Indian Railway main logo Welcome to Indian Railways
Search :  
Increase Font size Normal Font Decrease Font size
View Content in Hindi
National Emblem of India

About Us

IR Personnel

News & Recruitment

Tenders & Notices

Vendor Information

Passenger Services

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS
All Active CPP Tenders & Notices
DivisionDepartmentTender Ref. No.Tender Opening DateName Of Work
Allahabad DivisionEngineeringALD-1220132014-41 19-06-2013 Heavy repairs to platform surface circulating area and waiting room at JJK station under ADEN/NCR/ETW.
 
Document Available
Allahabad DivisionEngineeringALD-1220132014-42 19-06-2013 Heavy repairs to platform surface circulating area and waiting room at room at Bhartana station under ADEN/NCR/ETW.
 
Document Available
Allahabad DivisionEngineeringALD-1220132014-43 19-06-2013 SKB- Provision of temporary washable apron along with platform No. 1 (line no. 2) under ADEN/NCR/FZD.
 
Document Available
Allahabad DivisionEngineeringALD-1320132014-44 19-06-2013 Construction of limited height subway in place of level crossing No. 57-C, 61-C & 63-C (cut and cover method) in Barhan- Etah Section under Sr.DEN/V/ALD
 
Document Available
Allahabad DivisionEngineeringALD-1520132014-50 19-06-2013 Improvement of yard drainage at ALJN, KRJ & HRS in the section of Sr.DEN / V / ALD.
 
Document Available
Allahabad DivisionEngineeringALD-1520132014-51 19-06-2013 Provision of SSI Buildings at Manjoorgarhi station and Harduaganj Station in the section of ADEN / ALJN.
 
Document Available
Allahabad DivisionEngineeringALD-1520132014-52 19-06-2013 Through Rail Renewal of 33 Km. in DN Line in the section of ADEN / ALJN.
 
Document Available
Allahabad DivisionS&TALD-713-Sig-OT- AMC-2013-14-06 19-06-2013 AMC of Voice Data logger processing unit for Control circuits at Allahabad & Tundla for three years.
 
Document Available
HeadquartersStores60105050-A 20-06-2013 PORTABLE HARDNESS TESTER MODEL D- 2 OF BLUE STAR MAKE OR MODEL DHT- 2 RB OBLIQUE AC OF FASNE TEST EQUIPMENT OR EQUAL AS PER TECHNICAL SPECIFICATION ATTACHED OF DATE 30.04.2010 (SPECIFICATION IN 04 PAGES).
 

ConstructionEngineeringCEN00ALJN0213/01 20-06-2013 Construction of Platforms, Covered shed and other Civil work etc. in connection with Aligarh Jn. Improvement station with provision of one Dn loop & one platform balance work of RVNL.
 
Document Available
ConstructionEngineeringCEN00ALJN0213/03 20-06-2013 Construction of Temporary Accommodation (Camp Office/Rest house) etc. under DY.CE/C/ALJN AT ALIGARH JN.
 
Document Available
ConstructionEngineeringCEN00ALJN02113/04 20-06-2013 Hiring of One No. Non AC Multy utility Motor Vehicle/TATA SUMO (Victa),Tevera, Bolero, Toyoto/Qualis or similar make in good working condition withregistration including Driver, Fuel, Crew and maintenance etc. for a period of 12 months for the use of DY.CE/C/ALJN in connection with Construction of ROBs and other different works under bet. ALJN-GZB section under DY/CE/CALJN
 
Document Available
ConstructionEngineeringCEN00ALJN0213/02 20-06-2013 Provision of loop lines, yard remodeling Aligarh Jn. and other P.way work in connection with Yard remodeling balance work of RVNL.
 
Document Available
HeadquartersStoresE-Procurement Tender Notice No. 13/20Dt.13/05/2013 20-06-2013 On behalf of the President of India, Controller of stores, North Central Railway, Allahabad (An ISO 9001:2000 certified unit) invites the attached E-Procurement Tenders.
 

ConstructionEngineeringCEN1160213 20-06-2013 Construction of Road Under Bridge in lieu level crossing No.368 between JHS -STLI Section( by box pushing method)
 
Document Available
Corrigendum Available
HeadquartersEngineering AGC/Br/2013-2014/01 20-06-2013 Diversion of Yamuna Kinara Road Through Span No. 8 to launch the steel girder of span No. 9 of Strachey Bridge ( Br. No. 167 ) Between AGA- JAB section of Agra division
 
Document Available
Jhansi DivisionEngineeringJHS-Engg- 2013-12/A 21-06-2013 ADEN/Line/Jhansi- A. Replacement of 4 unit K-type Quarters at Dabra. B. Replacement of existing pipe line under ADEN/Line/Jhansi. C. Construction of new RPF barrack at Dabra.
 
Document Available
Jhansi DivisionEngineeringJHS-Engg- 2013-12/B 21-06-2013 A. 11.27 Tr. Kms manual deep screening work at various location on Sithouli-Agra section under SSE/P.way Gwalior/West. B. CTR(P) = 1.220 Tr. Km, Glued joints =25 sets and SEJ=15 sets track renewal work on Sithouli-Agra section under SSE/P.way Gwalior/West. C. Replacement of existing turnout, derailing switch with new 60Kg/52Kg fan shapped PSC layout turnouts / derailing switches on Gwalior-Bhind section under SSE/P.way Gwalior/East.
 
Document Available
Jhansi DivisionEngineeringJHS-Engg- 2013-12/C 21-06-2013 Reconditioning of wheel burns, scabbed rails & cupped weld joints under ADEN/Mahoba sub-division.
 
Document Available
Jhansi DivisionEngineeringJHS-Engg- 2013-12/D 21-06-2013 Ancillary work for conversion of SWR/FP track in to LWR of loop lines in the jurisdiction of DEN/East sub division.
 
Document Available
1 - 20  Of  (204)                 Next   Last



  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2010  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.