/14 between Mathura-Agra section.  14-12-2011  passed   Document
 Construction  Engineering  Bill  09-12-2011     Document
 Construction  Engineering  Bill  09-12-2011     Document
 Construction  Engineering  Bill  09-12-2011     Document
 Construction  Engineering  Bill  09-12-2011     Document
 Construction  Engineering  bill  09-12-2011     Document
 Construction  Engineering  Bills of DY.CE/C/II/AGC  09-12-2011  Psssed   Document
 Construction  Electrical  Supply, erection, testing and commissioning of 25 Kv 50 Hz AC OHE in connection with gauge conversion of Mathura Jn (MG yard) part of Kasganj-Mathura gauge conversionâ?  29-11-2011     Document
 Construction  Electrical  Supply, erection, testing and commissioning of 85W street type CFL fitting , 150W street type MH fittingm high mast towers with 2x400W MH fittings and associated works in connection with improvement of illumination of street lights at 08 stations of Jhansi Division  15-11-2011  FIRST ON ACCOUNT   Document
 Workshop  JHS Workshop  Certification of ISO 9001-2008 for wagon repair workshop jhansi and store depot for a period of three years  11-11-2011  Forwarded to WAO   Document
 Construction  Engineering  Extension of PPO building, Provision of RCC beam and slab on repair section. Provision of one room for M-2 section ,Ext of boundary wall, Provision of cycle stand and scooter stand, Provision of supervisor cubical chamber ,Provision of toilet for staff., Drainage improvement ,Repair to hardonite floor, Road work, heavy repair to E-7 section, ,Ext. of cover over shed for inspection of Locos with 15 ton EOT crane 30x13 m, & Linking of BG track with 60kg/52kg Rail on PRC sleepers density 1660 Nos. per km including spreading and rolling ballast, linking of T/out, trap etc. including dismantling of existing BG track T/out, trap, and leading, loading, unloading and stacking of p. way material & Supplying, collecting and stacking of 65mm gauge hard stone machine crushed ballast from Kabrai / Jhansi quarry on railway land /site available etc. in connection augmentation with of capacity of electric loco shed from 120 to 150 locos at electric loco shed at Kanpur N.C. Railway of ALD Division.  05-11-2011  Passed   Document
 Construction  Engineering  Extension of h igh level passenger platform at Rurah and phaphund railway station of ALD Dvn. ofN.C.Rly. , linking of BG track with 60/52 Kg rail on PRC sleepers, density 1660 nos. per KM. including supply of 65 mm gauge machine crushed hard stone ballast, spreading and rolling ballast, linking of T/out, trap etc. including dismantling of existing BG track, t/out, trap, diamond and leading, loading, unl;oading and stacking of P.Way material in c/with provision ofextension Rura and Phaphund Railway station, ALD Division of N.C.Rly.  05-11-2011  Passed   Document
 Construction  Engineering  Construction of ROB inlieu of level crossing no. 240-A at Rly.Km.1341 /13-14, near Dadanagar between GOY-BZM station on CNB-JHS section of N.C.Rly.  05-11-2011  Sent to accounts Ald   Document
 Construction  Engineering  Construction of staff quarters, level crossing, platform, station building, rest house and other miscellaneous work in connection with construction ofnew BG railway line between ETW-MNQ statino of ALD Dvn. of N.C.Rly.  05-11-2011  Passed   Document
 Construction  Engineering  Supplying, fabrication & erection/launching of steel girder on running tracks and casting of deck slab, crash barrier etc. on ROB at LC No.532 and supplying fabrication, No.532 and supplying fabrication, erection/launching of steel girder for the construction of composite girder for ROB at LC No.502 on running track  03-11-2011  bill passed   Document
 Construction  Engineering  Construction of duty bunk, earthwork, road work and other misc work at diufferent level crossing between Bhandai to Fatehabad (including yard) & construction of Height Gauge at RUB's between Bhandai-Udi section in connection with AGC-ETW Line.  03-11-2011  bill passed   Document
 Construction  Engineering  Linking of track, transportation of P.Way material, leading of ballast and misc. work related to track linking and earthwork blanketing from 36kms to 50kms Fatehabad-Manikpura section of AGC-ETW New BG Rail line  03-11-2011  bill passed   Document
 Construction  Engineering  Risk and cost, Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn of RCC Box type minor bridge and other ancillary works bet ch 84700m to 114100m in connection with AGC-ETW New BG rail Line  03-11-2011  bill passed   Document
