| Division | Department | Tender Ref. No. | Tender Opening Date | Name Of Work |
| Allahabad Division | Engineering | ALD-1220132014-41 |
19-06-2013 |
Heavy repairs to platform surface circulating area and waiting room at JJK station under ADEN/NCR/ETW. Document Available
|
| Allahabad Division | Engineering | ALD-1220132014-42 |
19-06-2013 |
Heavy repairs to platform surface circulating area and waiting room at room at Bhartana station under ADEN/NCR/ETW. Document Available
|
| Allahabad Division | Engineering | ALD-1220132014-43 |
19-06-2013 |
SKB- Provision of temporary washable apron along with platform No. 1 (line no. 2) under ADEN/NCR/FZD. Document Available
|
| Allahabad Division | Engineering | ALD-1320132014-44 |
19-06-2013 |
Construction of limited height subway in place of level crossing No. 57-C, 61-C & 63-C (cut and cover method) in Barhan- Etah Section under Sr.DEN/V/ALD Document Available
|
| Allahabad Division | Engineering | ALD-1520132014-50 |
19-06-2013 |
Improvement of yard drainage at ALJN, KRJ & HRS in the section of Sr.DEN / V / ALD. Document Available
|
| Allahabad Division | Engineering | ALD-1520132014-51 |
19-06-2013 |
Provision of SSI Buildings at Manjoorgarhi station and Harduaganj Station in the section of ADEN / ALJN. Document Available
|
| Allahabad Division | Engineering | ALD-1520132014-52 |
19-06-2013 |
Through Rail Renewal of 33 Km. in DN Line in the section of ADEN / ALJN. Document Available
|
| Allahabad Division | S&T | ALD-713-Sig-OT- AMC-2013-14-06 |
19-06-2013 |
AMC of Voice Data logger processing unit for Control circuits at Allahabad & Tundla for three years. Document Available
|
| Headquarters | Stores | 60105050-A |
20-06-2013 |
PORTABLE HARDNESS TESTER MODEL D- 2 OF BLUE STAR MAKE OR MODEL DHT- 2 RB OBLIQUE AC OF FASNE TEST EQUIPMENT OR EQUAL AS PER TECHNICAL SPECIFICATION ATTACHED OF DATE 30.04.2010 (SPECIFICATION IN 04 PAGES).
|
| Construction | Engineering | CEN00ALJN0213/01 |
20-06-2013 |
Construction of Platforms, Covered shed and other Civil work etc. in connection with Aligarh Jn. Improvement station with provision of one
Dn loop & one platform balance work of RVNL. Document Available
|
| Construction | Engineering | CEN00ALJN0213/03 |
20-06-2013 |
Construction of Temporary Accommodation (Camp Office/Rest house) etc. under DY.CE/C/ALJN AT ALIGARH JN. Document Available
|
| Construction | Engineering | CEN00ALJN02113/04 |
20-06-2013 |
Hiring of One No. Non AC Multy utility Motor Vehicle/TATA SUMO (Victa),Tevera, Bolero, Toyoto/Qualis or similar make in good working condition withregistration including Driver, Fuel, Crew and maintenance etc. for a period of
12 months for the use of DY.CE/C/ALJN in connection with Construction of
ROBs and other different works under bet. ALJN-GZB section under
DY/CE/CALJN Document Available
|
| Construction | Engineering | CEN00ALJN0213/02 |
20-06-2013 |
Provision of loop lines, yard remodeling Aligarh Jn. and other P.way work in connection with Yard remodeling balance work of RVNL. Document Available
|
| Headquarters | Stores | E-Procurement Tender Notice No. 13/20Dt.13/05/2013 |
20-06-2013 |
On behalf of the President of India, Controller of stores, North Central Railway, Allahabad (An
ISO 9001:2000 certified unit) invites the attached E-Procurement Tenders.
|
| Construction | Engineering | CEN1160213 |
20-06-2013 |
Construction of Road Under Bridge in
lieu level crossing No.368 between
JHS -STLI Section( by box pushing
method) Document Available Corrigendum Available |
| Headquarters | Engineering | AGC/Br/2013-2014/01 |
20-06-2013 |
Diversion of Yamuna Kinara Road Through Span No. 8 to launch the steel girder of span No. 9 of Strachey Bridge ( Br. No. 167 ) Between AGA- JAB section of Agra division Document Available
|
| Jhansi Division | Engineering | JHS-Engg- 2013-12/A |
21-06-2013 |
ADEN/Line/Jhansi-
A. Replacement of 4 unit K-type
Quarters at Dabra.
B. Replacement of existing pipe line
under ADEN/Line/Jhansi.
C. Construction of new RPF barrack
at Dabra. Document Available
|
| Jhansi Division | Engineering | JHS-Engg- 2013-12/B |
21-06-2013 |
A. 11.27 Tr. Kms manual deep
screening work at various location on
Sithouli-Agra section under
SSE/P.way Gwalior/West.
B. CTR(P) = 1.220 Tr. Km, Glued
joints =25 sets and SEJ=15 sets track
renewal work on Sithouli-Agra
section under SSE/P.way
Gwalior/West.
C. Replacement of existing turnout,
derailing switch with new 60Kg/52Kg
fan shapped PSC layout turnouts /
derailing switches on Gwalior-Bhind
section under SSE/P.way
Gwalior/East. Document Available
|
| Jhansi Division | Engineering | JHS-Engg- 2013-12/C |
21-06-2013 |
Reconditioning of wheel burns,
scabbed rails & cupped weld joints
under ADEN/Mahoba sub-division. Document Available
|
| Jhansi Division | Engineering | JHS-Engg- 2013-12/D |
21-06-2013 |
Ancillary work for conversion of
SWR/FP track in to LWR of loop
lines in the jurisdiction of DEN/East
sub division. Document Available
|