 Construction  Engineering  Construction of staff quarters, level crossing, platform, station building, rest house and other miscellaneous work in connection with construction ofnew BG railway line between ETW-MNQ statino of ALD Dvn. of N.C.Rly.  30-10-2011     Document
 Construction  Engineering  Linking of BG track with 60 Kg/52 Kg onPRc sleepers density 1660/1540 nos. per Km. including spreading of ballast, linking of turn out, trap, making and fixing of guard rail, check rail and other P.way works etc. including dismantling of existing BG track, turn out, trap, diamond and leading, loading, uloading and stacking of P.Way material etc. between ETW-MNQ section including ETW-MNQ Karhal yard etc. in connection with construction of new BG rail line, ETW-MNQ of ALD Dvn of N.C.Rly.  30-10-2011  Passed   Document
 Construction  Electrical  work:-Electrification of washing pit line 460 mtr long ,with Battery charging facilities and supply, erection , testing,& commissioning of 2x500kva 11/0.4kv package type sub station at Gwalior..  27-10-2011     Document
 Construction  Electrical  Electrification of station buildings, platform, circulating area approach road , residential quarters etc. At various station in Bhandai-Samshabad-Udi section in connection with construction of new BG rail line.â?  27-10-2011     Document
 Construction  Electrical  Name of work:-,Supply,erection,testing and commissioning of 11KV OH line DP structure 63KVA 11/0.4 KV pole mounting type transformer, MDB, LT panels ETC in connection with stringing of dedicated feeder at 09 stations of Jhansi Division  27-10-2011     Document
 Construction  Electrical  Description of the work: ,Supply, erection, testing and commissioning of power supply equipments and other associated works in connection with augmentation of traction power supply arrangement of 132/25 KV TSS at Datia & lalitpur station  27-10-2011     Document
 Construction  Engineering  Fabrication and supply of SEJ, 60 Kg to RDSO Drg No. T-4165  18-10-2011  Bill sent to account on 18.10.2011   Document
 Construction  Engineering  Fabrication and supply SEJ, 52 Kg to RDSO Drg No. T-4160  18-10-2011  Bill sent to account on 18.10.2011   Document
 Construction  Engineering  Fabrication and supply of Switch Expansion Joint, 60 Kg to RDSO Drg No. T-4165  18-10-2011  Bill sent to account on 18.10.2011   Document
 Construction  Engineering  Fabrication and supply of Switch Expansion Joint, 60 Kg to RDSO Drg No. T-4165  18-10-2011  Bill sent to account on 18.10.2011   Document
 Construction  Engineering  Supply of SEJ, 52 Kg to RDSO Drg No. T-4160  18-10-2011  Bill sent to account on 18.10.2011   Document
 Construction  Engineering  Construction of staff quarters, level crossing, platform, station building, rest house and other miscellaneous work in connection with construction ofnew BG railway line between ETW-MNQ statino of ALD Dvn. of N.C.Rly.  21-10-2011  Passed   Document
 Construction  Engineering  Construction of Additional bridges in Agra-Etawah section in connection with construction of Agra-Etawah New BG Rail line.  17-10-2011  Passed   Document
 Construction  Engineering  Dismantling and linking of tracks, linking of turn outs and traps, deep screening, through packing, linking and dismantling of SEJ, insertions of glued joint, greasing of pandrol clips, removal of jammed pandrol clips etc. and other P.Way works at FTP, KBN, ETW, MNQ, ETUE etc. and any other station/section under jurisdiction of Dy.CE/C/CNB of ALD/AGC Divn. of N.C.Railway.  11-10-2011  Passed   Document
 Construction  Engineering  Provision of additional rooms with white washing, dismantling,snowsem.etc.in exiting officer rest house of Dy.CE/C/CNB unit and provision of two rooms for peon including other related works ofconst.officer house at Kanpur  11-10-2011  Passed   Document
 Construction  Engineering  Provision of roads, lifting barrier, Hand Pumps, fencing at L-Xings, construction of drains, pitching, toe walls, Nallah diversion, retaining walls, white wash , colour wash and other ancillary works in connection with opening of Bhandai-Manikapura section (0.00 to 50 kms) of AGC-ETW new BG Rail line..  11-10-2011  bill passed   Document
 Construction  Engineering  Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn of RCC Box type minor bridge and other ancillary works bet ch 63400m to 84700m in connection with AGC-ETW New BG rail Line  11-10-2011  Bill passed   Document
 Construction  Engineering  Manufacture and supply of Metal Liner to RDSO Drg. No. T-3741/42  07-10-2011  Bill sent to accounts on 07.10.2011   Document
 Construction  Engineering  Manufacture and supply of CMS Xing, 1 in 8.5, 52 Kg  07-10-2011  Bill sent to account on 07.10.2011   Document
 Construction  Engineering  Manufacture and supply of CMS Xing, 1 in 8.5, 60 Kg  07-10-2011  Bill sent to accounts on 07.10.2011   Document
 Construction  Engineering  Bill PVC ROB 86  04-10-2011  Passed   Document
 Construction  Engineering  bill ROB 99 & 102  04-10-2011  Passed   Document
 Construction  Engineering  8th bill ROB 86  04-10-2011  passed   Document
 Construction  Engineering  Supplying and stacking of machine crushed stone ballast 65MM aggregate conforming to specification no 101 (REV.2004) including all lead and lift as directed at indicated places between ch 34900M to ch 63000M (including Fatehabad, Manikpura stations) of AGC-ETW new B.G Rail line..  01-10-2011  12th bill   Document
 Construction  Engineering  Construction of Four lane ROB in lieu of existing level crossing No.502 Kms.1350/14 between Mathura-Agra section.  01-10-2011  10th bill   Document
 Construction  Engineering  Construction of New Six stations with the provision of L/L(Medium) platform both side and new H/L platform at Eight existing station including approach road RCC Fencing, name board etc. and other allied works in C/W MTJ-AWR Upgradation work.  28-09-2011  bill   Document
 Construction  Engineering  Supplying and stacking of machine crushed stone ballast 65MM aggregate conforming to specification no 101 (REV.2004) including all lead and lift as directed at indicated places between ch 34900M to ch 63000M (including Fatehabad, Manikpura stations) of AGC-ETW new B.G Rail line..  28-09-2011  Bill   Document
 Construction  Engineering  -Supplying, fabrication & erection/launching of steel girder on running tracks and casting of deck slab, crash barrier etc. on ROB at LC No.532 and supplying fabrication, erection/launching of steel girder for the construction of composite girder for ROB at LC No.502 on running track  28-09-2011  Bill passed   Document
 Construction  Engineering  Construction of Road Over Bridge (Four Lane) in lieu of LC No.491C at Kms.1337/4-6 in JHS-AGC section.  28-09-2011  Bill pass   Document
 Agra Division  Engineering  bills uploading position  25-09-2011  bills loading   Document
 Construction  Engineering  Supply of ERC Mark-III (T-3701)  23-09-2011     Document
 Construction  Engineering  PVC Bill ROB 86  23-09-2011     Document
 Workshop  JHS Workshop  Hiring of one No Non AC four Wheeler (Tavera/Tata Vista GX Turbo/ Qualis/Scorpio/Bolero or equivalent in good working condition with contractors own driver fuel maintenance taxes etc(Approx 1100 kms Per month) at Wagon Repair Workshop Jhansi for One Year  22-09-2011  Forwarded to WAO   Document
 Construction  Electrical  Supply,erection,testing and commissioning of 2x500 KVA package type sub station, battery charging facilities,precooling facilities and electrification of platforms station buildings etc. in MTJ-AH section.  21-09-2011     Document
 Construction  Engineering  Manufacture & supply of CMS Xing, 1-8.5,52 Kg  20-09-2011  billpassed   Document
 Construction  Engineering  Bill Linkining TDL-JAB  20-09-2011     Document
 Construction  Engineering  Bill ROB 136  20-09-2011     Document
 Construction  Engineering  Bill ROB 86  20-09-2011  Passed   Document
 Construction  Engineering  Bill ROB 99b & 102  20-09-2011  Passed   Document
 Construction  Engineering  4th bill ROB 139  20-09-2011  Passed   Document
 Construction  Engineering  Bill ROB Dadri  20-09-2011  Passed   Document
 Construction  Engineering  Supplying, fabrication & erection/launching of steel girder on running tracks and casting of deck slab, crash barrier etc. on ROB at LC No.532 and supplying fabrication, No.532 and supplying fabrication,  20-09-2011  Bill submitted   Document
 Construction  Engineering  Risk and cost, Earthwork in embankment and cutting including provision of mechanically crushed blended material blanketing layer and constn of RCC Box type minor bridge and other ancillary works bet ch 84700m to 114100m in connection with AGC-ETW New BG rail Line  20-09-2011  Bill submitted   Document
 Construction  Engineering  Residual work in Mahoba - Khajuraho Section (bet. Ch. 00 m to 65.150 kms.) i.e. trolley refuges, rain cuts, pitching, steps, steel fencing, nallah diversion, bridge approaches, catch water drain desitting and cleaning of side drains in cutting, ballast retaining wall, W.B.M. and public aiding near rub and other ancillary works  15-09-2011  Bill has been sent to Sr. AFA( C)JHS Office on 14.09.2011   Document
 Workshop  JHS Workshop  Fabricatoin supply and retrofitment of rail loading structure on 16 Nos. BRN wagons including 13 rail carrier (mid), 2 rail carrier (bulk head) and 3 Rampers and threaders  15-09-2011  forwarding to WAO/JHS   Document
 Workshop  JHS Workshop  Collection, segregation and disposal of 12000 MT Scrap from workshop Jhansi to stores depot, Jhansi & Collection, screening and disposal of 2100 m3 dust/debris from workshop Jhansi to designated inside Workshop.  15-09-2011  forwarded to WAO/JHS   Document
 Workshop  JHS Workshop  Hammering of incoming 6600 No.s per year BOX-N/BOX-C other type of wagons for removing the scales/rust from inside sidewalls, end walls, floor of wagons thereafter, sweeping and disposal of garbage / dust/ debris/ dirt and labeling the same at specified locaiton withing 500 meters at pocket yard for a period of two years.  15-09-2011  forwarded to WAO/JHS   Document
 Construction  Electrical  Electrification of approach road , administrative buildings , recreation hall ,mess, guard house, dinning hall , cook house , training shed, barracks, shopping complex, store shed etc and supply erection testing & commissioning of 2*500KVA 11/0.4kv package type sub station and other electrical works in connection with Raising of new Railway Engineers Regiment at Jhansi  14-09-2011     Document
 Construction  Engineering  Supplying and stacking of machine crushed stone ballast 65mm aggregate confirming to 101 (Rev 2004) including all lead and lift as directed at indicated places between ch 63000m to 75000m (including Bateshwar Station) in connection with AGC-ETW New BG Rail line  19-08-2011  bill submitted   Document
 Construction  Engineering  Construction of service bldg, store, workshop shed & inspection pit at Agra cantt for coaching line facilities at AGC Depot in connection with Agra-Etawah New BG Rail Line  20-07-2011     Document
 Construction  Engineering  R&C Balance left over work Earthwork in embankment & cutting including provision of mechanically crushed /blended material blanketing layer and constn of RCC Box type minor bridges bet ch.36400 to 63400m in connection with AGC-ETW new B.G line.  11-07-2011     Document
 Construction  Engineering  Hiring of TWO Nos Non AC Multy utility Motor TATA SUMO (Victa), Tevera, Bolero, Toyota Qualis or similar make in good working condition with comercial tax registration including driver, fuel, Crew, and maintenance etc. for a period of 12 months for the use of Dy.CE/C/AGC & XEN/C/II/AGC in connection with construction of MTJ-AH GC work , AGC-ETW work and other different works under Dy.CE/C/AGC  11-07-2011     Document
 Construction  Engineering  Hiring of TWO Nos Non AC Multy utility Motor TATA SUMO (Victa), Tevera, Bolero, Toyota Qualis or similar make in good working condition with comercial tax registration including driver, fuel, Crew, and maintenance etc. for a period of 12 months for the use of Dy.CE/C/AGC & XEN/C/II/AGC in connection with construction of MTJ-AH GC work , AGC-ETW work and other different works under Dy.CE/C/AGC  11-07-2011     Document
 Construction  Engineering  Bill ROB Dadri  07-07-2011  10th on account bill   Document
 Construction  Engineering  4TH Bill ROB 139  07-07-2011  4th on account bill   Document
 Construction  Engineering  Construction of washing pit. Service building, HS tank etc. in connection maintenance & Train preparation facilities at AGC  22-06-2011  bill   Document
 Construction  Engineering  Construction of Four lane ROB in lieu of existing level crossing No.502 Kms.1350/14 between Mathura-Agra section.  22-06-2011  bill   Document
 Construction  Engineering  Bill for constructin of ROB 136  21-06-2011  Passed   Document
 Construction  Engineering  bill  20-06-2011  Ist on account bill   Document
 Allahabad Division  Rajbhasha  75756765  05-11-2010     Document



  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2010  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.